Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-06-037
ML071430437
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/16/2007
From: Sands S
NRC/NRR/ADRO/DORL/LPLIII-2
To: Crane C
AmerGen Energy Co
Sands S,NRR/DORL, 415-3154
References
EA-06-037, TAC MD2210
Download: ML071430437 (5)


Text

Orr IL C

,JY-.

iLTIIlr.A~l

~

4 PA

  • UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 16, 2007 Mr. Christopher M. Crane, President and Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION, UNIT 1 - ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-06-037 REGARDING UPDATED DESIGN BASIS THREAT AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MD221 0)

Dear Mr. Crane:

By letter to the Nuclear Regulatory Commission (NRC) dated May 17, 2006, AmerGen Energy Company, LLC (AmerGen), submitted its revised plans and confirmed the full implementation at the Clinton Power Station, Unit 1 (CPS) of Order EA-06-037 regarding an updated adversary characteristic in the design-basis threat (DBT).

The NRC staff has completed its review of the changes related to implementation of Order EA-06-037. As discussed in the enclosed safeguards evaluation, the NRC staff has determined that AmerGen's changes to the security plans meet the requirements of the NRC Order and Title 10 of the Code of Federal Regulations (10 CFR) Part 73 requirements and are, therefore, acceptable. The effectiveness of these security provisions will continue to be the subject of NRC review and inspection.

Consistent with the Order, an administrative license change to Facility Operating Licensee No.

NPF-62 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the Order.

NOTICE: Enclosure 2 contains Security-Related Information. Upon separation from Enclosure 2, this letter and Enclosure I are DECONTROLLED.

O~ra.~IL W

~L-.' 8EBUR:T'. flELATEDB l14~3RTMi,10iv

-F-re -TIA.IL U~sr UIILI - VTUK1i I Y KLVim i~rUT1~t~M*JQATC!

vs C. Crane These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.

Please replace the enclosed page to your Facility Operating Ucense with the enclosed page (Enclosure 1). Enclosure 2 to this letter is designated exempt from public disclosure under 10 C.FR 2.390(d)(1).

If you have any questions, please contact me at (301) 415-3154.

Sincerely Stephen P. Sands, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosures:

1. Revised Page 8 to License
2. Safeguards Evaluation cc w/encls 1 and 2: Charles Williamson, Site Security Manager Mark Ring, RIII Joseph Klinger, State of Illinois cc w/encl 1 only: See next page

Clinton Power Station, Unit 1 cc w/encl 1 only:

Senior Vice President - Nuclear Services AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President of Operations - Mid-West Boiling Water Reactors AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Dresden, Quad Cities, and Clinton AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Clinton AmerGen Energy Company, LLC Clinton Power Station RR3, Box 228 Clinton, IL 61727-9351 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Document Control Desk-Licensing AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Clinton Power Station AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Clinton Power Station Plant Manager AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Resident Inspector U.S. Nuclear Regulatory Commission RR #3, Box 229A Clinton, IL 61727 Chief Operating Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Associate General Counsel AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Chairman of DeWitt County c/o County Clerk's Office DeWitt County Courthouse Clinton, IL 61727

Clinton Power Station, Unit 1 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, IL 60603 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109 Mr. Christopher M. Crane, President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. The exemptions in items (b) and (c) above are granted pursuant to 10 CFR 50.12. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

AmerGen Energy Company, LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR27817and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Clinton Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006.

F.

AmerGen Energy Company, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report as amended, for the Clinton Power Station, Unit No. 1, and as approved in the Safety Evaluation Report (NUREG-0853) dated February 1982 and Supplement Nos. I thru 8 thereto subject to the following provision:

AmerGen Energy Company, LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G.

Deleted.

1The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Amendment No: 172 Revised by letter dated May16, 2007