ML071780595

From kanterella
Jump to navigation Jump to search
Entergy'S Response in Opposition to New England Coalition'S Motion to Extend Time
ML071780595
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/20/2007
From: Travieso-Diaz M
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee, Pillsbury, Winthrop, Shaw, Pittman, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-271-LR, ASLBP 06-849-03-LR, RAS 13803
Download: ML071780595 (18)


Text

13-08cop June 20, 2007 UNITED STATES OF AMERICA DONCKEE NUCLEAR REGULATORY COMMISSION June 20,2007 (11:19am)

Before the Atomic Safety and Licensing Board OFFICE OF SECRETARY RULEMAKINGS AND In te Mater f )ADJUDICATIONS STAFF Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ASLBP No. 06-849-03-,LR (Vermont Yankee Nuclear Power Station))

ENTERGY'S RESPONSE IN OPPOSITION TO NEW ENGLAND COALITION'S MOTION TO EXTEND TIME Pursuant to 10 C.F.R. §2.323(c) and the directive of the Atomic Safety and.Licensing Board ("Board"), see Order (Setting Deadline for Answers to NEC Motion to Extend Time) dated June 19, 2007, Applicants Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (collectively "Entergy") provide this Response in opposition to New England Coalition, Inc. ("NEC")'s "Motion to Extend Time for NEC's Opposition to Entergy's Motion for Summary Disposition of New England Coalition's Contention 4 (Flow Accelerated Corrosion") ("NEC Motion"). NEC's motion is unsupported and should be denied.

NEC seeks a twenty day extension, beyond the twenty days allowed by 10 C.F.R. § 2.1 205(b), to respond to Entergy's Motion for Summary Disposition of New England Coalition's Contention 4 (Flow Accelerated Corrosion) ("Entergy's Sumnmary Disposition Motion"), filed on June 5, 2007.1 NEC claims it needs this additional time for two reasons: (1) because NEC's consultants need additional time to review "numerous" documents relevant to NEC Contention 4 that Entergy produced as part of its Seventh Supplemental Disclosure, on June 7, 2007; and (2) because NEC's consultants "are hindered by difficulties The requested period includes one week of vacation that NEC Counsel intends to take.

locating information among the large volume of documents Entergy has produced to NEC as non-text-searchable electronic image files." NEC Motion at 1-2. Neither alleged reason is valid.

Entergy produced only on document relevant to NEC Contention 4 as part of its June 7, 2007 Supplemental Disclosure: Dr. Jeffrey Horowitz's four-page "Summary of Observations During VY Site Visit" dated May 29, 2007.2 That document had already been provided to NEC, since it was Exhibit 3 to ilie "Joint Declaration of Jeffrey S. Horowitz and James C. Fitzpatrick in Support of Entergy's Motion for Summary Disposition~of NEC Contention 4", dated May 31, 2007 and was included with Enitergy's Summary Disposition Motion. It taxes credulity to' assert, as NEC does, that it needs a total of forty days to review a single, self-explanatory four-page document. 3 NEC's claim regarding "the large volume of documents" relevant to NEC Contention 4 that it allegedly needs to review is also grossly exaggerated. Entergy has produced a total of 190 documents relevant to NEC Contention 4 since the contention was admitted.4 See Exhibit 1 hereto. The first 130 of those documents (two-thirds of them), were produced with the initial disclosures on October 23, 2006, almost eight months ago. Id. The next 51 documents were 2 This four page document is at Bates-stamped pages NEC044876 - NEC044880 of Entergy's June 7, 2007 supplemental disclosure.

3' To the extent that NEC claims it needs to review the references cited in Dr. Horowitz's Summary of Observations During VY Site Visit (see NEC Motion at 2), all but one of those references were provided to NEC during disclosure, as follows: Ref. 1: produced on October 23, 2006 (Bates Nos. NEC005984 - NEC006012); Ref. 2:

produced on Dec. 7, 2006'(Bates Nos. NEC024377 - NEC024381); Ref. 3: produced on Dec. 7,2006 (Bates Nos.

NEC018576 -NEC018617); Ref. 4: produced on May 3, 2007 (Bates Nos. NEC038505 - NEC038512); Ref. 5:

produced on May 3, 2007 (Bates Nos. NEC038416 - NEC038418); Ref. 6: produced on May 3, 2007 (Bates Nos.

NEC038462 -NEC038504); Ref.7: Produced on May 3, 2007 (Bates Nos. NEC038513 -NEC038555); Ref. 8:

produced on May 3,2007 (Bates Nos. NEC038450 - NEC038461); Ref. 9: identified on proprietary log, Dec. 7, 2006; Ref. 10: produced on May 3, 2007 (Bates Nos. NEC038419 - NEC038449); Ref. 11: produced on May 3, 2006 (Bates Nos. NEC038398 - NEC0384 15); Ref. 12: produced on Dec. 7, 2006 (Bates Nos. NEC008692 -

NEC008877); Ref. 14: produced on Dec. 7, 2006 (Bates Nos. NEC017817 - NEC017850). Ref. 13, a twelve-page Entergy Nuclear Northeast procedure on component scanning and gridding, was mistakenly not produced previously but was e-mailed today.

NEC does not need to review these documents to respond to Entergy's Summary Disposition Motion, but assuming arguendo that it does, it has had all but one 12-page document for some time.

4 The reference to "4 gigabytes of documents," see NEC Motion at 2, refers to all documents on NEC Contentions 1-4 provided in discovery by Entergy. The vast majority of those documents are irrelevant to NEC Contention 4.

2

prdduced in the first supplemental discovery on December 7, 2006, over six months ago. Id. In othei words, NEC has had 181 out of the 190 documents relevant to Contention 4 since last year, and has had that much time to review all butrnine of the discovery documents relevant to the contention. Surely, NEC could have. easily ieviewed those documents had it applied itself to the task.

  • Of the remaining nine documents, eight were produced on May 3, 2007.5 They total a combined one hundred and sixty three (I163)'pages, and have. been available to NEC for a month atid'a half. Id. As previously stated, Entergy's supplemental disclosure on June 7, 2007 provided only one additional documrent relevant to Contention 4 - the above-mentioned four page '"Summaryof Observations During VY Site Visit." Thus, NEC aiid its consultants do not*

have -a"large volume" of documents to revie'w - they have had to review only nin documents relevant to Contention 4 this entire year, totaling well under 170 pages. Such a modest review burden cannot credibly be the basis for seeking an extension of time.

