UNITED STATES NUCLEAR REGULATORY COMMISSION R E G I O N I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 July 2, 2007 John S. Keenan Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 770000 Mail Code B32 San Francisco, California 94177-0001

SUBJECT:

SUMMARY

OF ANNUAL PERFORMANCE ASSESSMENT MEETING FOR DIABLO CANYON POWER PLANT

Dear Mr. Keenan:

This refers to the public meeting conducted at the Embassy Suites Hotel in San Luis Obispo, California, on June 26, 2007, to discuss the safety performance at the Diablo Canyon Power Plant between January 1 and December 31, 2006.

Topics discussed during the meeting included the Reactor Oversight Process and the safety performance at Diablo Canyon Power Plant. Members of the public present at the meeting were allowed to ask questions and comments on the proceedings.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams. html (the Public Electronic Reading Room).

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Since re I y,

Vince Gaddy, C ief Division of Reactor Projects Project Branch 6 Dockets: 50-275: 50-323 Licenses: DPR-80: DPR-82

Enclosures:

1. Attendance List
2. NRC Presentation Slides

Pacific Gas and Electric Company cc w/enclosures:

Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Jane Swanson San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of County Government Building 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Supervisors Truman Burns\\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 941 02-3298 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Antonio Fernandez, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-01 12 James D. Boyd, Commissioner California Energy Commission 151 6 Ninth Street (MS 34)

Sacramento, CA 95814 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 941 11 Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 11 11 Broadway, Suite 1200 Oakland, CA 94607-4052 END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACI LlTY

/I DATElTl M E I1

//

LOCATION NAME (PLEASE PRINT)

~~~

Pacific Gas & Electric Company Diablo Canyon Power Plant June 26,2007 230 p.m.

Embassy Suites Hotel San Luis Obispo, CA 93405 Organization Page of

END-OF-CYCLE MEETING ATTENDANCE Ll CEN SEE/FACI LlTY DATE/TIM E LO CAT1 0 N NAME (PLEASE PRINT)

Pacific Gas & Electric Company Diablo Canyon Power Plant June 26,2007 2:30 p.m.

Embassy Suites Hotel San Luis Obispo, CA 93405 Organization Diablo Canyon Annual Assessment Meeting Reactor Oversight Program - CY 2006 Nuclear Regulatory Commission - Region IV June 26,2007 Purpose of Todays Meeting o A public forum for discussion of Diablo Canyons performance o Open dialogue between PG&E and NRC

- NRC to discuss Diablo Canyons performance

- Diablo Canyon will be given the opportunity to respond Agenda 0 Introduction 0 Review of Reactor Oversight Process 0 National Summary of Plant Performance Discussion of Plant Performance Results 0 Licensee Response and Remarks 0 NRC Closing Remarks 0 Question and Answer Session

NRC Representatives 0 Arthur Howell 111, Director, Division Reactor Projects o Vincent Gaddy, Branch Chief 0 John Lubinski, Deputy Director, Division of Operating (817) 860-8248 (817) 860-8141 Reactor Licensing (301) 415-1445 0 Teny Jackson, Senior Resident Inspector

@ Tony Brown, Resident Inspector (805) 595-2354 (805) 595-2354 Region IV Organization I

NRC Performance Goals

@ Safetv: Ensure protection of the public health and 0 Security: Ensure the secure use and management of 0 Openness: Ensure openness in our regulatory process 0 Effectiveness: Ensure that NRC actions are effective, 0 ManaEement: Ensure excellence in agency safety and the environment radioactive materials efficient, realistic, and timely management to carry out the NRC's strategic objective

Reactor Oversiqht Process F p ) bl-T+-l Performance indlcalor Slgnlflcance Significance Threshold Threshold

&tion Matrix Regulatory Response I

Examples of Baseline Inspections m Equipment Alignment

-80 hrslyr m Triennial Fire Protection o Operator Response

-125 hrs/yr

-200 hrsl3 yrs m Emergency Preparedness

-80 hrslyr

, o Rad Release Controls m Corrective Action Program

-1 10 hrs12 yrs

-250 hrsl2 yrs m Worker Radiation Protection

-90 hrslyr

~m Corrective Action Case Reviews -60 hrslyr I

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Yellow:

Substantial safety issue Red:

High safety issue Low to moderate safety issue

Action Matrix Concept Licensee Reponre Regulnmry Degraded MultiplelRep. Unacceptable Rwonre Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRCLicensee Managernen t Involvement Increasing Regulatory Actions

~

National Summary of Plant Performance Status at End of CY 2006 Licensee Response 70 Regulatory Response 24 Degraded Cornerstone 6

MultipleRepetitive Degraded Cornerstone 3

Unacceptable 0

I Total 103 Diablo Canyon Inspection Activities (Jan 1 - Dec 31,2006)

  • Baseline Inspection Program

. Unit 2 Refueling Outage A p d 17 - May 25

. Temporary Instructions

Temporary Instruction Inspections:

D 25 15/169 - Mitigating Systems Performance D 2515/165 - Operational Readiness of Offsite Index Verification Power Diablo Canyon Assessment Results (Jan 1 - Dec 31,2006)

. Licensee Response Column of the NRC Action Matrix

. No Greater Than Green Inspection Findings or Performance Indications

. PG&E Operated Diablo Canyon in a Manner That Preserved Public Health and Safety and Met All Cornerstone Objectives

. No Cross Cutting Issues - Although 2 of 3 Human Performance Criteria Met Human Performance Cross-Cutting

- More Than 3 Green Findings

- Common Theme - Adequacy of design documentation and procedures No Concern - Adequate Corrective Action

2007 Planned Inspection Activities Baseline Inspection Program i Maintenance Triennial i Emergency Preparedness Exercise i Occupational Radiation Safety D Temporary Instruction 5 2515/166 PWR Containment Sump Blockage Licensee Response and Remarks James Becker, Vice President Diablo Canyon Donna Jacobs, Vice President - Nuclear Services Pacific Gas and Electric Operations and Station Director I

Contacting the NRC e Report an emergency e Report a safety concern t Altegation@nrc.gov t (301) 816-5100 (call collect) t (800) 695-7403 0 General information or questions t www.nrc.gov Select What We Do for Public Affairs 0 Reactor Oversight Process http://www.nrc.gov/NFWOVERSIGHT/ASSESS/index.html e Public Electronic Reading Room c http://www.nrc.gov/reading-rm.html 0 Public Document Room F 1-800-397-4209 (To11 Free)