May 25, 2007 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNIT 2 NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Nazar:
On September 4, 2007, the NRC will begin an inspection of the replacement reactor vessel head preservice records (NRC Procedure 71007, Reactor Vessel Head Replacement Inspection) at the Donald C. Cook Nuclear Power Plant, Unit 2. This on-site inspection is scheduled to conclude on September 7, 2007.
It is expected that this inspection will be resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the inspection. These documents are needed by the inspector upon arrival at the site on September 4, 2007.
We have discussed the detailed schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. R. Meister of your organization. If there are any questions about this inspection or the material requested, please contact the inspector Mel Holmberg at (630) 829-9748.
M. Nazar In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-316 License Nos. DPR-74
Enclosure:
HEAD FABRICATION INSPECTION DOCUMENT REQUEST cc w/encl:
J. Jensen, Site Vice President L. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigan
M. Nazar In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-316 License Nos. DPR-74
Enclosure:
HEAD FABRICATION INSPECTION DOCUMENT REQUEST cc w/encl:
J. Jensen, Site Vice President L. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigan DOCUMENT NAME:C:\\FileNet\\ML071450183.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DRS RIII DRS RIII RIII NAME MHolmberg: ls DHills DATE 05/24/07 05/25/07 OFFICIAL RECORD COPY
M. Nazar Letter to Mr. M. Nazar from Mr. D. E. Hills dated 05/25/2007.
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNIT 2 NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:
TEB MMT RidsNrrDirsIrib GEG KGO BJK1 CAA1 DRPIII DRSIII PLB1 TXN
1 Enclosure HEAD FABRICATION INSPECTION DOCUMENT REQUEST Inspection Dates:
September 4, 2007 through September 7, 2007 Inspection Procedures:
IP 71007 Reactor Vessel Head Replacement Inspection Inspector:
Mel Holmberg (630) 829-9748 A.
Information to be Provided at the Entrance Meeting The following information is requested to be provided to the inspector at the entrance meeting on September 4, 2007. If you have any questions regarding this information, please call the inspector as soon as possible.
1)
Copy available (at document review location) of the applicable Edition/Addenda for the ASME Code Sections III, V, XI, and Code Cases applicable to preservice examinations of the replacement head.
2)
Copy of the receipt inspection checklist used to confirm lack of shipping damage to the replacement head. Additionally, the inspector requests to observe any licensee staff examinations of the head which occur during the onsite inspection weeks.
3)
Copy of Contract, Design Specification and/or Purchase Order Sections identifying the required preservice examinations to be completed for the replacement head. Also, provide copy of the applicable vendor process control sheets which document completion of the head preservice examinations including those which serve as baseline examinations for NRC Order 03-009.
4)
Copy of the as-built drawings for the replacement head, including control rod drive mechanism housings with weld fabrication and nondestructive examination (NDE) details.
5)
Index with short description of the preservice examination records for the replacement head assembly including access to these records and a radiographic film reader.
6)
Copies of Section XI replacement head preservice examination records including preservice volumetric examination records for the penetration nozzle-to-head J-groove welds which may be used as baseline inspections for subsequent examinations required by NRC Order EA-03-009. Additionally, a copy of the hydrostatic test record for the replacement vessel head.
7)
Index with short description of the Audit/Surveillance reports (including the communication issue resolution sheets) related to the replacement head preservice examinations (e.g. NDE staff qualifications, procedures, in-process NDE observations, etc) and an index with short description of audit or surveillance report findings with a copy of the associated nonconformance reports or condition reports.