Moreover, if at any point since October 2006 NEC had experienced difficulty reviewing' or locating a particular document or documents, it could have asked Entergy for assistance or, if such help was unavailing, have sought the Board's intervention. 6 NEC has failed to do so until yesterday's motion, which should be denied as untimely as well as for lacking basis because under 10 C.F.R. § 2.323 (a) a motion "must be made no later than ten (10) days after the occurrence or circumstance from which the motion arises." If NEC was unhappy with the SThese eight documents are Bates-stamped as pages NEC038398 through NEC038561 in Entergy's May 3, 2007 disclosure.

6 For its Initial Disclosures on October 23, 2006, and all supplemental disclosures since, Entergy has used a standard discovery management software, Summation Blaze, to provide copies of relevant documents to NEC.

This software produces the documents on compact disk in image format so that each page may contain a bates-stamp number and conform to the original. It also provides a searchable index of the titles of the documents on each CD, from which each document may be accessed. All CDs that contain discovery documents for NEC Contentions 2-4 include such an index. NEC has received the disclosed documents in this format for the last eight months, but has never complained until Entergy's Summary Disposition Motion was filed.

3

document production format that Entergy has used from the incdption of this proceeding, it should have raised this -issue ten days after the initial disclosures - i.e., in early November 2006.~

In sumniary, NEC's Motion strongly suggests that NEC simply made no attempt to even look at any of Entergy's disclosures with respect to NEC Contention 4 until it received Entergy's Summary Disposition Motion. Any difficulties NEC may be encountering are, therefore, of its own making.

For the above described reasons NEC's MotioA is lacking in merit and should be denied.

Respectfully Submitted, David R., Lewis Matias F. Travieso-Diaz PILLSBURY. WINTHROP SHAW PITTMAN LLP' 2300 N Street, N.W.

Washington, DC 20037-1128 Tel. (202) 663-8000 Counsel for Entergy Dated: June 20, 2007 7' NEC's justification for its alleged difficulties - that the documents produced by Entergy are not fully searchable -

is hardly a justification. The NRC regulations do not require the production of documents in fully searchable form. Moreover, given the small number of documents and pages involved, no "full search" capability would be necessary. Careful reading of the documents would suffice.

4

.11

-UNITED STATES OF AMIERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of

'Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271 -LR and.Entergy Nuclear Operations, Inc. ASLBP No. 06-849-03-LR (Vermont Yankee Nuclear Power Station))

CERTIFICATE OF SERVICE I hereby certify that copies of "Entergy's Response in Opposition to New England Coalition's Motion to Extend Time," dated June 20, 2007, were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid, or with respect to Judge Elleman by overnight mail, and where indicated by an asterisk by electronic mail, this 20thý day of June, 2007.

  • Administrative Judge *Administrative Judge Alex S. Karlin, Esq., Chairman Dr. Richard E: Wardwell Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 ask2P~nrc. gov rewP~nre. gov
  • Administrative Judge *Secretary Dr. Thomas S. Elleman Att'n: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board Mail Stop 0-16 Cl 5207 Creedmoor Road, #10 1, U.S. Nuclear Regulatory Commission Raleigh, NC 27612. Washington, D.C. 20555-000 1 tseP~nrc.gov; elleman(~eos.ncsu.edu secv(~nrc.pgov , hearingdocket~nrc.gov

Office of Commission Appellate Adjudication Atomic Safety and Licensing Board Mail Stop 0-16 Cl Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-000 1 Washington, D.C. 20555-0001

  • Mitzi A. Young, Esq. *Sarah Hofmnann, Esq.
  • Mary C.Baty, Esq. Director of Public Advocacy Office of the General Counsel Department of Public Service Mail Stop 0-15 D21 112 State Street -Drawer 20 U.S. Nuclear Regulatory,Commission Montpelier, VT 05620-260 1 Washington, D.C. 20555-0001 mavanrc. gov; Sarah.bofmann(a-state.vt.u§ mcb 1~nrc. gov
  • Anthony Z. Roisman, Esq. *Ronald A. Shems, Esq.

National Legal Scholars Law Firm *Karen Tyler, Esq.

84 East Thetford Road Shems, Dunkiel, Kassel & Saunders, PLLC Lyme, NH 03768 91 College Street aroismana~nationallegpalscholars.com Burlington; VT 05401 rshems(@,sdkslaw.com ktvler(@sdkslaw.com

  • Peter C. L. Roth, Esq. *Marcia Carpentier, Esq.

Senior Assistant Attorney General Law Clerk.

State of New Hampshire Atomic Safety and Licensing Board Panel Office of the Attorney'Gdtieral Mail Stop: T-3F23 33 Capitol Street U.S. Nuclear Regulatory Commission Concord., NH 03301 Washington, DC 20555-000 1 Peter.Roth(@doj .nh.gov mxc7P~nrc.gov r P'1C-

ýA 4^-ft Mvatias F. Travieso-DiA 2

M Exhibit I - Documents Produced for Contention NEC-4 (all productions)

Doc. No. Prodno Bates Range Document Title CD Production Date Docid NECO01016 NECO01016 - NECO01017 Email re Vermont License Renewal FAC question NEC CD- iInitial Disclosure 10/23/20096 00O1 554 1

NECO01iO18 NECO01018B- NECO01019 Email re Vermont License Renewal FAC question NEC CD-i Initial Disclosure 10/23/2006 LR001555 2

NECO01020 NECO01020 - NECO01022 Email re Vermont License Renewal FAC question NEC CD-i Initial Disclosure 10/2312006 LROO11556 3

NECO01023 NECO01023 - NEC001024 Email re FAC Sample Expansion Issue NEC CD-I Initial Disclosure 10/23/2006- LROO 1557 4

NECO01025 NECO01025 - NECO01025 FAC Sample Expansion Issue NEC CD-I Initial Disclosure 10/23/i006 LROO1 558 5

NECO01026 NECO01026 - NECO01028 Email re Vermnont Licens-e Renewa~l FAC question NEC CD-i Initial Disclosure 10/23/2006 LR001559 6

NECO01029 NECO01029 - NECO01030 Email re FAC Program information NEC CD-i Initial Disclosure 10/23/2006 LR001560 7

