May 14, 2007 LICENSEE: Exelon Generation Company, LLC FACILITY: Clinton Power Station

SUBJECT:

SUMMARY

OF THE MAY 9, 2007, PUBLIC MEETING TO DISCUSS THE CLINTON END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 9, 2007, a public meeting was held at the Vespasian Warner Public Library in Clinton, Illinois, between the Nuclear Regulatory Commission (NRC) and the Clinton Power Station management and staff. The purpose of the meeting was to discuss NRCs assessment of the performance of the Clinton Power Station for the period of January 1, 2006, through December 31, 2006.

The NRC presentation provided an overall assessment of the Clinton Stations performance as described in NRCs Annual Assessment Letter - Clinton Power Station, dated March 2, 2007, (reference ADAMS Accession Number ML070610156). The Clinton Station operated in a manner that preserved public health and safety, and fully met all cornerstone objectives.

Messrs. Bryan Hanson and Russ Kearney, Clinton Site Vice President, and Clinton Plant Manager, responded on behalf of the licensee and Clinton Power Station. Mr. Kearney provided overview information on the stations accomplishments for 2006 with particular emphasis on capacity factor, safety system availability, the new Technical Support Center, and ground water monitoring. Mr. Hanson discussed the stations response to the White finding and focus areas going forward. A copy of the licensees slides was incorporated into the NRC presentation.

The meeting notice and NRC presentation can be found in ADAMS as ML070930532 and ML071310085, respectively. A list of meeting participants can be found in the attached Enclosure.

Before adjourning the meeting, the NRC provided the opportunity for members of the audience to ask questions.

Exelon Generation Company, LLC In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible form the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

As stated DISTRIBUTION:

See next page

Letter to Exelon Generation Company, LLC, from Mark A. Ring dated

SUBJECT:

SUMMARY

OF THE MAY 9, 2007, PUBLIC MEETING TO DISCUSS THE CLINTON END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT cc w/encl:

Christopher M. Crane, President and Chief Nuclear Officer Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Manager Licensing - Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois Chairman, Illinois Commerce Commission Clinton Police Department Mayor of Clinton Mayor of Weldon DeWitt County Board Chairman DeWitt County Sheriff EMA Coordinator, DeWitt County Mayor of Wapella McLean County Board Chairman McLean County Sheriff EMA Coordinator, McLean County Piatt County Board Chairman Piatt County Sheriff EMA Coordinator, Piatt County Macon County Board Chairman Macon County Sheriff EMA Coordinator, Macon County INPO

Letter to Exelon Generation Company, LLC, from Mark A. Ring dated May 14, 2007

SUBJECT:

SUMMARY

OF THE MAY 9, 2007, PUBLIC MEETING TO DISCUSS THE CLINTON END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

TEB RAG1 SPS1 RidsNrrDirslpab JLC1 GEG KGO RML2 SAM9 SRI Clinton DRSIII DRPIII PLB1 TXN

Exelon Generation Company, LLC In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible form the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

As stated DISTRIBUTION:

See next page DOCUMENT NAME:C:\FileNet\ML071360187.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME MRing:dtp DATE 05/14/07 OFFICIAL RECORD COPY

Meeting Participants M. Ring, NRC B. Dickson, NRC D. Tharp, NRC G. Stauffer, NRC C. Settles, Illinois Emergency Management Agency (IEMA)

S. Mischke, IEMA B. Hanson, Exelon R. Kearney. Exelon R. Frantz, Exelon B. Paulsen, Exelon K. Lopykinski, Exelon M. Mischke, public D. Kearney, public R. Wenning, Clinton High School S. Lindberg, public D. Hotwick, Macon Co. Sherriff