ML071900169
| ML071900169 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 08/06/2007 |
| From: | Mahesh Chawla NRC/NRR/ADRO/DORL/LPLIII-1 |
| To: | Balduzzi M Entergy Nuclear Operations |
| Chawla M, NRR/DORL, 415-8371 | |
| References | |
| TAC MD3166 | |
| Download: ML071900169 (5) | |
Text
August 6, 2007 Mr. Michael Balduzzi Sr. Vice President, Regional Operations NE Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PALISADES NUCLEAR PLANT - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FROM APPLICATION FOR REQUEST FOR RELIEF FROM ASME SECTION XI CODE REQUIREMENTS FOR REPAIR OF PRESSURIZER NOZZLE PENETRATIONS (TAC NO.
MD3166)
Dear Mr. Balduzzi:
On September 15, 2006, Nuclear Management Company, LLC (NMC, licensee at time of submittal), filed an application, pursuant to Section 50.55a of Title 10 of the Code of Federal Regulations (10 CFR 50.55a), that proposed an alternative repair technique for a pressurizer heater sleeve penetration repair at the Palisades Nuclear Plant. Entergy Nuclear Operations, Inc. has since become the current licensee, following a license transfer that occurred on April 11, 2007.
In its application dated September 15, 2006, the licensee submitted an affidavit dated September 12, 2006, executed by B. F. Maurer of Westinghouse Electric Company, LLC (Westinghouse), requesting that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR Part 2, Section 2.390:
LTR-MRCDA-06-171-P, Low Alloy Steel Component Corrosion Analysis Supporting NMC Small-Diameter Alloy 600 Nozzle Repair/Replacement Program at Palisades, which is Attachment 3 of Enclosure 2, to Request for Relief from ASME Section XI Code Requirements for Repair of Pressurizer Nozzle Penetrations, dated September 15, 2006.
A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agency Wide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a)
The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouses competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
M. Balduzzi (b)
It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c)
Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
We have reviewed the application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version(s) of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-8371.
Sincerely,
/RA/
Mahesh L. Chawla, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: See next page
ML071900169 OFFICE NRR/LPL3-1 NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/DCI/CPNB NRR/LPL3-1/(A)BC NAME RSun MChawla THarris TChan TTate DATE 07/12/07 08/ 03 /07 07/11/07 07/19/07 08/ 06 /07
Palisades Plant cc:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Supervisor Covert Township P. O. Box 35 Covert, MI 49043 Office of the Governor P. O. Box 30013 Lansing, MI 48909 U.S. Nuclear Regulatory Commission Resident Inspector's Office Palisades Plant 27782 Blue Star Memorial Highway Covert, MI 49043 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 Michigan Department of Attorney General Special Litigation Division 525 West Ottawa St.
Sixth Floor, G. Mennen Williams Building Lansing, MI 48913 Mr. Michael R. Kansler President & CEO/CNO Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. Vice President Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213 Sr. Vice President, Engineering and Technical Services Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Christopher J. Schwarz Site Vice President Entergy Nuclear Operations Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 General Manager, Plant Operations Entergy Nuclear Operations Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Mr. Ernest J. Harkness Director, Oversight Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. William C. Dennis Assistant General Counsel Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Mr. Joseph P. DeRoy VP, Operations Support Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Ms. Laurie A. Lahti Manager, Licensing Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. John A. Ventosa GM, Engineering Entergy Nuclear Operations 440 Hamilton Aveune White Plains, NY 10601 Director, NSA Palisades Nuclear Plant 27780 Blue star Memorial Highway Covert, MI 49043 Mr. William DiProfio 48 Bear Hill Road Newton, NH 03858 Mr. William T. Russell 400 Plantation lane Stevensville, MD 21666 Mr. Gary Randolph 1750 Ben Franklin Drive, 7E Sarasota, FL 34246