NECO01031 NECO01031 - NECO01070 Review and Approval Tracking Form re Program for NEC CD-i Initial Disclosure 10/23/2006 LROO1 561 8 Implementing IFAC Inspection Program NECO01071 NECO01 071 - NECO01099 Procedure re Flow Accelerated Corrosion Program, NEC CD-i Initial Disclosure 10/23/2006 LR001564 9 Rev. 1 NECOOI 100 NECOOI100- NECO01 110 Input to NEC Contention 4 - Presentation on Flow NEC CD-i Initial Disclosure 10/23/2006 LROO1565 10 Acceleated Corosion NECOOl 130 NECOOl 130 - NECOOl 130 Email forwarding VY Appendix B NEC CD-i Initial Disclosure 10/23/2006 LR001592 11 NECOO1 131 NECOOl 131 - NEC001254 Appendix B - VY License Renewal Application NEC CD-i Initial Disclosure 10/23/2006 LR001593 Tehnical Information re aging management program 12 NECO03071 NECO03071 - NEC003072 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LR001779 Undated draft document related to Flow-Accelerated Corrosion / Program Description 13 NEC003073 NEC003073 - NEC003074 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1 780 Undated draft Flow-Accelerated CorrosionI 14 Program Description NEC003075 NEC003075 - NEC003076 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LR00.1781 Undated draft Flow-Accelerated Corrosion!

15 Program Description NEC003077 NEC003077 - NEC003078 License Renewal Application Technical Information NEC- CD-i Initial Disclosure -10/23/2006 LR001782 Undated draft FlowAccelerated / Program 16 Description NEC003079 NEC003079 - NECO03080 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1 783 Undated draft Flow-Accelerated Corrosion!

17 Program Description 6/2012007

Exhibit 1 - Documents Produced. for Contention NEC-4 (all productions)

NECO03081 NECO03081 - NEC003082 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1784 Undated draft Flow-Accelerated CorrosionI 18 Program Description NEC003083 NEC003083 - NECO03084 License Renewal Application Technical Information NEC CD-i InitialI Disclosure 10/23/2006 LROO1 785

- Undated draft Flow-Accelerated CorrosionI 19 Program Description NEC003085 NEC003085 - NECO03087 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1786 Undated draft Flow-Accelerated CorrosionI 20 Program Description NECO03088 NECO03088 - NEC003089 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1 787 Undated draft Flow-Accelerated CorrosionI 21 Program Description NECO03090 NECO03090 - NECO03091 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1 788 Undated draft Flow-Accelerated CorrosionI 22 Program Description NEC003092 NEC003092 - NEC003093 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1 789 Undated draft Flow-Accelerated CorrosionI 23 Program Description NEC003094 NEC003094 - NEC003095 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1 790 Undated draft Flow-Accelerated CorrosionI 24 Program Description NEC003096 NEC003096 - NEC003097 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LR001791 Undated draft Flow-Accelerated Corrosion/

25 Program Description NEC003098 NEC003098 - NEC003099 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1 792 Undated draft Flow-Accelerated CorrosionI 26 Program Description NECO03100 NECO03100 - NECO03102 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LRO01793 Undated draft Flow-Accelerated CorrosionI 27 Program Description NECO03103 NECO03103 - NECO03105 License Renewal Application Technical Information NEC CD-I Initial Disclosure 10/23/2006

  • LR001794 Undated draft Flow-Accelerated CorrosionI 28 Program Description NECO03106 NECO03106 - NECO03108 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LROO1 795 Undated draft Flow-Accelerated CorrosionI 29 Program Description NECO03109 NECO03109 - NECO031 10 License Renewal Application Technical Information NEC CD-i Initial Disclosure 10/23/2006 LR001796 Undated draft Flow-Accelerated Corrosion Program IDecember 2006 hand written on draft.

30 NECO0321 1 NECO03211I - NEC003225 WYNPS LR Project Evaluation Results NEC CD-i Initial Disclosur e 10/23/2006 LR00 1813 31 NEC004213 NEC004213 - NEC004219. LR Project Evaluation Results NEC CD-i Initial Disclosure 10/23/2006 LR001820 32 6/20/2007

Exhibit I - Documents Produced for Contention NEC-4 (all productions)

NEC004220 NECO04220 - NEC004222 LR Project Aging Management Program Evaluation NEC CD-i Initial Disclosure 10/23/2006 LROO1 821 33 Results- Corrective Action Program NECO04472 NECO04472 - NEC004472 LR Application FAC Questions asked during NRC NEC CD-i Initial Disclosure 10/23/2006 LROO1913 34 Audit NEC004473 NECO04473 - NEC004688 Feedwater Pump Room NEC CD-i Initial Disclosure 10/23/2006 LROO1919 35 NEC004689 NECO04689 - NECO04740 Department Procedure 0072 Original DP 0072 NEC CD-i Initial Disclosure 10/23/2006 LROO1 921 Structural Evaluation Of Thinned Walled Piping 36 Components NECO04741 NECO04741 - NEC004768 Procedure Cancellation DP 4023 Piping Flow. NEC CD-I Initial Disclosure 10/23/2006 LROO1 922 37 Accelerated Corrosion -

NEC004769 NECO04769 - NEC004769 WY Keyword'Search 1999-01701 for Feedwater NEC CD-i Initial Disclosure ~0/23/2b06 1 LROO1 923 38 Heaters NEC004770 NEC004770 - NEC004770 Keyword Search CR-V1Y-2002-02496 & CR-VTY- NEC CD-i Initial Disclosure 10/23/2006 LROO1 924 39 2002-02568 for Extraction Steam NEC004771 NEC004771 - NEC004771 Quarterly trend CR-VTY-2002-02568 for Extraction NEC CD-I Initial Disclosure 10/23/2006 LR001925 40 Steam NEC004772 NECO04772 - NEC004784 LR Project Aging Management Program Evaluation NEC CD-i Initial Disclosure 10/23/2006 LROO1 927 41 Results NECO04785 NECO04785 - NECO04800 LR Project Aging Management Program Evaluation NEC CD-i Initial Disclosure 10/23/2006 LROO1 928 42 Results NECO04801 NECO04801 - NEC004815 LR Project Aging Management Program Evaluation NEC CD-i Initial Disclosure 10/23/2006 LR001929 43 Results NECO04816 NECO04816 - NEC004823 LR Project Aging Management Program Evaluation NEC CD-i Initial Disclosure 10/23/2006 LROO1 930 44 Results NECO04824 NEC004824 - NEC004824 LR Project Operating Experience Review Report NEC CD-i Initial Disclosure 10/23/2006 LROO1 931 45 NEC004825 NEC004825 - NEC004825 LR Project Operating Experience Review Report NEC CD-i Initial Disclosure 10/23/2006 LROO1 932 46 NEC004826 NEC004826 - NEC004827 LR Project Operating Experience Review Report NEC CD-i Initial Disclosure 10/23/2006 LROO1 933 47 NEC004828 NEC004828 - NEC004828 Operating Experience Review Report, LRPD-05; NEC CD-i Initial Disclosure 10/23/2006 LROO1 934 48 Rev. 0 - Flow Accelerated Corrosion Program NEC004829 NEC004829 - NEC004880 Procedure re Structural Evaluation of Thinned Wall NEC CD-I Initial Disclosure 10/23/2006 LROO1i935 Piping Components DP0072 Original LPC 1 49 NEC004881 NEC004881 - NECO04913 Piping Flow Accelerated Corrosion Inspection NEC CD-i Initial Disclosure 10/23/2006 LROO1 936 50 Program - FAC Susceptible Piping Identiflation NEC004914 NEC004914 - NEC005049 Piping Flow Accelerated Corrosion Inspection NEC CD-i Initial Disclosure 10/23/2006 LR001937 51 Program PP 7028 Original LPC-1 NECO05050 NECO05050 - NEC005055 Aging Management Program Evaluation Results; NEC CD-i Initial Disclosure I10/23/2006 LROO1 938 Flow Accelerated Corrosion Program; LRPD-02, 52 Rev. 0 6/20/2007

