April 27, 2007 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - RESPONSE TO GENERIC LETTER 2006-02, GRID RELIABILITY AND THE IMPACT ON PLANT RISK AND THE OPERABILITY OF OFFSITE POWER (TAC NOS. MD1035 AND MD1036)
Dear Mr. Sheppard:
On February 1, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued GL 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (Agencywide Document Access and Management System (ADAMS) Accession No. ML060180352), to all holders of operating licenses for nuclear power reactors except those who have permanently ceased operation and have certified that fuel has been removed from the reactor vessel.
In GL 2006-02 (GL), the NRC staff notified the licensees of the NRC staffs need for information in four areas as follows:
(1)
Use of protocols between the nuclear power plant (NPP) and the transmission system operator (TSO), independent system operator (ISO), or reliability coordinator/authority (RC/RA); and the use of transmission load flow analysis tools (analysis tools) by TSOs to assist NPPs in monitoring grid conditions to determine the operability of offsite power systems under plant technical specifications. (The TSO, ISO, or RA/RC is responsible for preserving the reliability of the local transmission system. In this GL, the term TSO is used to denote these entities);
(2)
Use of NPP/TSO protocols and analysis tools by the TSOs to assist NPPs in monitoring grid conditions for consideration in maintenance risk assessments; (3)
Offsite power restoration procedures in accordance with Section 2 of NRC Regulatory Guide (RG) 1.155, Station Blackout; and (4)
Losses of offsite power caused by grid failures at a frequency equal to or greater than once in 20 site-years, in accordance with RG 1.155.
Subsequent to the GL, the NRC issued a request for additional information (RAI) (ADAMS Accession No. ML063380308) regarding the resolution of GL 2006-02 to 63 of 65 holders of
J. J. Sheppard operating licenses for nuclear power reactors. The RAI requested that licensees respond to questions in the following areas:
(1) Switchyard Minimum Voltage; (2) Loss of Real-Time Contingency Analysis (RTCA) Capability; (3) Verification of RTCA Predicted Post-Trip Voltage; (4) Identification of Applicable Single Contingencies; (5) Seasonal Variation in Grid Stress (reliability and Loss-of-offsite power (LOOP) Probability; (6) Interface With Transmission System Operator During Extended Plant Maintenance.
By letters dated March 30, 2006 (ADAMS Accession No. ML060940432), and January 30, 2007 (ADAMS Accession No. ML070360037), you responded to the information request of GL 2006-02 and the subsequent RAI, respectively. Based on the information you provided, the NRC staff has concluded that compliance with the NRC regulatory requirements governing electric power sources and associated personnel training is being maintained. Accordingly, the NRC staff considers your response to GL 2006-02 complete.
If you have any questions, please contact me at 301-415-1476.
Sincerely,
/RA/
Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page
ML060940432), and January 30, 2007 (ADAMS Accession No. ML070360037), you responded to the information request of GL 2006-02 and the subsequent RAI, respectively. Based on the information you provided, the NRC staff has concluded that compliance with the NRC regulatory requirements governing electric power sources and associated personnel training is being maintained. Accordingly, the NRC staff considers your response to GL 2006-02 complete.
Sincerely,
/RA/
Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page DISTRIBUTION:
PUBLIC LPLIV Reading RidsAcrsAcnwMailCenter RidsNrrDorlLpl4 JEargle, NRR RidsNrrPMMThadani RidsNrrLALFeizollahi RidsOgcRp RidsRgn4MailCenter ACCESSION NO: ML071130092 OFFICE NRR/LPL4/PM NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME MThadani JEargle/MMarkley LFeizollahi THiltz/MMarkley DATE 4/26/07 4/27/07 4/25/07 4/27/07
March 2007 South Texas Project, Units 1 & 2 cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 289 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 J. J. Nesrsta/R. K. Temple E. Alercon/Kevin Pollo City Public Service Board P.O. Box 1771 San Antonio, TX 78296 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Steve Winn/Christie Jacobs Eddy Daniels/Marty Ryan NRC Energy, Inc.
211 Carnegie Center Princeton, NJ 08540 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 E. D. Halpin Site Vice President STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 S. M. Head, Manager, Licensing STP Nuclear Operating Company P.O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 C. T. Bowman General Manager, Oversight STP Nuclear Operating Company P.O Box 389 Wadsworth, TX 77483 Marilyn Kistler Sr. Staff Specialist, Licensing STP Nuclear Operating Company P.O. Box 289, Mail Code 5014 Wadsworth, TX 77483 Environmental and Natural Resources Policy Director P.O. Box 12428 Austin, TX 78711-3189 Jon C. Wood Cox, Smith, & Matthews 112 East Pecan, Suite 1800 San Antonio, TX 78205 Director Division of Compliance & Inspection Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756 South Texas Project, Units 1 & 2 March 2007 cc:
Mr. Ted Enos 4200 South Hulen Suite 422 Ft. Worth, TX 76109 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Ken Coates Plant General Manager STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P.O. Box 12157 Austin, TX 78711