ML071350422
| ML071350422 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/03/2007 |
| From: | Mozafari B NRC/NRR/ADRO/DORL/LPLII-2 |
| To: | Stall J Florida Power & Light Co |
| References | |
| EA-06-037, TAC MD2288, TAC MD2289 | |
| Download: ML071350422 (5) | |
Text
3 FFIILSENU EURT4EAD IOR TIN UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 3, 2007 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
TURKEY POINT PLANT, UNITS 3 AND 4 - ADMINISTRATIVE CHANGE TO RENEWED FACILITY OPERATING LICENSES IN CONJUNCTION WITH THE COMMISSION ORDER EA-06-037 AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS. MD2288 AND MD2289)
Dear Mr. Stall:
By letter to the Nuclear Regulatory Commission (NRC or the Commission) dated May 18, 2006, the Florida Power and Light Company (FPL), the licensee for Turkey Point Nuclear Plant, Units 3 and 4 submitted its revised plans as required and confirmed the full implementation at the Turkey Point, Units 3 and 4, of Order EA-06-037 regarding an updated adversary characteristic in the design basis threat.
The NRC staff has completed its review of the changes related to implementation of Order EA-06-037. As discussed in the enclosed safeguards evaluation (Enclosure 3), the NRC staff has determined that FPL's changes to the security plans meet the requirements of the NRC Order and Title 10 of the Code of Federal Regulations (10 CFR) Part 73 and are, therefore, acceptable. The effectiveness of these security provisions will continue to be the subject of NRC review and inspection.
Consistent with the Order, conforming administrative changes to the Facility Operating Licenses are required to ensure implementation of the Order EA-06-037 requirements. Therefore, administrative license changes to renewed Facility Operating License (FOL) Nos. DPR-31 and DPR-41 are being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the Order.
These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.
- INo closure 3 contains Secura-ted
-information-n-separatio
-Enclosure-3,-
thnI~trnnlFn-PI n DECONTR D.
OFFRICIALUSE-OL'Y -SECURITY REL-ATEI3-INFGRMA-TON
OFflCIAL USE ONLY - ~URIT 1'-RELATED INFORMATION J. Stall Please replace Pages 4 of FOL Nos. DPR-31 and DPR-41 with the pages in Enclosures 1 and 2, respectively.
If you have any questions, please contact me at (301) 4 15-2020 or Cat imn@nrc.gov.
Sincerely, Brenda L. Mozafari, Senior Project a ager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosures:
- 3. Safety Evaluation cc w/encls 1, 2, and 3: Nick Eggemeyer, Site Security Manager M. Ernstes, Branch Chief, Region 2 cc w/encl 1 and 2 only: See next page
.OFF!= IALUSEONLTY
,REL.ATEIJNFRMAT*ON
OFFICIAL~~
US NY -U:/PEATDIFOTO J. Stall Florida Power and Light Company cc w/ enclosures 1 and 2 only:
Mr. William E. Webster Vice President, Nuclear Operations Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW.
Suite 220 Washington, DC 20004 Terry 0. Jones Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager Miami-Dade County 111 Northwest 1 Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission 9762 SW. 344' Street Florida City, Florida 33035 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 TURKEY POINT PLANT Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Michael 0. Pearce Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 James Connolly, Licensing Manager Florida Power and Light Company Turkey Point Nuclear Plant 9760 SW. 344th Street Florida City, FL 33035 Becky Ferrare Licensing Department Administrator Florida Power and Light Company Turkey Point Nuclear Plant 9760 SW. 344th Street Florida City, FL 33035 Mark Warner, Vice President Nuclear Operations Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
/&ZWt_/
4 D.
Fire Protection FPL shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report (USAR) for Turkey Point Units 3 and 4 and as approved in the Safety Evaluation Report (SER) dated March 21, 1979 and supplemented by NRC letters dated April 3, 1980, July 9, 1980, December 8, 1980, January 26, 1981, May 10, 1982, March 27, 1984, April 16, 1984, August 12,1987, and by Safety Evaluations dated February 25, 1994, February 24, 1998, October 8, 1998, December 22, 1998, May 4, 1999, and May 5, 1999, subject to the following provision:
The licensee may make changes to the approved Fire Protection Program without'prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Florida Power and Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan - Revision 3," submitted by letter dated May 18, 2006.
F.
- 1. The licensee shall restrict the combined number of fuel assemblies loaded in the existing spent fuel pool storage racks and cask pit rack to no more than the capacity of the spent fuel pool storage racks.
This condition applies at all times, except during activities associated with a reactor core offload/reload refueling condition. This restriction will ensure the capability to unload and remove the cask pit rack when cask loading operations are necessary.
- 2. The licensee shall establish two hold points within the rack installation procedure to ensure proper orientation of the cask rack in each unit's spent fuel pool. Verification of proper cask pit rack orientation will be implemented by an authorized Quality Control inspector during installation of the racks to ensure consistency with associated spent fuel pool criticality analysis assumptions.
Renewed License No. DPR-31 Amendment No. 226 Revised by letter dated May 3, 2007
4 D.
Fire Protection FPL shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report (UFSAR) for Turkey Point Units 3 and 4 and as approved in the Safety Evaluation Report (SER) dated March 21, 1979 and supplemented by NRC letters dated April 3, 1980, July 9, 1980, December 8, 1980, January 26, 1981, May 10, 1982, March 27, 1984, April 16, 1984, August 12, 1987, and by Safety Evaluations dated February 25, 1994, February 24, 1998, October 8, 1998, December 22, 1998, May 4, 1999, and May 5, 1999, subject to the following provision:
The licensee may make changes to the approved Fire Protection Program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Florida Power and Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan Revision 3," submitted by letter dated May 18, 2006.
F.
- 1. The licensee shall restrict the combined number of fuel assemblies loaded in the existing spent fuel pool storage racks and cask pit rack to no more than the capacity of the spent fuel pool storage racks.
This condition applies at all times, except during activities associated with a reactor core off load/reload refueling condition. This restriction will ensure the capability to unload and remove the cask pit rack when cask loading operations are necessary.
- 2. The licensee shall establish two hold points within the rack installation procedure to ensure proper orientation of the cask rack in each unit's spent fuel pool. Verification of proper cask pit rack orientation will be implemented by an authorized Quality Control inspector during installation of the racks to ensure consistency with associated spent fuel pool criticality analysis assumptions.
Renewed License No. DPR-41 Amendment No. 222 Revised by letter dated May 3, 2007