Exhibit I - Documents Produced. for Contention NEC-4 (all productions)

NEC005056 NECO05056 - NEC005058 Aging management Program Evaluation Results; NEC CD-I Initial Disclosure 10/23/2006 LROO1 939 53 LRPD-02, Rev. 0 NEC005059 NEC005059 - NEC005064. Aging Management Program Evaluation Results; NEC CD-i Initial Disclosure 10/23/2006 LROO1 940 Flow Accelerated Corrosion Program, LRPD-02, 54 Rev. 1 NEC005065 NEC005065 - NEC005067 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1941 55 LRPD-02, Rev. 1 NEC005068 NEC005068 - NEC005073 Aging Management Program Evaluation Results; NEC CD-i Initial Disclosure 10/23/2006 LROO1 942 Flow Accelerated Corrosion Program, LRPD-02, 56 Rev. 1 NEC005074 NEC005074 - NEC005076 Aging Management Program Evaluation Results NEC CD-i Initial Disclosure 10/23/2006 LROO1 943 57 LRPD-02, Rev. 1 NEC005077 NEC005077 - NEC005215 Piping Flow Accelerated Corrosion Inspection NEC CD-i Initial Disclosure 10/23/2006 LROO1 944 58 Program PP 7028 LPC-1 NEC005216 NEC005216 - NEC005220 Program Owner Interview Results *NEC CD-i Initial Disclosure 10/23/2006 LROO1 945 59 NEC005221 NEC005221 - NEC005238 Quality Assurance Evaluation of Engineering NEC CD-i Initial Disclosure 10/23/2006 LROO1 946 60 Programs NEC005239 NEC005239 - NEC005239 Memorandum re 2002 Refueling Outage Piping NEC CD-i Initial Disclosure 10/23/2006 LROO1 947 Flow Accelerated Corrosion Inspection Summary 61 NEC005240 NEC005240 - NEC005241 Operating Experience Review Report, Flow NEC CD-i Initial Disclosure 10/23/2006 LROO1 948 Accelerated Corrosion Program, LRPD-05, Rev. 0 62 NEC005242 NEC005242 - NEC005243 Operating Experience Review Report, Flow NEC CD-i Initial Disclosure 10/23/2006 LROO1 949 Accelerated Corrosion Program, LRPD-05, Rev. 0 63 NEC005244 NECO05244 - NEC005245 perating Experience Review Report, Flow NEC CD-i Initial Disclosure 10/23/2006 LROO1 950 Accelerated Corrosion Program, LRPD-05, Rev. 0, 64 NEC005246 NEC005246 - NEC005247 Operating Experience Review Report, Flow NEC CD-i Initial Disclosure 10/23/2006 LROO1951 Accelerated Corrosion Program, LRPD-05, Rev. 0 65 NEC005248 NEC005248 - NEC005249 Operating Experience Review Report, Flow NEC CD-i Initial Disclosure 10/23/2006 LROO1 952 Accelerated Corrosion Program, LRPD-05, Rev. 0 66 NEC0052.50 NEC005250 - NEC005251 Monitoring Program - Flow Accelerated Corrosion NEC CD-i Initial Disclosure 10/23/2006 LROO1 953 67 Program NEC005252 NEC005252 -.NEC005253 Operating Experience Review Report Section 3.8.1, NEC CD-i Initial Disclosure 10/23/2006 LR001954 Flow-Accelerated Corrosion Program, LR3-VY-68 LRPD-05, DRAFT A 10-09-04 FAC NECO05254 NEC005254 - NEC005255 Operating Experience Review Report Section 3.81, NEC CD-i Initial Disclosure 10/23/2006 LRO01 955 Flow-Accelerated Corrosion Program, LR3-VY-69 LRPD-05, DRAFT A 101104 FAC 6/20/2007

Exhibit I - Documents Produced for Contention NEC-4 (all productions)

NEC005256 NEC005256 - NEC005257 Operating Experience Review Report Section 3.8.1, NEC CD-i Initial Disclosure 10/2312006 LR001956 Flow-Accelerated Corrosion Program, LR3-VY-70 LRPD-05, DRAFT A, 101204 FAC:

NEC005258 NECO05258 - NEC005259 Operating Experience Review Report Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 957 3.8.14, Flow-Accelerated Corrosion Program, LR3-71 .VY-LRPD-05, DRAFT A. 101304 FAC NECO05260 NEC005260 - NEC005261 Operating Experience Review Report Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 958 3.8.14, Flow-Accelerated Corrosion Program, LR3-72 VY-LRPD-05, DRAFT A, 101304 Test FAC NEC005262 NEC005262 - NEC005263 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 959 1.1.1, LR3-wY-LRPD-05,-DRAFT-B, 101304 FAC 73 NECO05264 NEC005264 - NEC005267 Operating Experience Review Report, Section 1.1.1 NEC CD-i Initial Disclosure 10/23/2006 LR001960 Flow-Accelerated Corrosion Program, LR3-VY-74 LRPD-05, Revision 0, Draft C, 1/5105 FAC:

