April 19, 2007 LICENSEE:

Entergy Nuclear Operations Inc FACILITY:

Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 11, 2007, PUBLIC MEETING TO DISCUSS THE PALISADES END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 11 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College in South Haven, Michigan. The meeting was between NRC Region III management and Entergy Nuclear Operations Inc. (Entergy) management to discuss the NRCs assessment of Palisades safety performance for the period from January 1 through December 31, 2006. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML070870522 and ML070940496, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in calendar year 2006, which was documented in the March 2, 2007, end-of-cycle assessment letter. As part of this regulatory performance meeting, Entergy briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and Entergy representatives.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-255; License No. DPR-20

LICENSEE:

Entergy Nuclear Operations Inc FACILITY:

Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 11, 2007, PUBLIC MEETING TO DISCUSS THE PALISADES END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 11 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College in South Haven, Michigan. The meeting was between NRC Region III management and Entergy Nuclear Operations Inc. (Entergy) management to discuss the NRCs assessment of Palisades safety performance for the period from January 1 through December 31, 2006. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML070870522 and ML070940496, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in calendar year 2006, which was documented in the March 2, 2007, end-of-cycle assessment letter. As part of this regulatory performance meeting, Entergy briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and Entergy representatives.

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-255; License No. DPR-20 DOCUMENT NAME: C:\\FileNet\\ML071150372.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME CLipa:dtp DATE 04/19/07 OFFICIAL RECORD COPY Entergy Nuclear Operations Inc cc w/encl:

P. Harden, Site Vice President M. Sellman, President and Chief Executive Officer R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations D. Cooper, Senior Vice President and Chief Nuclear Officer L. Lahti, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel and Secretary A. Udrys, Esquire, Consumers Energy Company S. Wawro, Director of Nuclear Assets, Consumers Energy Company Supervisor, Covert Township Office of the Governor State Liaison Office, State of Michigan L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Mayor of Bangor City Manager of Bangor Mayor of Hartford City Manager of Hartford Mayor of South Haven City Manager of South Haven Administrator, Allegan County Allegan County Sheriff Allegan County Emergency Management Coordinator County Coordinator Berrien County Sheriff Director, Berrien County Emergency Management Agency Chairman, Van Buren County Board Van Buren County Sheriff Director, Van Buren County Emergency Management Agency Mayor of Watervliet Mayor of Coloma INPO

Entergy Nuclear Operations Inc DISTRIBUTION:

HKN MLC TEB RidsNrrDirslpab JLC1 GEG KGO GLS RML2 SAM9 SRI Palisades DRPIII DRSIII PLB1 TXN PUBLIC MEETING PRINCIPAL ATTENDEES April 11, 2007 NRC C. Lipa, Chief, Branch 4, Division of Reactor Projects J. Ellegood, Senior Resident Inspector, Palisades J. Giessner, Resident Inspector, Palisades A. Garmoe, Reactor Engineer, Region III J. Cameron, Branch Chief, DNMS R. Jones, Palisades Office Assistant Entergy Nuclear Operations, Inc C. Schwarz, Site Vice President G. Hettel, Plant Manager J. Broschak, Site Engineering Director L. Lahti, Licensing Manager D. Malone, Regulatory Affairs M. Savage, Communications Manager Members of the Public C. Adesanya, All On Earth, Inc.

Mrs. Hettel, Grover Hettel's Wife