Notification of NRC Initial Operator Licensing Examination 05000498-07-301; 05000499-07-301
ML071350063
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/13/2007
From: Gody A
Operations Branch IV
To: Sheppard J
South Texas
References
IR-07-301
Download: ML071350063 (5)


See also: IR 05000498/2007301

Text

May 13, 2007

James J. Sheppard, President and

Chief Executive Officer

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 and

2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION

05000498/2007301; 05000499/2007301

Dear Mr. Sheppard:

In a meeting on March 8, 2007, between Messrs. Michael DeFrees, Operations Training

Supervisor, and Brian Larson, Chief Examiner, arrangements were made for the administration

of licensing examinations at South Texas Project Electric Generating Station, Units 1 and 2,

during the week of November 5, 2007.

As agreed during the meeting, your staff will prepare the examinations based on the guidelines

in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power

Reactors," and the use of Revision 2 of NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators. The NRCs regional office will discuss with your staff any

changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by August 19, 2007. The written examinations, operating tests, and reference material

identified in Attachment 2 to ES-201 will be due by September 18, 2007. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the

facility licensee shall approve the required examinations and tests before they are submitted to

the NRC for review and approval. All materials shall be complete and ready-to-use. We

request that any personal, proprietary, sensitive unclassified, or safeguards information in your

submittal be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examinations, tests or supporting reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled. In

addition, your support for onsite validation of the examinations is required during the week of

October 15, 2007.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

STP Nuclear Operating Company -2-

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications and waiver requests (if any) (Office of

Management and Budget (OMB) approval number 3150-0090) and medical certifications (OMB

approval number 3150-0024) at least 30 days before the first examination date. If the

preliminary applications are not received at least 30 days before the examination date, a

postponement may be necessary. Signed applications certifying that all training has been

completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2009.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />

per response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk

Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of

Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. DeFrees has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Larson at 817-860-8172, or myself

at 817-860-8159 .

Sincerely,

/RA/

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

STP Nuclear Operating Company -3-

Dockets: 50-498; 50-499

Licenses: NPF-76; NPF-80

cc:

E. D. Halpin

Site Vice President

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

Ken Coates

Plant General Manager

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

S. M. Head, Manager, Licensing

STP Nuclear Operating Company

P.O. Box 289, Mail Code: N5014

Wadsworth, TX 77483

C. T. Bowman

General Manager, Oversight

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

Marilyn Kistler

Sr. Staff Specialist, Licensing

STP Nuclear Operating Company

P.O. Box 289, Mail Code 5014

Wadsworth, TX 77483

C. M. Canady

City of Austin

Electric Utility Department

721 Barton Springs Road

Austin, TX 78704

J. J. Nesrsta/R. K. Temple/

E. Alercon/Kevin Pollo

City Public Service Board

P.O. Box 1771

San Antonio, TX 78296

Jon C. Wood

Cox Smith Matthews

112 E. Pecan, Suite 1800

San Antonio, TX 78205

STP Nuclear Operating Company -4-

A. H. Gutterman, Esq.

Morgan, Lewis & Bockius

1111 Pennsylvania Avenue NW

Washington, DC 20004

Institute of Nuclear Power Operations (INPO)

Records Center

700 Galleria Parkway SE, Suite 100

Atlanta, GA 30339

Director, Division of Compliance & Inspection

Bureau of Radiation Control

Texas Department of State Health Services

1100 West 49th Street

Austin, TX 78756

Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

1701 North Congress Avenue

Austin, TX 78701-3326

Environmental and Natural

Resources Policy Director

P.O. Box 12428

Austin, TX 78711-3189

Judge, Matagorda County

Matagorda County Courthouse

1700 Seventh Street

Bay City, TX 77414

Terry Parks, Chief Inspector

Texas Department of Licensing

and Regulation

Boiler Program

P.O. Box 12157

Austin, TX 78711

Susan M. Jablonski

Office of Permitting, Remediation and Registration

Texas Commission on Environmental Quality

MC-122, P.O. Box 13087

Austin, TX 78711-3087

STP Nuclear Operating Company -5-

Ted Enos

4200 South Hulen

Suite 422

Fort Worth, TX 76109

Steve Winn/Christine Jacobs/

Eddy Daniels/Marty Ryan

NRC Energy, Inc.

211 Carnegie Center

Princeton, NJ 08540

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (JLD5)

Branch Chief, DRP/A (CEJ1)

Senior Project Engineer, DRP/A (TRF)

Team Leader, DRP/TSS (FLB2)

RITS Coordinator (MSH3)

SUNSI Review Completed: ___Y____ ADAMS: : Yes G No Initials: _BTL__

Publicly Available G Non-Publicly Available G Sensitive  : Non-Sensitive

ML071350063

OE:OB C:OB

BLarson ATGody

/RA/ /RA/

5/13/07 5/13/07

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax