Category:Annual Operating Report
MONTHYEARML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML22179A3102022-06-22022 June 2022 Connecticut, Inc - 2021 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirement of 10 CFR 50.46 ML22108A0362022-03-21021 March 2022 Summary of Facility Changes, Tests and Experiments ML20181A5392020-06-29029 June 2020 Submittal of 2019 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML19179A1472019-06-21021 June 2019 2018 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML18184A3462018-06-28028 June 2018 2017 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML17184A1462017-06-27027 June 2017 Transmittal of 2016 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML16179A2052016-06-21021 June 2016 2015 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML15105A2412015-04-10010 April 2015 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report ML14188C0562014-06-27027 June 2014 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML14118A0422014-04-22022 April 2014 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 2013 Annual Radioactive Effluent Release Report ML14118A0372014-04-22022 April 2014 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 2013 Annual Radiological Environmental Operating Report ML14118A0392014-04-21021 April 2014 Annual Environmental Operating Report for 2013 ML13183A0682013-06-26026 June 2013 2012 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13141A4142013-04-22022 April 2013 Independent Spent Fuel Storage Installation - 2012 Annual Radioactive Effluent Release Report ML13114A0562013-04-16016 April 2013 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 2012 Annual Radiological Environmental Operating Report ML1219103392012-06-28028 June 2012 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML12135A0422012-04-26026 April 2012 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML12125A1252012-04-23023 April 2012 Independent Spent Fuel Storage Installation (ISFSI) - 2011 Annual Radiological Environmental Operating Report ML1118004992011-06-27027 June 2011 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46, Kewaunee, Millstone, North Anna, Surry ML11130A0212011-04-29029 April 2011 Submittal of Annual Environmental Operating Report ML11123A2152011-04-26026 April 2011 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report for 2010 ML11123A2142011-04-26026 April 2011 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML1018104352010-06-29029 June 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML1009700602010-03-30030 March 2010 Summary of Facility Changes, Tests and Experiments for 2009 ML0918202722009-06-30030 June 2009 Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0912703092009-04-27027 April 2009 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report, January 1, 2008 to December 31, 2008 ML0909203162009-03-27027 March 2009 Submittal of Summary Description of Facility Changes, Tests and Experiments Identified in Regulatory Evaluations Implemented 2008 ML0817904372008-06-26026 June 2008 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0812806332008-04-28028 April 2008 Annual Radioactive Effluent Release Report, (01/01/07 - 12/31/07) ML0809205222008-03-24024 March 2008 Summary of Facility Changes, Tests and Experiments During 2007 Pursuant to 10 CFR 50.59(d)(2) ML0710301592007-04-0202 April 2007 Annual Environment Operating Report for 2006 ML0708606842007-03-19019 March 2007 Summary of Facility Changes, Tests and Experiments ML0605906112006-02-28028 February 2006 Annual Steam Generator Tube Inspection Report -2005 ML0518603972005-06-30030 June 2005 Annual Report of Emergency Core Cooling System Model Changes ML0510900222005-04-0707 April 2005 Annual Environmental Operating Report ML0509605022005-03-29029 March 2005 Summary of Facility Changes, Tests, and Experiments for 2004 ML0210706712002-04-0808 April 2002 Annual Environmental Operating Report ML0112403702001-04-27027 April 2001 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report 2023-06-26
[Table view] Category:Environmental Report
MONTHYEARML23191A5362023-07-10010 July 2023 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML22272A0412022-09-28028 September 2022 (NAPS) Units 1 & 2 - Subsequent License Renewal Application, Appendix E Environmental Report Supplement 1 ML20246G6982020-08-24024 August 2020 Appendix E: Applicant'S Environmental Report Subsequent Operating License Renewal Stage North Anna Power Station Units 1 and 2 ML16125A4952016-04-26026 April 2016 Virginia Electric and Power Company (Dominion) North Anna Power Station Units 1 and 2 Independent Spent Fuel Storage Installation -Annual Radioactive Effluent Release Report ML14118A0392014-04-21021 April 2014 Annual Environmental Operating Report for 2013 ML11262A1512011-09-17017 September 2011 Independent Spent Fuel Storage Installation - Summary Report of August 23, 2011 Earthquake Response and Restart Readiness Determination Plan ML0710301592007-04-0202 April 2007 Annual Environment Operating Report for 2006 ML0611601262006-04-17017 April 2006 Annual Environmental Operating Report ML0511802662005-04-20020 April 2005 Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report for 2004 ML0510900222005-04-0707 April 2005 Annual Environmental Operating Report ML0327904702003-09-30030 September 2003 North Anna Early Site Permit Application, Revision 0, Environmental Report, Table of Contents Through Section 2.8 ML0327316162003-09-30030 September 2003 North Anna Early Site Permit Application, Revision 0, Environmental Report, Chapter 3 Through Programs and Plans, Section 1.2.3 ML0311205712003-04-16016 April 2003 Annual Environmental Operating Report ML0213407262002-04-25025 April 2002 ISFSI - Annual Radiological Environmental Operating Report for January Through December 2001 ML0210706712002-04-0808 April 2002 Annual Environmental Operating Report 2023-07-10
[Table view] Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 2, 2007 United States Nuclear Regulatory Commission Serial No. 07-0237 Attention: Document Control Desk NAPS/JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENT OPERATING REPORT Enclosed is the Annual Environmental Operating Report for North Anna Power Station Units 1 and 2 for 2006, pursuant to Section 5.4.1 of the Technical Specifications, Appendix B - Environmental Protection Plan.
