MONTHYEARML0703100942007-02-12012 February 2007 RAI, R.E. Ginna Response to Generic Letter (GL) 2003-01, Control Room Habitability Project stage: RAI ML0710105442007-04-0606 April 2007 Response to Request for Additional Information Regarding R.E. Ginna Response to Generic Letter (GL) 2003-01, Control Room Habitability. Project stage: Response to RAI ML0713401052007-06-15015 June 2007 NRC Receipt of R. E. Ginna Nuclear Power Plant Response to Generic Letter 2003-01 Control Room Habitability Project stage: Other 2007-04-06
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] |
Text
Maria Korsnick Site Vice President Constellation Energy-.Generation Group R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 585.771.5200 585.771.3943 Fax maria.korsnick@costellation.com April 6, 2007 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to Request for Additional Information Regarding R.E. Ginna Response to Generic Letter (GL) 2003-01, "Control Room Habitability" (TAC No. MB9807)Letter from Mary G. Korsnick (Ginna) to USNRC Document Control Desk, Supplemental Response to NRC Generic Letter 2003-01, Control Room Habitability, dated August 31, 2005.Letter from Douglas V. Pickett (NRC) to Mary G. Korsnick (Ginna), Request for Additional Information Regarding R.E. Ginna Response to Generic Letter (GL) 2003-01, "Control Room Habitability" (TAC No. MB9807), dated February 12, 2007 Reference 1: Reference 2: On August 31, 2005, R.E. Ginna Nuclear Power Plant, LLC (Ginna, LLC) provided a supplemental response (Reference
- 1) to Generic Letter (GL) 2003-01. On February 12, 2007 the NRC requested additional information (Reference
- 2) regarding that response.
Attachment (1) provides the Ginna, LLC response to Reference 2 and Attachment (2) provides a list of regulatory commitments contained in this letter.Should you have questions regarding the information in this submittal, please contact Mr. Robert Randall at (585) 771-5219 or Robert.Randall
@constellation.com.
4 Very truly yo Mary G. 'rsnick Document Control Desk April 6, 2007 Page 2 MK/MR Attachments:
(1)(2)Response to Request for Additional Information List of Regulatory Commitments cc: S. J. Collins, NRC D.V. Pickett, NRC Resident Inspector, NRC (Ginna)P.D. Eddy, NYSDPS J. P. Spath, NYSERDA Attachment (1)I Response to Request for Additional Information Attachment (1)Page 1 of 3 Attachment (1)Response to Request for Additional Information Requested Information:
Generic Letter (GL) 2003-01 requested confirmation that your facility's control room meets the applicable habitability regulatory requirements and that the control room habitability systems are designed, constructed, configured, operated, and maintained in accordance with the facility's design and licensing bases. Item 1c of the GL requested that you confirm that your Technical Specifications (TSs) verify the integrity of the control room envelope and the assumed inleakage rates of potentially contaminated air. The GL further requested that if you currently have a zP surveillance requirement (SR) to demonstrate control room envelope integrity, that you provide the basis for your conclusion that it remains adequate to demonstrate control room envelope integrity in light of ASTM E741 testing results. If you concluded that your zP SR is no longer adequate, the GL requested that you provide a schedule for: 1. Revising the SR in your TSs to reference an acceptable surveillance methodology (e.g., ASTM E741), and 2. Making any necessary modifications to your control room envelope so that compliance with your new SR could be demonstrated.
If you do not currently have a TS SR for control room envelope integrity, you were requested to explain how and at what frequency you confirm control room envelope integrity and why that method is adequate to demonstrate control room envelope integrity.
In your August 31, 2005, response to Item Ic of GL 2003-01, you stated that Ginna's TSs do not presently contain SRs to verify assumed in-leakage.
You further stated that you recently verified that control room in-leakage is less than that assumed in the various analyses, (as stated in your response to Item la of GL 2003-01) and that the industry and the NRC are currently working toward resolution on Technical Specification Task Force (TSTF) 448, and a change to NUREG-1431 Standard Technical Specifications, which will answer these concerns (i.e., surveillance testing).
You stated that you will continue to work with the NRC and industry in this regard and that when appropriate regulatory guidance is available, you will consider submitting a Technical Specification amendment request based on that guidance.Attachment (1)Page 2 of 3 Based on the above, it is requested that you submit an additional response to Item 1 c of GL 2003-01 that includes the following:
- 1. An explanation of how and at what frequency you currently confirm control room envelope integrity and why that method is adequate to demonstrate control room envelope integrity (as originally requested in GL 2003-01, Item ic).2. A description of your plans to adopt TSTF-448, including a commitment to submit an LAR based on TSTF-448.
The commitment should include a milestone for completion (such as within 90 days of the NRC's approval of TSTF-448).
Or, in the event that you decide not to submit an LAR to adopt applicable sections of TSTF-448 into your TSs, the NRC staff requests that you provide: (a) an acceptable alternative that will ensure your control room envelope will be in compliance with the regulations; and, (b) in light of the commitment made by the majority of the respondents to adopt applicable portions of TSTF-448, explain your rational (including any potential hardship) for not committing to this industry standard.Response: As stated in Reference 1, Ginna LLC confirmed the control room envelope integrity in February of 2005 using ASTM E741 test methodology.
The results indicated a measured inleakage well below the inleakage assumed in the accident dose and chemical analyses.
Ginna TS do not contain a requirement to perform this test. Therefore, until such time that a new TS surveillance requirement (SR) is approved, Ginna LLC commits to perform a self assessment of the integrity of the control room boundary in 2008, followed by another inleakage test using ASTM E741 methodology in 2011. Since this commitment is consistent with Regulatory Guide 1.197, Ginna will adequately demonstrate control room envelope integrity.
Ginna LLC will adopt TSTF-448 consistent with the existing Control Room Emergency Air Treatment System (CREATS) design, and commits to submit the associated license amendment request by August 27, 2007.Attachment (1)Page 3 of 3 Attachment (2)List of Regulatory Commitments Attachment 2 Page 1 of 2 Attachment (2)List of Regulatory Commitments The following table identifies those actions committed to by R.E. Ginna Nuclear Power Plant, LLC in this document.
Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
Please direct questions regarding these commitments to Robert Randall at (585) 771-5219, or Robert.Randall
@ constellation.com.
REGULATORY COMMITMENT DUE DATE Submit a license amendment request to adopt TSTF-448 consistent with existing CREATS August 27, 2007 design.Perform a self assessment of the control room February 8, 2008 (This commitment date is boundary.
three (3) years from the initial inleakage test as directed by Regulatory Guide 1.197, and may be adjusted per SR 3.0.2 as indicated in TSTF-448)Measure control room inleakage using ASTM February 8, 2011 (This commitment date is six E741 methodology.
(6) years from the initial inleakage test as directed by Regulatory Guide 1.197 and may be adjusted per SR 3.0.2, as indicated in TSTF-448)Attachment 2 Page 2 of 2