NEC005268 NEC005268 - NEC005270 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LR001961 1.1.1, Flow-Accelerated Corrosion Program, LR3-75, VY-LRPD-05, Draft C, 1/6/05 FAC:

NECO05271 NECO05271 - NEC005273 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 962 1.1.1, Flow-Accelerated Corrosion Program, LR3-76 VY-LRPD-05, Draft C, 1605A FAC NECO05274 NECO05274 - NEC005276 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006. LR001963 1.1.1, Flow-Accelerated Corrosion Program, LR3-

.77 VY-LRPD-05, Draft C, V1105 FAC NECO05277 NEC005277 - NEC005279 Operating Experience Review Report, Section NEC CD-i Initial Diselosurb 10/23/2006 LROO1 964 1.1.1, Flow-Accelerated Corrosion Program, LR3-78 VY-LRPD-05, Draft C, 1/111/05 FAC NEC005280 NEC005280 - NEC005282 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 965 1.1.1, Flow-Accelerated Corrosion Program, LR3-79 VY-LRPD-05, Draft C, 11/11/04 FAC NECO05283 NEC005283. - NEC005285 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/2312006 LROO1 966 1.1.1, Flow-Accelerated Corrosion Program, LR3-80 VY-LRPD-05, Draft C, 11/12/04 FAC NECO05286 NEC005286 - NEC005287 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 967 1.1.1, Flow-Accelerated Corrosion Program, LR3-81 VY-LRPD-05, Draft C, 11/13104 FAC NEC005288 NEC005288 - NEC005289 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 968 1.1.1, Flow-Accelerated Corrosion Program, LR3-82 VY-LRPD-05, Draft C, 11/15/04 FAC NECO05290 NEC005290 - NEC005291 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LR001969 1.1.1, Flow-Accelerated Corrosion Program, LR3-83 VY-LRPD-05, Draft C, 11/17/04 FAC 6/20/2007

Exhibit I - Documents Produced for Contention NEC-4 (all productions)

NECO05292 NEC005292 - NEC005293 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 970 1.1.1,*Flow-Accelerated Corrosion Program, LR3-84 VY-LRPD-05, Draft C, 12/01104 FAC

.NEC005294 NECO05294 - NEC005296 Operating Experience Review Report, Section NEC CD-i Initial Disclosure .10/23/2006 LROO1971

- 1.1.1

  • Flow-Accelerated Corrosion Program, LR3-85 VY-LRPD-05, Draft C, 12/09/04 FAC:

NECO05297 NECO05297 - NEC005298 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 972 1.1.1

  • Flow-Accelerated Corrosion Program-, LR3-86 VY-LRPD-05, Draft C, 12110/04 FAC NEC005299 NECO05299 - NECO05300 Operating Experience Review Report, Section NEC CD-i Initial Disclosure .10/23/2006 LROO1 973 1.1.1,*Flow-Accelerated Corrosion Program, LR3-87 WY-LRPD-05, Draft C, 12/13/04 FAC NECO05301 N.ECO05301 - NEC005302 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 974 1.1.1, Flow-Accelerated Corrosion Program, LR3-88 WY-LRPD-05, Draft C, 12/14/04 FAC NEC005303 NECO05303 - NEC005304 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006. LROO1 975 1.1.1, Flow-Accelerated Corrosion Program, LR3-89 WY-LRPD-05, Draft C, 1214a04 FAC NEC005305 NEC005305 - NEC005307 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LR001976 1.1.1, Flow-Accelerated Corrosion Program, LR3-_

90 VY-LRPD-05, Draft C, 12/115/04 FAC:

NEC005308 NECO05308 - NEC005310 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 977 1.1.1, Flow-Accelerated Corrosion Program, LR3-91 WY-LRPD-05, Draft C, 12/17/04 FAC NECO0531 1 NECOO53111 - NEC005313 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 978 1.1.1, Flow-Accelerated Corrosion Program, LR3-92 VY-LRPD-05, Draft C, 12121/04 FAC NEC005314 NEC005314 - NEC005315 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1 979 1.1.1, Flow-Accelerated Corrosion Program, LR3-93 VY-LRPD-05, Draft C, 12120/04 FAC:

NEC005316 NEC005316 - NEC005318 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006 LROO1980 1.1.1, Flow-Accelerated Corrosion Program, LR3-94 VY-LRPD-05, Draft C, 12128/04 FAC:

NEC00531 9 NECO05319 - NEC005321 Operating Experience Review Report, Section NEC CD-I Initial Disclosure 10/23/2006 LROO1981 i.1.1, Flow-Accelerated Corrosion Program, LR3-95 VY-LRPD-05, Draft C, 12129/04 FAC NECO05322 NEC005322 - NEC005324 Operating Experience Review Report, Section NEC CD-I Initial Disclosure 10/23/2006 LROO1 982 1.1.1, Flow-Accelerated Corrosion Program, LR3-96 VY-LRPD-05, Draft C, 12130/04 FAC:

NECO05325 NECO05325 - NEC005327 Operating Experience Review Report, Section NEC CD-i Initial Disclosure 10/23/2006. LROO1 983 1.1.1, Flow-Accelerated Corrosion Program, LR3-97 VY-LRPD-05, Draft C, 12131/04 FAC 6/20/2007

Exhibit I - Documents Produced for Contention NEC-4 (all productions)

NEC005328 NEC005328 - NEC005343 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 984 LR3-LRPD-02, Revision 0, Fatigue Monitoring 98 Program, Draft B, 8/1104 NEC005344 NEC005344 - NEC005359 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 985 LR3-LRPD-02, Revision 0, Fatigue Monitoring 99 Program, 1/9/06 NEC005360 NEC005360 - NEC005375 Aging Management Program Evaluation Results, NEC CD-I Initial Disclosure 10/23/2006 L13001 986 LR3-LRPD-02, Revision 0, Fatigue Monitoring 100 Program, 1/91/66 NEC005376 NEC005376 - NEC005390 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 987

