ML071020308

From kanterella
Jump to navigation Jump to search
Notice of Meeting Between the Nuclear Regulatory Commission Staff and the Expert Panel for the Wolf Creek Advanced Fea Analyses
ML071020308
Person / Time
Site: Wolf Creek 
Issue date: 04/11/2007
From: Mauricio Gutierrez
NRC/RES/DFERR/DDME/CIB
To: Uhle J
NRC/RES/DFERR/DDME
MAURICIO GUTIERREZ, RES 301-415-1122
References
Download: ML071020308 (6)


Text

April 13, 2007 MEMORANDUM TO: Jennifer L. Uhle, Deputy Director Materials Engineering Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research THRU:

Robert O. Hardies, Chief /RA/

Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research FROM:

Mauricio Gutierrez, General Engineer /RA/

Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research

SUBJECT:

MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND THE EXPERT PANEL FOR THE WOLF CREEK ADVANCED FEA ANALYSES DATE & TIME:

Tuesday, May 1, 2007 11:00 A.M. - 5:00 P.M.

LOCATION:

Dominion Engineering Inc.

11730 Plaza America Drive Suite 310 Reston, Virginia 20190 PURPOSE:

Industry will present their assumptions for modeling weld residual stresses in their overall Phase II Advanced Finite Element Fracture Mechanics Analyses and NRC staff will provide comments or concerns regarding their modeling plans.

CATEGORY 2:

  • This is a Category 2 meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Regulatory Research (RES).

NRC Industry R. Hardies Glenn White (Dominion Engineering)

A. Csontos Craig Harrington (EPRI)

D. Rudland et al.

et al.

Enclosure:

Agenda cc w/encl: See next page CONTACTS:

M. Gutierrez, RES A. Csontos, RES 301-415-1122 301-415-6352 MRG3@nrc.gov AAC@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002.

April 13, 2007

MEMORANDUM TO: Jennifer L. Uhle, Deputy Director Materials Engineering Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research THRU:

Robert O. Hardies, Chief /RA/

Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research FROM:

Mauricio Gutierrez, General Engineer /RA/

Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research

SUBJECT:

MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND THE EXPERT PANEL FOR THE WOLF CREEK ADVANCED FEA ANALYSES DATE & TIME:

Tuesday, May 1, 2007 11:00 A.M. - 5:00 P.M.

LOCATION:

Dominion Engineering Inc.

11730 Plaza America Drive Suite 310 Reston, Virginia 20190 PURPOSE:

Industry will present their assumptions for modeling weld residual stresses in their overall Phase II Advanced Finite Element Fracture Mechanics Analyses and NRC staff will provide comments or concerns regarding their modeling plans.

CATEGORY 2:

  • This is a Category 2 meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC Industry R. Hardies Glenn White (Dominion Engineering)

A. Csontos Craig Harrington (EPRI)

D. Rudland et al.

et al.

Enclosure:

Agenda cc w/encl: See next page

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002.

DISTRIBUTION:

DFERR R/F ME R/F C:\\MyFiles\\Copies\\ML0710203080.wpd OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO: ML071020308 TEMPLATE NO. NRC- 001 Publicly Available? (Y or N) N DATE OF RELEASE TO PUBLIC:

SENSITIVE? N To receive a copy of this document, indicate in the box: C = Copy without attachment/enclosure E" = Copy with attachment/enclosure N" = No copy OFFICE RES/DFERR/CIB RES/DFERR/CIB SISP REVIEW Originator SISP REVIEW Branch Chief NAME MGutierrez RHardies MGutierrez RHardies DATE 04/13 /07 04/13 /07 04/13/07 04/13/07 OFFICIAL RECORD COPY

DISTRIBUTION FOR FORTHCOMING CATEGORY 2 PUBLIC MEETING WITH THE EXPERT PANEL FOR THE WOLF CREEK ADVANCED FEA ANALYSES Date: 04/13/07 PUBLIC PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsOpaMail MMurphy RidsNrrDciCpnb ESullivan JGrobe MEvans WBateman TChan TLupold RHardies MKhanna ACsantos Ssheng MGutierrez PMNS RJasinski RidsOgcMailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)

RidsNrrDe

Enclosure AGENDA*

NUCLEAR REGULATORY COMMISSION MEETING WITH WOLF CREEK EXPERT PANEL ON WELD RESIDUAL STRESSES MAY 1, 2007 Introductions NRC Project Manager Opening Remarks NRC and Industry Discussion Weld Residual Stresses and Modeling for Phase II Calculations NRC and Industry Address Public Questions/Comments NRC Conclusions Industry and NRC

  • Agenda is subject to change

cc:

Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Gary Welsh Institute of Nuclear Power Operations Suite 100 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. Jay Thayer, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jkt@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mr. David J. Modeen Vice President and Chief Nuclear Officer EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Mr. John Gaertner EPRI

1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 jgaertner@epri.com Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 ryang@epri.com Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com