Text
April 30, 2007 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT 1 - NRC RECEIPT OF OMAHA PUBLIC POWER DISTRICT RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1582)
Dear Mr. Ridenoure:
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your responses dated June 2 and August 2, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML061530476 and ML070850193, respectively), to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.
Based on your responses, the basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please contact me at 301-415-1445.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 cc: See next page
April 30, 2007 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT 1 - NRC RECEIPT OF OMAHA PUBLIC POWER DISTRICT RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1582)
Dear Mr. Ridenoure:
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your responses dated June 2 and August 2, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML061530476 and ML070850193, respectively), to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.
Based on your responses, the basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please contact me at 301-415-1445.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 DISTRIBUTION:
PUBLIC RidsRgn4MailCenter cc: See next page LPLIV Reading DFrumkin, NRR RidsNrrDorl RidsOgcRp RidsNrrDorlLpl4 RidsNrrDraAfpb (SWeerakkody)
RidsNrrPMAWang RidsAcrsAcnwMailCenter RidsNrrLALFeizollahi ACCESSION NO.: ML071060295 OFFICE NRR/LPL4/PM NRR/LPL4/LA DRA/AFPB/BC NRR/LPL4/BC NAME AWang LFeizollahi SWeerakkody THiltz DATE 4/18/07 4/17/07 4/25/07 4/30/07 OFFICIAL RECORD COPY
Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn ATTN: James R. Curtiss, Esq.
1700 K Street, N.W.
Washington, DC 20006-3817 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Joe L. McManis Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319