- LR3-LRPD-02, Revision 0, Fatigue Monitoring 101 Program, 1/10/06 -

NEC005391 NEC005391 - NEC005405 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure -10/23/2006 .LROOI 988 LR3-LRPD-02, Revision 0, Fatigue Monitoring 102 Program, 1/16/06 NECO05406 NECO05406 - NEC005420 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 989 LR3-LRPD-02 Revision 0, Fatigue Monitoring 103 Program, 12121105 NEC005421 NEC005421 - NEC005435 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 990 LR3-LRPD-02, Revision 0, Fatigue Monitoring 104 Program, 10/04/05 NEC005436 NEC005436 - NEC005451 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 991 LR3-LRPD-02, Revision 0, Fatigue Monitoring 105 Program, 10106/05 NEC005452 NEC005452 - NEC005466 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 992 LR3-LRPD-02, Revision 0, Fatigue Monitoring 106 Program, 11/8/05 NEC005467 NEC005467 - NEC005482 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 993 LR3-LRPD-02, Revision 0, Fatigue Monitoring 107 Program, 11/15/05 NEC005483 NEC005483 - NEC005497 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 994 LR3-LRPD-02, Revision 0, Fatigue Monitorinig 108 Program, 11116/05 NEC005498 NEC005498 - NEC005512 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROQ1 995 LR3-LRPD-02, Revision 0, Fatigue Monitoring 109 Program, 11/17/05 NECO0551 3 NEC005513 - NEC005527 Aging Management Program Evaluation Results, NEC CD-i Initial Disclosure 10/23/2006 LROO1 996 LR3-LRPD-02, Revision 0, Fatigue Monitoring 110 Program, 11121/05*

NEC005676 NEC005676 - NEC005679 Screen Shot of Network Storage Location for NEC CD-i Initial Disclosure 10/23/2006 LR002050 Ill Document Collection - Trial folders and contens NEC005723 NEC005723 - NEC005808 NEC Petition to Intervene, Docket No. 50-217 NEC CD-21Initial Disclosure 10/23/2006 LR002104 112 6/20/2007.

Exhibit I - Documents Produced for Contention NEC-4 (all productions)

NEC005818 NEC005818 - NEC005821 Print Screen of Test Folders NEC CD-2 initial Disclosure 10/23/2006 LROO21 27 113 NEC005898 NEC005898 - NEC005983. Letter from NEC RE: NEC Petition to Intervene, NEC CD-2 initial Disclosure 10/23/2006 LROO2172 114 Docket No. 50-217 NEC005984 NEC005984 - NECO06012 ENN-DC-315 Rev 1 Flow Acceleration Corrosion NEC CD-2 Initial Disclosure 10/23/2006 LROO21 76 115 Program NECO06013 NECO06013 - NEC006023 EPU Presentation to Advisory Committee on NEC CD-2 Initial Disclosure 10/23/2006 LR002177 Reactor Safeguards NEC006024 NEC006024 - NEC006025 Norman Rademacher Work contact information NEC CD-2 Initial Disclosure 10/23/2006 LR0021 90 117 NEC006026 NEC006026 - NEC006029 LR Database Screens for Potential Contentions NEC CD-2 Initial Disclosure 10/23/2006 LR002202 118 NECO06030 NECO06030 - NEC006033

Subject:

License Renewal Application, NEC CD-2 Initial Disclosure 10/23/2006 LR002206 Ammendiment 13 Transmittal letter from Ted Sullivan, EntergyNVY, to NRC for Amnmendment 13.

119 Docket No. 50-271 NEC007768 NEC007768 - NEC007797 XLetter to Entergy from Clifford J. Anderson, Chief NEC CD-2 Initial Disclosure 10/23/2006 LR002858 Projects Branch 5, Division of Reactor Projects RE:

120 NRC lntergrated Inspection Report.

NEC007798 NEC007798 - NECO07800 Advisory Committee on Reactor Safeguards, NEC CD-2 Initial Disclosure 10/2 3/2006 LR002859 Subcommitee on Uprates, Transcript (Nov. 30, 121 2005)

NECO07801 NEC007801 - NEC008138 Original Official Transcript of Proceedings Advisory NEC CD-2 Initial Disclosure 10/23/2006 LR002860 Committee on Reactor Safeguards, Subcommitee on Uprates, Transcript (Nov. 30, 2005) NRC-751 122 NEC008139 NEC008139 - NEC008355 Letter from Entergy to NRC RE: EPU Reponse to NEC CD-2 Initial Disclosure 10/23/2006 LR002861 123 RAls NEC008675 NEC008675 - NEC008691 Letter from entergy to NRC RE: EPU Response to NEC CD-2 Initial Disclosure 10/23/2006 LR003275 124 RAls NEC008692 NEC008692 - NEC008877 Draft WY Piping Flow Accelerated Corrosion NEC CD-2 Initilal Disclosure 10/23/2006 LR003278 Inspection Program EPRI Checworks Wear Rate 125 Analysis Results (with hand written notes)

NEC008878 NEC008878 - NECO09141 VY Piping FAC Inspection Program records for the NEC CD-21Initial Disclosure 10/23/2006 LR003279 126 1996 Refueling Outage NEC009142 NEC009142 - NEC009548 VY Piping FAC Inspection Program records for the NEC CD-2 Initial Disclosure LR003280 127 1998 Refueling Outage 10/23/2006 NEC009549 NEC009549 - NEC009895 'A' Piping FAC Inspection Program records for the NEC CD-2 Initial Disclosure LR003281

'128 1999 Refueling Outage 10/23/2006 NEC009896 NEC009896 - NEC009906 Checworks Integrated Software for Corrosion NEC CD-2 Initial Disclosure LR003283 129 Control 10/23/2006 NEC009907 NEC009907 - NECO09910 Article RE: Predicting corrosion damage with the NEC CD-2 Initial Disclosure LR003284 130 .. CHECWORKS software package 6/20/2007

Exhibit I - Documents Produced for Contention NEC-4 (all productions)

