Proposed License Amendment Request Addition of LCO 3.0.8 - Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (CLIIP) Correction of Reference Dates
ML071620202
Person / Time
Site: North Anna  
(NPF-004, NPF-007)
Issue date: 06/11/2007
From: Gerald Bichof
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
07-0360A
Download: ML071620202 (3)


Text

June 11, 2007 U.S. Nuclear Regulatory Commission Serial No.

07-0360A Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555 Docket Nos. 50-3381339 License Nos. NPF-417 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED LICENSE AMENDMENT REQUEST ADDITION OF LC0 3.0.8 - INOPERABILITY OF SNUBBERS USING THE CONSOLIDATED LINE ITEM IMPROVEMENIT PROCESS (CLIIP)

CORRECTION OF REFERENCE DATES In a May 21, 2007 letter (Serial No.07-360), Dominion requested amendments, in the form of changes to the Technical Specifications (TS) to Facility Operating License Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively.

The proposed amendment would modify TS requirements for inoperable snubbers by adding LC0 3.0.8. The proposed change is consistent with NRC-approved Revision 4 to Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-372, "Addition of LC0 3.0.8, Inoperability of Snubbers." In the May 21, 2007 submittal, Dominion incorrectly referenced the applicable Federal Register volume, page number and date.

Instead the ADAMS Notice of Availability was inadvertently used and provided as the date of availability for the model application, safety evaluation, and environmental evalua.tion. The correct Federal Register date, volume and page number reference for the notice of availability including the model application, safety evaluation and environmer~tal evaluation are May 4, 2005 and 70 FR 23252.

Dominion continues to request approval of the license amendments by October 31, 2007 with a 90-day implementation period.

If you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.

Very truly yours, Gerald T. Bischof w

Vice President - Nuclear Engineering Commitments made in this letter: None

07-0360A Docket Nos. 50-3381339 Page 2 of 3 cc:

US. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative lnnsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 Virginia Department of Health James Madison Building - 7th floor 109 Governor Street Room 730 Richmond, Virginia 2321 9 Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. S. P. Lingam NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1 555 Rockville Pike Rockville, Maryland 20852 Mr. R. A. Jervey NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1 555 Rockville Pike Rockville, Maryland 20852

07-0360A Docket Nos. 50-3381339 Page 3 of 3 COMMONWEALTH OF VIRGINIA

)

COUNTY OF HENRICO

)

1 The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Gerald T. Bischof, who is Vice President - Nuclear Engineering, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

v Acknowledged before me this //

day of

/

I

,2007.

My Commission Expires:,

23 &?Oh'.