If you have any questions or require additional information, please contact Page Kemp at (540) 894-2295.
Very truly yours, D. G. Stoddard Site Vice President Enclosure cc: U. S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station ZIII7E 5
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 APPENDIX B ENVIRONMENTAL PROTECTION PLAN 2006 ANNUAL REPORT DOCKET NOS. 50-338 AND 50-339 Page 1 of 3
INTRODUCTION This 2006 Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company, as required under Section 5.4.1 of Appendix B, Environmental Protection Plan (EPP).
The objective of the EPP is to verify that the North Anna Power Station is operated in an environmentally acceptable manner, consistent with NRC and other federal, state and local requirements as well as to keep the NRC informed of any environmental effects of facility construction or operation.
During 2006, no significant adverse environmental impact occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the licensee's VPDES permit (number VA 0052451) issued by the Virginia State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota.
Listed below are the summaries and analyses required by Subsection 4.2 of the EPP.
PLANT DESIGN AND OPERATION (SECTION 3.1)
A review of all changes in station design or operation, tests and experiments was performed and no potentially significant, unreviewed, environmental issues were identified.
EROSION CONTROL INSPECTION - SITE (SECTION 4.2.2.1)
Performance of Periodic Test Procedure, I-PT-9.3, Erosion Control Inspection-Station Site, by the Civil/Design Engineering Department identified four (4) areas of concern that needed corrective action. One area involved minor soil erosion which was subsequently corrected with the addition of large stone to redirect runoff. Two areas involved animal burrows, which. were filled-in. The final item involved removing vegetation from a barrier fence. All corrective actions have been completed and none of the areas of concern impacted station safety or operability.
Page 2 of 3
EROSION AND SEDIMENT CONTROL PROGRAM - CORRIDOR RIGHTS-OF-WAY SECTION 4.2.2.2)
During 2006, all transmission line rights-of-way were patrolled to coordinate brush and tree work needed for maintenance of the lines. This work involved the following:
" North Anna-to-Gordonsville corridor: The patrol revealed that there was no significant tree or brush work needed, and no significant erosion was observed.
- North Anna-to-Morrisville corridor: A contract crew performed all brush and tree work for reliability as needed. A follow-up inspection was done as the work progressed.
" North Anna-to-Ladysmith corridor: A contract crew performed all brush and tree work for reliability as needed. A follow-up inspection was done as the work progressed.
- North Anna-to-Midlothian corridor: A contract crew performed all brush and tree work for reliability as needed. All herbicide work was completed by the end of August. A follow-up inspection was done as the work progressed.
During all of the above-noted patrols and follow-up observations, no abnormal ero'sion conditions were observed on any of the above corridors associated with transmission line construction, modification, maintenance activities or the use of herbicides during 2006.
NON-COMPLIANCE (SECTION 5.4.1)
There were no non-compliances with the Environmental Protection Plan during 2006.
NON-ROUTINE REPORTS (SECTION 5.4.2)
No Non-Routine (30-day) written reports were required to be submitted relative to non-compliance with the Stations VPDES permit, or any other State or Federal environmental regulations, during 2006.
Page 3 of 3