NEC017321 NEC017321 - NECO17321 Vermont License Renewal FAC question NEC CD-s Supplement 1 1211/2006 LR002788 131 Disclosure NECO1 7322 NEC017322 - NECO17323 Entergy License Renewal and FAC NEC CD-s Supplement 1 12/7/2006 LR002789 132 Disclosure NECO17324 NEC017324 - NEC017343 FN: Entergy Nuclear Vermont Yankee LLC (Dkt NEC CD-s Supplement 1 1217/2006 LR002800 133 No. 50-2711-1-1) Disclosure NECO17737 NEC017737 - NEC017788 VY Department Procedure 0072 DP 0072 NEC CD-s Supplement 1 1217/2006 LR002890 Structural Evaluation of Thinned Wall Piping Disclosure 134 Components -LPC-1 NECO17789 NEC017789 - NEC017816 Procedure Cancellation DP 4023 Rev 2 NEC CD-s Supplement 1 1217/20)06 LR002891 135 Disclosure NEC017817 NEC017817 - NEC017850 ENN-CS-S-008 Pipe Will Thinning Structural NEC CD-s Supplement 1 .12(7/2006 LR002892 136 Evaluation Disclosure NEC017851 NEC017851 - NEC017879 ENN-DC-315 Revi / FAC Program NEC CD-s Supplement 1 1211/2006 LR002893 137 Disclosure NECO17880 NEC017880 - NEC017887 ENN-NDE-9.05 UIT Thickness NEC CD-s Supplement 1 1217/2006 LR002894 138 Disclosure NECO17888 NECO17888 - NEC017912 VY Piping FAC Inspection Program PP 7028 NEC CD-s Supplement 1 12(17/2006 LR002895 139 Disclosure NECO17913 NECO17913 - NEC017925 VY Piping FAC Inspection Program NEC CD-s Supplement 1 1217/2006 LR002896 140 Disclosure NECO17926 NEC01796 - NECO17940 VY Piping FAC Inspection Program NEC CD-s Supplement 1 12(7/2006 LR002897 141 Disclosure NECO17941 NECO17941 - NEC017973 VY Piping FAC Inspection Program NEC CD-s Supplement 1 12(7/2006 LR002898 142 Disclosure-NEC017974 NEC017974 - NEC017976 NE 8053 - Ultrasonic Thickness Measurement LPC- NEC CD-s Supplement 1 12/7/2006 LR002899 143 I VYNEF 8053.01 Pg 1 of 1. Disclosure NEC017977 NECO17977 - NECO18004 Nondestructive Examination Prodedure NE 8053 NEC CD-s Supplement'l1 1217/2006 LR002900 144 Ultrasonic Thickness Measurement Disclosure-NECO1 8005 NECO18005 - NECO18143 Program Procedure 7028 Piping Flow- NEC CD-s Supplement 1 1217/2006 LR002901 Accelerated Corrosion Inspection Program LPC-11 Disclosure 145 NEC018144 NEC018144 - NEC018575 Controlled Document Transfer for Permanent NEC CD-s Supplement 1 12/7/2006 LR002902 146 Storage Disclosure NEC018576 NEC018576 - NEC018617 Engineering Report

Title:

VY Piping FAC Inspection NEC CD-5 Supplement 1 12(7/2006 LR002903 147 Program-FAC Susceptibility Review Disclosure NEC0186118 NEC018618 - NEC019230 Piping FAC Inspection Program NEC CD-S Supplement 1 12f7/2006 LR002904 148 Disclosure NEC019231 NEC019231 - NECO19291 VY Piping FAC Inspection Program NEC CD-s Supplement 1 12f7/2006 LR002905 149 Disclosure NEC019292 NEC019292 - NEC019417 VY Piping FAC Inspection Program NEC CD-s Supplement 1 12f7/2006 LR002906 150 Disclosure NEC019418 NECO19418 - NEC019431 VY Piping FAC Inspection Program NEC CD-s Supplement 1 12/7/2006 LR002907 151 Disclosure 6120/2007

f.

Exhibit I - Documents Produced, for Contention NEC-4 (all productions)

NECO19432 NEC019432 - NECO19512 VY Piping FAC Inspection Program NEC CD-S Supplement I 12/7/2006 LR002908 152 Disclosure NEC019513 NECO19513 - NEC019862 PP 7028 FAC Inspections 2001 Refueling Outage NEC CD-S Supplement 1 12t712006 LR002909 153 Disclosure NECO1 9863 NEC019863 - NEC020178 PP 7028 FAC Inspections 2002 Refueling Outage NEC CD-S Supplement I 1217/2006 LR00291 0 154 Disclosure NEC020179 NEC020179 - NEC020629 PP 7028 FAC Inspections 2004 Refueling Outage NEC CD-S Supplement 1 12/7/2006 LR00291 1 155 Disclosure NEC020630 NEC020630 - NEC020976 PP 7028 Piping FAC Inspection Program NEC CD-S Supplement 1 12t/72006 LR002912 156 Disclosure NECO21 109 NEC021109 - NEC021109 SOFTWARE CONTROLS AND LICENSE NEC CD-6 Supplement I 12/7/2006 LR003320 157 RENEWAL Disclosure NEC021 110 NECO21I110 - NECO21 111 RE: Vermont License Renewal FAC question NEC CD-6 Supplement 1 12/7/2006 LR003321 158 Disclosure NEC021 112 NEC02I1112 - NEC021 113 RE: Vermont License Renewal FAC question [12-02. NEC CD-6 Supplement 1 12/7/2006 LR003322 159 04] Disclosure NEC021 116 NEC021 116 - NEC021268 FW: VY Status Updates NEC CD-6 Supplement I 12/7/2006 LR003325 160 Disclosure NEC022215 NEC022215 - NEC022269 FW: VY AMRM-33 RPV NEC CD-6 Supplement I 12/7/2006 LR003400 161 Disclosure NEC023637 NEC023637 - NEC023637 Email re License Renewal FAC program NEC CD-6 Supplement I - 12/7/2006 LR008733 162 Disclosure NEC023638 NEC023638 - NEC023638 Email re Operating Experience Review for FAC and NEC CD-6 Supplement 1 12/7/2006 LR003734 163 Fatigue Monitoring Program Disclosure NEC023639 NEC023639 -NEC023639 Operating Experience Review for FAC and Fatigue NEC CD-6 Supplement 1 12/7/2006 LR003735 Monitoring Program - Interview Questions Disclosure 164 NEC023640 NEC023640 - NEC023640 Email forwarding Needs for TLAA and Fatigue NEC CD-6 Supplement"1 12/7/2006 LR003736 165 Reports Disclosure NEC023641 NEC023641 - NEC023642 Needs for TLAA and Fatigue Reports NEC CD-6 Supplement 1 12/7/2006 LR003737 166 Disclosure NEC023643 NEC023643 - NEC023643 Email re License Renewal Project NEC CD-6 Supplement 1 12t7/2006 LR003738 167 Disclosure-.

