71FR46245, Entergy Nuclear Operations Inc; Notice of Receipt and Availability of Application for Renewal of James A. FitzPatrick Nuclear Power Plant for an Additional 20-Year Period
ML071000081
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/11/2006
From: Kuo P
NRC/NRR/ADRO/DLR
To:
References
4510-30-P, 71FR46245
Download: ML071000081 (1)


Text

Federal Register / Vol. 71, No. 155 / Friday, August 11, 2006 / Notices 46245 Signed in Washington, DC, this 7th day of ADAMS or who encounter problems in the premerger shareholders of CEG, Inc.,

August 2006. accessing the documents located in will own the remaining approximately Erica R. Cantor, ADAMS should contact the NRCs PDR 40 percent. In addition, the CEG, Inc.,

Director, Division of Trade Adjustment Reference staff at 1-800-397-4209, Board of Directors will be composed of Assistance. extension 301-415-4737, or by e-mail to fifteen members, nine of whom will be

[FR Doc. E6-13177 Filed 8-10-06; 8:45 am] pdr@nrc.gov. named by FPL Group, and six of whom BILLING CODE 4510-30-P A copy of the license renewal will be named by the current CEG, Inc.

application for the James A. FitzPatrick Approval of the indirect transfer of Nuclear Power Plant, is also available to the facility operating licenses was NUCLEAR REGULATORY local residents near the James A. requested by FPL pursuant to 10 CFR COMMISSION FitzPatrick Nuclear Power Plant at the 50.80. Notice of the request for approval Penfield Library (Selective Depository), and an opportunity for a hearing was

[Docket No. 50-333] Reference and Documents Department, published in the Federal Register on State University of New York, Oswego, February 22, 2006 (71 FR 9170). No Entergy Nuclear Operations, Inc.; New York 13126. comments or petitions to intervene were Notice of Receipt and Availability of received.

Application for Renewal of James A. Dated at Rockville, Maryland, this 7th day of August 2006.

Pursuant to 10 CFR 50.80, no license, FitzPatrick Nuclear Power Plant or any right thereunder, shall be (Facility Operating License No. Dpr-59) For the Nuclear Regulatory Commission.

transferred, directly or indirectly, for an Additional 20-Year Period Pao-Tsin Kuo, through transfer of control of the Deputy Director, Division of License Renewal, license, unless the Commission shall The U.S. Nuclear Regulatory Office of Nuclear Reactor Regulation. give its consent in writing. Upon review Commission (NRC or Commission) has [FR Doc. E6-13124 Filed 8-10-06; 8:45 am] of the information in the application by received an application, dated July 31, BILLING CODE 7590-01-P FPL and other information before the 2006, from Entergy Nuclear Operations, Commission, the NRC staff concludes Inc., filed pursuant to Section 104(b) that the proposed merger and resulting (Operating License No. DPR-59) of the NUCLEAR REGULATORY indirect transfer of control of the Atomic Energy Act of 1954, as amended, COMMISSION licenses will not affect the qualifications and Title 10 of the Code of Federal

[Docket Nos. 50-250 and 50-251; License of FPL as a holder of the facility Regulations Part 54 (10 CFR Part 54), to Nos. Dpr-31 And Dpr-41] licenses, and that the indirect transfer of renew the operating license for the control of the license as held by FPL, is James A. FitzPatrick Nuclear Power In the Matter of Florida Power and otherwise consistent with applicable Plant. Renewal of the license would Light Company; (Turkey Point Plant, provisions of law, regulations, and authorize the applicant to operate the Unit Nos. 3 And 4); Order Approving orders issued by the Commission facility for an additional 20-year period Application Regarding Corporate pursuant thereto.

beyond the period specified in the Merger The findings set forth above are current operating license. The current supported by a safety evaluation dated operating license for the James A. I August 3, 2006.

FitzPatrick Nuclear Power Plant (DPR- Florida Power and Light Company

59) expires on October 17, 2014. The (FPL or the licensee) is the holder of the III James A. FitzPatrick Nuclear Power Facility Operating Licenses, Nos. DPR- Accordingly, pursuant to Sections Plant is a boiling-water reactor designed 31 and DPR-41, which authorize the 161b, 161i, 161o, and 184 of the Atomic by General Electric. The unit is located possession, use, and operation of the Energy Act of 1954, as amended (the near the town of Lycoming, New York. Turkey Point Plant, Units 3 and 4 (the Act), 42 U.S.C. 2201(b), 2201(i), 2201(o),

The acceptability of the tendered facility). FPL is licensed by the U.S. and 2234; and 10 CFR 50.80, It is hereby application for docketing, and other Nuclear Regulatory Commission (NRC ordered that the application regarding matters including an opportunity to or Commission) to operate the facility. the proposed merger and indirect request a hearing, will be the subject of The facility is located at the licensees license transfer is approved, subject to subsequent Federal Register notices. site in Miami-Dade County, Florida. the following conditions:

Copies of the application are available (1) FPL shall provide the Director of for public inspection at the II the Office of Nuclear Reactor Regulation Commissions Public Document Room By application dated January 20, 2006 a copy of any application, at the time it (PDR), located at One White Flint North, (the application), FPL requested that the is filed, to transfer (excluding grants of 11555 Rockville Pike (first floor), NRC, pursuant to 10 CFR 50.80, consent security interests or liens) from FPL to Rockville, Maryland, 20582 or to the proposed indirect transfer of its parent, or to any other affiliated electronically from the NRCs control of the licenses for the facility. company, facilities for the production, Agencywide Documents Access and According to the application filed by transmission, or distribution of electric Management System (ADAMS) Public FPL, the facility is wholly owned by energy having a depreciated book value Electronic Reading Room under FPL. exceeding ten percent (10%) of FPLs Accession Number ML062160486. The As stated in the application, in net utility plant, as recorded on its ADAMS Public Electronic Reading connection with the proposed merger of books of accounts.

Room is accessible from the NRC Web FPLs parent company, FPL Group, Inc. (2) Should the proposed merger not be site at http://www.nrc.gov/reading-rm/ (FPL Group), and Constellation Energy completed within one year from the hsrobinson on PROD1PC67 with NOTICES1 adams.html. In addition, the application Group, Inc. (CEG, Inc.), FPL Group will date of issuance, this Order shall is available on the NRC Web page at become a wholly owned subsidiary of become null and void, provided, http://www.nrc.gov/reactors/operating/ CEG, Inc. At the closing of the merger, however, upon written application and licensing/renewal/application.html. the former shareholders of FPL Group good cause shown, such date may, in while the application is under review. will own approximately 60 percent of writing, be extended.

Persons who do not have access to the outstanding stock of CEG, Inc., and This Order is effective upon issuance.

VerDate Aug<31>2005 15:03 Aug 10, 2006 Jkt 208001 PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\11AUN1.SGM 11AUN1