MONTHYEARNLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2021029, Annual Radiological Environmental Report2021-05-13013 May 2021 Annual Radiological Environmental Report NLS2021002, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20202021-01-20020 January 2021 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2020 NLS2020001, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20192020-01-20020 January 2020 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2019 NLS2018053, Transmittal of 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2018-10-0808 October 2018 Transmittal of 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2017005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20162017-01-13013 January 2017 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2016 NLS2016027, Annual Radiological Environmental Report January 1, 2015 Through December 31, 20152016-05-16016 May 2016 Annual Radiological Environmental Report January 1, 2015 Through December 31, 2015 ML16144A6042016-05-16016 May 2016 Non-ODAM Requires Sampling, Supplementary Stations for January 1, 2015 Through December 31, 2015 NLS2016007, Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20152016-01-21021 January 2016 Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2015 NLS2014009, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20132014-01-17017 January 2014 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2013 NLS2013006, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20122013-01-14014 January 2013 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2012 NLS2012046, Transmittal of Annual Radiological Environmental Report for the Year 20112012-05-15015 May 2012 Transmittal of Annual Radiological Environmental Report for the Year 2011 NLS2011045, Annual Radiological Environmental Report2011-05-16016 May 2011 Annual Radiological Environmental Report NLS2011044, Annual Radioactive Effluent Release Report, ODAM Submittal and Summary of Changes to the Process Control Program2011-04-29029 April 2011 Annual Radioactive Effluent Release Report, ODAM Submittal and Summary of Changes to the Process Control Program NLS2010088, 10 CFR 50.59(d)(2) Summary Report of Evaluations Performed from 08/01/2008 to 07/31/20102010-10-0707 October 2010 10 CFR 50.59(d)(2) Summary Report of Evaluations Performed from 08/01/2008 to 07/31/2010 NLS2010048, Annual Radiological Environmental Report for 20092010-05-14014 May 2010 Annual Radiological Environmental Report for 2009 NLS2010042, Enclosure 1, Annual Radioactive Effluent Release Report January 1, 2009 Through December 31, 20092010-04-30030 April 2010 Enclosure 1, Annual Radioactive Effluent Release Report January 1, 2009 Through December 31, 2009 NLS2010009, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20092010-01-14014 January 2010 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2009 NLS2009001, Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20082009-01-0909 January 2009 Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2008 NLS2009031, Radiological Environmental Monitoring Program, 2008 Annual Report, January 1, 2008 Through December 31, 20082008-12-31031 December 2008 Radiological Environmental Monitoring Program, 2008 Annual Report, January 1, 2008 Through December 31, 2008 NLS2008094, 10 CFR 50.59(d)(2) Summary Report of Evaluations Performed from 08/01/2006 to 07/31/20082008-10-14014 October 2008 10 CFR 50.59(d)(2) Summary Report of Evaluations Performed from 08/01/2006 to 07/31/2008 NLS2007050, 2006 Annual Financial Report2007-06-13013 June 2007 2006 Annual Financial Report NLS2007027, Enclosure 1, Cooper - Annual Radioactive Effluent Release Report January 1, 2006 Through December 31, 20062007-05-0101 May 2007 Enclosure 1, Cooper - Annual Radioactive Effluent Release Report January 1, 2006 Through December 31, 2006 ML0712403342007-05-0101 May 2007 Cooper - Annual Radioactive Effluent Release Report, ODAM Submittal, and Summary of Changes to the Process Control Program NLS2006053, Nebraska Public Power District 2005 Annual Financial Report for Cooper Nuclear Station2006-06-16016 June 2006 Nebraska Public Power District 2005 Annual Financial Report for Cooper Nuclear Station NLS2003065, Nebraska Public Power District 2002 Annual Financial Report2003-05-28028 May 2003 Nebraska Public Power District 2002 Annual Financial Report 2024-01-10
[Table view] Category:Letter
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] |
Text
H Nebraska Public Power District Always there when you need us NLS2007027 May 1,2007 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555-0001
Subject:
Annual Radioactive Effluent Release Report, ODAM Submittal, and Summary of Changes to the Process Control Program Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
The purpose of this letter is to transmit to the Nuclear Regulatory Commission (NRC) the Cooper Nuclear Station (CNS) Annual Radioactive Effluent Release Report for the period January 1, 2006, through December 31, 2006. This report is included as Enclosure
- 1. This letter also transmits a copy of the current Offsite Dose Assessment Manual (ODAM) as Enclosure 2 and a summary of changes to the Process Control Program (PCP) as an Attachment.
These documents are being submitted for NRC use per the requirements of Technical Specification 5.6.3 and CNS ODAM Section D 5.3.Should you have any questions or require additional information, please contact Paul Fleming, Licensing Manager, at (402) 825-2774.Sincerely,/j f Attachment Enclosures COOPER NUCLEAR STATION P 0. Box 98 / Brownville, NE 68321-0098 Telephone:
(402) 825-3811 / Fax: (402) 825-5211 www.nppd.com tool NLS2007027 Page 2 of 2 cc: Regional Administrator w/ attachment and enclosures USNRC -Region IV Senior Resident Inspector w/ attachment and enclosures CNS -USNRC Cooper Project Manager w/ attachment and enclosures USNRC -NRR Project Directorate IV-1 CNS Records w/ attachment and enclosures NPG Distribution w/o attachment and enclosures NLS2007027 Attachment Summary of Change to CNS Process Control Program Description of Change to Section F -Dewatering The original Section F, subsection c, paragraph 3, last sentence read as follows: "When the first level dewatering pump suction line vacuum fluctuates rhythmically with the dewatering pump and/or drops to approximately 5 inches Hg the first level dewatering suction valve is closed and the dewatering pump secured." The change that was made eliminated the reference to closing the first level dewatering suction valve from the sentence.
The sentence now reads: "When the first level dewatering pump suction line vacuum fluctuates rhythmically with the dewatering pump and/or drops to approximately 5 inches Hg the dewatering pump is secured.Justification for the Change The current operating procedure did not contain a step to close the first level dewatering suction valve as described in the Process Control Program (PCP) section above. Closing this valve is not required since the valve must be open in order to continue with the next section of the dewatering cycle. In addition, the valve is located in a high radiation area and unnecessary operations of this valve cause additional personnel radiation exposure and ALARA concerns.Determination that the Change Did Not Reduce Conformance to Existing Criteria Operation of the first level dewatering suction valve prior to stopping the dewatering pump has no impact on the process of dewatering solid radioactive waste. The next process after dewatering is drying which requires the dewatering pump to be restarted and the first level dewatering valve to be opened. There is no backflow into the solid waste container and the overall process of preparing solid radioactive waste to be shipped for burial is not affected.
Therefore, this change to the PCP does not reduce the overall confornance of the solidified waste product to existing criteria for solid wastes.Documentation of Acceptability of Change by SORC SORC approval of the PCP change was documented by the General Manager of Plant Operations on 1/10/2006.
ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS©g)
ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSO Correspondence Number: NLS2007027 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document.
Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None/,IPROCEDURE 0.42 REVISION 20 PAGE 18 OF 25