June 4, 2007 LICENSEE:

Exelon Generation Company, LLC FACILITY:

Dresden Cities Nuclear Power Station

SUBJECT:

SUMMARY

OF THE MAY 23, 2007, PUBLIC MEETING TO DISCUSS THE DRESDEN END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 23, 2007, a public meeting was held at the Grundy County Administration Building in Morris, Illinois, between the Nuclear Regulatory Commission (NRC) and the Dresden Nuclear Power Station management and staff. The purpose of the meeting was to discuss NRCs assessment of the performance of the Dresden Nuclear Power Station, Units 2 and 3, for the period of January 1, 2006, through December 31, 2006.

The NRC presentation provided an overall assessment of the Dresden Stations performance as described in NRCs Annual Assessment Letter - Dresden Nuclear Power Station, dated March 2, 2007, (reference ADAMS accession number ML070610231). The Dresden Station, Units 2 and 3, operated in a manner that preserved public health and safety and fully met all cornerstone objectives.

Mr. Danny Bost, Dresden Site Vice President, responded on behalf of the licensee and Dresden Nuclear Power Station. Mr. Bost provided overview information on activities at Dresden with particular emphasis on the station priorities of Safety, Security, Equipment Performance and Human Performance. Mr. Bost also discussed areas needing improvement, including the May 4, 2007, Unit 2 scram, areas of accomplishment, and the upcoming Fall 2007 Unit 2 refueling outage.

The meeting notice and NRC presentation can be found in ADAMS as ML070940590 and ML071440464 respectively. A list of meeting participants can be found in the attached Enclosure.

Before adjourning the meeting, the NRC provided the opportunity for members of the audience to ask questions.

Exelon Generation Company, LLC In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25

Enclosure:

As Stated DISTRIBUTION:

See next page

Exelon Generation Company, LLC In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25

Enclosure:

As Stated DISTRIBUTION:

See next page DOCUMENT NAME: C:\\FileNet\\ML071550465.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII E

NAME BCushman:dtp MRing DATE 05/31/07 06/04/07 OFFICIAL RECORD COPY

Letter to Exelon Generation Company, LLC from Mark A. Ring dated June 4, 2007

SUBJECT:

SUMMARY

OF THE MAY 23, 2007, PUBLIC MEETING TO DISCUSS THE DRESDEN END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT cc w/encl:

Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Will County Executive Will County Sheriff Director, Will County Emergency Management Agency Mayor of Joliet City Manager of Joliet Kendall County Board Chairman Kendall County Sheriff Grundy County Board Chairman Grundy County Sheriff Grundy County Emergency Management Agency Mayor of Morris Minooka Village President Mayor of Coal City Mayor of Carbon Hill Mayor of Diamond Mayor of Braidwood Mayor of Wilmington Channahon Village President Channahon Village Administrator Mayor of Shorewood Shorewood Village Administrator Mayor of Elwood INPO

Letter to Exelon Generation Company, LLC from Mark A. Ring dated June 4, 2007

SUBJECT:

SUMMARY

OF THE MAY 23, 2007, PUBLIC MEETING TO DISCUSS THE DRESDEN END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

TEB RAG1 JFW1 RidsNrrDirslpab JLC1 GEG KGO RML2 SAM9 SRI Dresden DRPIII DRSIII PLB1 TXN

Enclosure Meeting Participants M. Ring, NRC C. Phillips, NRC S. Ray, NRC A. Koonce, NRC K. Gladden, NRC M. Phillips, private citizen B. Hinchcliffe, private citizen C. Mathews, Illinois Emergency Management Agency (IEMA)

R. Zuffa, IEMA D. Bost, Exelon S. Tribuzzi, Exelon K. Lopykinski, Exelon D. Wosniak, Exelon R. Osgood, Exelon