Ltr, 05/23/2007 Information Request for Byron, Units 1 and 2, Problem Identification and Resolution (Pi&R) Inspection
ML071440460
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/23/2007
From: Richard Skokowski
NRC/RGN-III/DRP/RPB3
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML071440460 (6)


Text

May 23, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING BYRON STATION, UNITS 1 AND 2, PROBLEM IDENTIFICATION AND RESOLUTION (PI&R)

INSPECTION

Dear Mr. Crane:

This letter is to request information to support our biennial PI&R inspection beginning July 16, 2007, at Byron Station, Units 1 and 2. This inspection will be performed in accordance with the Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The documents requested are copies of performance indicator reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by June 25, 2007. Mr. Bruce L. Bartlett, the Lead Inspector, will contact you to determine the best method of providing the requested information.

If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr. Bruce L. Bartlett at (815) 234-5451, or to contact him by email at blb1@nrc.gov.

C. Crane In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl:

Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station

C. Crane In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl:

Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station DOCUMENT NAME:C:\\FileNet\\ML071440460.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME RSkokowski:dtp DATE 05/23/07 OFFICIAL RECORD COPY

Letter to Christopher M. Crane from Richard A. Skokowski dated May 23, 2007

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING BYRON STATION, UNITS 1 AND 2, PROBLEM IDENTIFICATION AND RESOLUTION (PI&R)

INSPECTION DISTRIBUTION:

RAG1 TEB RFK RidsNrrDirsIrib GEG KGO RML2 SAM9 SRI Byron DRPIII DRSIII PLB1 TXN

Enclosure 1

Requested Information to Support Problem Identification and Resolution (PI&R)

Inspection 1.

A copy of administrative procedure(s) for the corrective action process, trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program, operator work around, and temporary modification.

2.

A copy of Quality Assurance (QA) audits and/or self-assessments of the corrective action program completed since July 1, 2005.

3.

A copy of the QA manual.

4.

A copy of the Employee Concerns Program/Ombudsman administrative procedure.

5.

A list of QA audits completed since July 1, 2005, with a brief description of areas where findings were identified.

6.

A list of self-assessments completed since July 1, 2005.

7.

A list of root cause evaluations completed since July 1, 2005.

8.

A list of test failures (In-service Test (IST) or Technical Specification surveillances) since July 1, 2005, with a brief description of component/system which failed.

9.

A list of all open condition reports sorted by significance level including a description of the issue, the date initiated, and the significance category.

10.

A list of condition reports closed since July 1, 2005, including a description of issue, significance category, date initiated, date closed, and whether there was an associated operability evaluation.

11.

A list of condition reports initiated since July 1, 2005, that involved inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, and significance category of the issue.

12.

A list of condition reports initiated since July 1, 2005 that identified trends of conditions adverse to quality. Include the date initiated, a brief description, status, and significance category for each item.

13.

A copy of any performance reports for the past two years used to track the corrective action program effectiveness.

14.

A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, and significant category for each item.

Enclosure 2

15.

A copy of condition reports associated with non-cited and cited violations since July 1, 2005.

16.

A list of operating experience documents received since July 1, 2005 and any associated condition reports.

17.

A list of effectiveness reviews completed since July 1, 2005.

18.

A list of rework items and repeat failures since July 1, 2005.

19.

A list of maintenance rule (a)(1) systems and components, and the associated health reports since July 1, 2005.

20.

A copy of any corrective action program trend reports for the past two years.

21.

A list of dates, times and locations for all scheduled meetings associated with the implementation of the corrective action program.

22.

A copy of the latest organization chart and phone listing.

23.

A list of the top ten risk-significant systems.

Documents requested to be available during the inspection:

a.

Updated Final Safety Analysis Report b.

Technical Specifications c.

Procedures d.

Copies of any self-assessments and associated condition reports generated in preparation for the inspection