Administrative Change to Facility Operating License in Conjunction with Commission Order EA-06-037 and Revisions to Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
ML071370067
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/09/2007
From: Thomas Wengert
NRC/NRR/ADRO/DORL/LPLIII-2
To: Pearce L
FirstEnergy Nuclear Operating Co
References
EA-06-037, TAC MD2261
Download: ML071370067 (5)


Text

OFFI.IA. USE OL" -ECUR:,TY

  • .ELATED.,,F

,,MATION l*

IL RE(;U*

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2007 Mr. L.W. Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant, Unit 1 Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-06-037 AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MD2261)

Dear Mr. Pearce:

By letter to the Nuclear Regulatory Commission (NRC) dated May 18, 2006, FirstEnergy Nuclear Operating Company (FENOC), submitted its revised plans and confirmed the full implementation at the Perry Nuclear Power Plant, Unit 1 (PNPP) of Order EA-06-037 regarding an updated adversary characteristic of the design-basis threat.

The NRC staff has completed its review of the changes related to implementation of Order EA-06-037. As discussed in the enclosed safeguards evaluation (Enclosure 2), the NRC staff has determined that FENOC's changes to the security plans meet the requirements of the NRC Order and Title 10 of the Code of Federal Regulations (10 CFR) Part 73 requirements and are, therefore, acceptable. The effectiveness of these security provisions will continue to be the subject of NRC review and inspection.

Consistent with the Order, an administrative license change to Facility Operating Licensee No.

NPF-58 is being made to incorporate the reference to the revised Physical Security Plan, NOTICE: Enclosure 2 contains Security-Related Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.

OFFICIAL 1:166 ONLk' SECUfIT: REL:A TEB lINF9

~A-TlOI

OFFICIAL USE ONL6Y SECURIT, RELATED INFORM, L. W. Pearce 'ON

ýtrj Safeguards Contingency Plan, and Training and Qualification Plan required by the Order.

These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.

Please replace Page 6 of the PNPP Facility Operating License with the enclosed page (Enclosure 1). Enclosure 2 of this letter is designated exempt from public disclosure under 10 CFR 2.390(d)(1).

If you should have any questions, please contact me at (301) 415-4037.

Sincerely, Thomas J. Wengert, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosures:

1. Revised Page 6 of License
2. Safeguards Evaluation cc w/encls 1 and 2: Larry Lindrose, Site Security Manager Joseph Maynen, Region III cc w/encl 1 only: See next page OCGIAL USE ONLY ISECURIT REL6.ATED-
i.

INFORMATION

Perry Nuclear Power Plant, Unit 1 cc: w/o encl (2)

David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Resident Inspector's Office U.S. Nuclear Regulatory Commission P.O. Box 331 Perry, OH 44081-0331 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4531 Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, OH 44060 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A210 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Mayor, Village of North Perry North Perry Village Hall 4449 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Carol O'Claire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-7150 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Zack A. Clayton DERR Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081 Daniel Z. Fisher Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH 43215-3793 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308

Perry Nuclear Power Plant, Unit 1 cc: w/o encl (2)

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Onp-ratinrg Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 D.

FENOC is exempted from:, 1) the requirements of Section III.D.2(b)(ii), containment airlock testing requirements, Appendix J to 10 CFR Part 50, due to the special circumstance described in Section 6.2.6 of SER Supplement No. 7 authorized by 100FRCAUr-)UI I

L0f3\\1\\

and 2) the requirements of Section iV.F., Fuji Participation Exercise, of Appendix E to 10 CFR Part 50, due to the special circumstance described in the Exemption dated November 6, 1986. These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. The exemptions are hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

FENOC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (61 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Perry Nuclear Power Plant Physical Security Plan" Revision 2, submitted by letter dated May 18, 2006.

F.

Deleted.

G.

The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1964, as amended, to cover public liability claims.

Amendment No. 140 Revised by letter dated May 9, 2007