NEC023644 NEC023644 - NEC023644 Email re LRPD-04, "TLAA - Mechanical Fatigue, NEC CD-6 Supplement 1 12/7/2006 LR003739 168 Draft-A 10/6/04 Disclosure NEC023645 NEC023645 - NEC023684 LRPD-04, "TLAA - Mechanical Fatigue". Draft-A NEC CD-6 Supplement I 12/7/2006 LR003740 169 10/6/04 Report Disclosure NEC023685 NEC023685 - NEC023685 Email re LRPD-04, "TLAA - Mechanical Fatigue", NEC CD-6 Supplement 1 12/7/2006 LR003742 170 Draft-B 7/28/0S VY Comments lncorp. Disclosure NEC023686 NEC023686 - NEC023725 LRPD-04, "fTLAA - Mechanical Fatigue", Draft-B NEC CD-6 Supplement 1 12t7/2006 LR003743 171 7/28/05 'A' Report Disclosure NECO23726 NEC023726 - NEC023730 LRPD-04, "TLAA - Mechanical Fatigue", Draft-B NEC CD-6 Supplement 1 12/7/2006 LR003744 172 7/28/OS VY Comments Form Disclosure 6/20/2007

Exhibit I - Documents Produced for Contention NEC-4 (all productions)

NEC023731 NEC023731 - NEC023732 Email re LRPD-04 TLAA - Metal Fatigue NEC CD-6 Supplement I 12/7/2006 LR003745 173 Disclosure NEC023733 NEC023733 - NEC023772 LRPD-04 TLAA - Metal Fatigue Report, Draft B, NEC CD-6 Supplement 1 12/7/2006 LR003746 174 Rev. 0 Disclosure NEC023773 NEC023773 - NEC023782 Memo re Minor Reroute of RWCU Piping NEC CD-6 Supplement 1 12/7/2006 LR003747 175 Disclosure NEC023783 NEC023783 - NEC023799 LRPD-04 TL.AA - Metal Fatigue - Revision Status NEC CD-6 Supplement I 12(7/2006 LR003748 176 Sheet Disclosure NEC023800 NEC023800 - NEC023802 LRPD-04 TLAA - Metal Fatigue Report NEC CD-6 Supplement 1 12/7/2006 LR003749 177 Disclosure NEC024371 NEC024371 - NEC024373 VY FAC Program - NEC CD-.6 Supplement I 12/7/2006 LR003772 178 Disclosure NEC024374 NEC024374 - NEC024376 VY Review of FAC Program & Inspection Efforts NEC CD-6 Supplement 1 1217/2006 LR003773 179 Disclosure NEC024377 NEC024377 - NEC024381 FAC Management NEC CD-6 Supplement 1 1217/2006 LR003774 180 Disclosure NEC037099 NEC037099 - NEC037445 PP 7028 Piping FAC Inspection Program FAC NEC CD-li Supplement 1 1217/2006 LR004804 Inpection Program Records for 2005 Refueling Disclosure 181 OUtage NEC038398 NEC038398 - NEC038415 Chemistry Monthly Report Juley 2006 NEC CD-16 Supplement 6 5/3/2007 LR005938 182 Disclosure NEC038416 NEC038416 - NEC038418 Condition Report CR-VTY-2005-02239 NEC CD-16 Supplement 6 5/3/2007 LR005939 183 Disclosure NEC038419 NEC038419 - NEC038449 Cornerstone Rollup Program: Accelerated NEC CD-16 Supplement 6 5/3/2007 LR005940 184 Corrosion Disclosure-NEC038450 NEC038450 - NEC038461 Review of the Vermont Yankee Nuclear Plant Flow - NEC CD-16 Supplement 6 5/3/2007 LR005941 185 Accelerated Corrosion Program Disclosure NEC038462 NEC038462 - NEC038504 Focused Self-Assessment Report: Vermont Yankee NEC CD-16 Supplement 6 5/3/2007 LR005942 Piping Flow Accelerated Corrosion Inspection Disclosure 186 Program NEC038505 NEC038505 - NEC038512 Vermont Yankee Nuclear Power Station - NRC NEC CD-1 6 Supplement 6 5/3/2007 LR005943 187 Integrated Inspection Report - Disclosure NEC038513 NEC038513 - NEC038555 Quality Assurance Division Vermont Yankee NEC CD-16 Supplement 6 5/3/2007 LR005944 188 Nuclear Power Plant - Programs Audit Disclosure NEC038556 NEC038556 - NEC038561 Sa fety Evaluation Report with Confirmatory Items NEC CD-16 Supplement 6 5/3/2007 LR006001 Related to the License Renewal of Vermont Yankee Disclosure Nuclear Power Station Docket NO. 50-271 189 NEC044876 NEC044876 - NEC044880 Summary of Observations During VY Site Visit NEC CD-17 Supplement 7 6/7/2007 LR00661 9 190 Disclosure 6/7/2007 6/20/2007

Exhibit 2 - Documents Produced for Contention NEC-4 in 2007 Prodno Bates Range Document Title CD Production Date Docdd it nf Pin~

NEC038398 NEC038398 - NEC038415 Chemistry Monthly Report Juley 2006 NEC CD-16 Supplement 6 # of Panes 5/3/2007 LR005938 Disclosure 18 NEC038416 NEC038416 - NEC038418 Condition Report CR-VTY-2005-02239 NEC CD-16 Supplement 6 5/3/2007 LR005939 Disclosure 3 NEC038419 NEC038419 - NEC038449 Cornerstone Rollup Program: Accelerated NEC CD-16 Supplement 6 5/3/2007 LR005940 Corrosion Disclosure NEC038450 NEC038450 - NEC038461 Review of the Vermont Yankee Nuclear Plant Flow - NEC CD-16 Supplement 6 31 5/3/2007 LR005941 Accelerated Corrosion Program Disclosure NEC038462 NEC038462 - NEC038504 Focused Self-Assessment Report: Vermont Yankee NEC CD-16 Supplement 6 12 5/3/2007 LR005942 Piping Flow Accelerated Corrosion Inspection Disclosure Program NEC038505 NEC038505 - NEC038512 Vermont Yankee Nuclear Power Station - NRC 43 NEC CD-16 Supplement 6 5/3/2007 LR005943

.Integrated Inspection Report Disclosure NEC03851 3 NEC038513 - NEC038555 Quality Assurance Division Vermont Yankee 8 NEC CD-16 Supplement 6 5/3/2007 LR005944 Nuclear Power Plant - Programs Audit Disclosure NEC038556 NEC038556 - NEC038561 Safety Evaluation Report with Confirmatory Items NEC CD-16 Supplement 6 43 5/3/2007 LR006001 Related to the License Renewal of Vermont Yankee Disclosure Nuclear Power Station Docket NO. 50-271 NEC044876 NEC044876 - NEC044880 Summary of Observations During VY Site Visit 6 NEC CD-17 Supplement 17 6/7/2007 LR00661 9 Disclosure 6/7/2007 5

.6/20/2007