ML071000055

From kanterella
Jump to navigation Jump to search
Endorsement of Appendices E and F, NEI 03-12, Template for the Security Plan and Training and Qualification Plan (and Independent Spend Fuel Storage Installation Security Program)
ML071000055
Person / Time
Issue date: 04/27/2007
From: Patricia Holahan
Division of Security Policy
To: Heymer A
Nuclear Energy Institute
vxw1
References
NEI 03-12
Download: ML071000055 (2)


Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION April 27, 2007 Adrian P. Heymer, Senior Director New Plant Deployment, Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

APPENDIX E, NEI 03-12, TEMPLATE FOR THE SECURITY PLAN AND TRAINING AND QUALIFICATION PLAN [AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM]

Dear Mr. Heymer:

In your August 18, 2006 letter, you requested the U.S. Nuclear Regulatory Commission (NRC) staff to review and endorse Appendix E, Additional Security Measures for Operating Reactors During Construction of New Reactor Plants within the Owner-Controlled Area, of the NEI 03-12, generic security plan template.

The NRC staff met with NEI and industry representatives of the New Plants Security Task Force (NPSTF) on several occasions to discuss Appendix E. We understand that Appendix E is intended to identify enhanced security measures at existing power reactor sites when new plant construction is ongoing within the owner-controlled area, and includes a generic approach to maintain a level of physical protection equivalent to the requirements of Title 10 of the Code of Federal Regulation (10 CFR), Section 73.55.

We have found that implementation of the proposed security measures in Appendix E (Enclosure) Revision 1 dated March 26, 2007, with site-specific details, would be an acceptable method to comply with the requirements of 10 CFR 73.55. We wish to note that Appendix E does not preclude licensees from incorporating additional security measures to address site-specific issues in accordance with NRC regulations. After discussion with your staff, Appendix E has been identified as Revision 5. Upon completing the Appendix E bracketed site-specific security measures, licensees must handle this appendix as safeguards information in accordance with 10 CFR 73.21.

NOTICE: The document transmitted herewith contains Security Related Information. When separated from enclosure this cover document is Decontrolled.

Sincerely, Patricia Holahan, Director /RA/

Division Security Policy

Enclosure:

NEI 03-12, Appendix E

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION Adrian P. Heymer, Senior Director New Plant Deployment, Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

APPENDIX E, NEI 03-12, TEMPLATE FOR THE SECURITY PLAN AND TRAINING AND QUALIFICATION PLAN [AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM]

Dear Mr. Heymer:

In your August 18, 2006 letter, you requested the U.S. Nuclear Regulatory Commission (NRC) staff to review and endorse Appendix E, Additional Security Measures for Operating Reactors During Construction of New Reactor Plants within the Owner-Controlled Area, of the NEI 03-12, generic security plan template.

The NRC staff met with NEI and industry representatives of the New Plants Security Task Force (NPSTF) on several occasions to discuss Appendix E. We understand that Appendix E is intended to identify enhanced security measures at existing power reactor sites when new plant construction is ongoing within the owner-controlled area, and includes a generic approach to maintain a level of physical protection equivalent to the requirements of Title 10 of the Code of Federal Regulation (10 CFR), Section 73.55.

We have found that implementation of the proposed security measures in Appendix E (Enclosure) Revision 1 dated March 26, 2007, with site-specific details, would be an acceptable method to comply with the requirements of 10 CFR 73.55. We wish to note that Appendix E does not preclude licensees from incorporating additional security measures to address site-specific issues in accordance with NRC regulations. After discussion with your staff, Appendix E has been identified as Revision 5. Upon completing the Appendix E bracketed site-specific security measures, licensees must handle this appendix as safeguards information in accordance with 10 CFR 73.21.

NOTICE: The document transmitted herewith contains Security Related Information. When separated from enclosure this cover document is Decontrolled.

Sincerely Patricia K. Holahan, Director /RA/

Division of Security Policy

Enclosure:

NEI 03-12, Appendix E DISTRIBUTION:

Dsp R/F Dso r/f Ogc ADAMS Accession Number: ML071000055 OFC DSP: RSB TL: RSB DD: NRO DD: DDSO DD: DDRSR OGC D: DSP*

NAME V. Williams D. Huyck J. Lyons R. Correia S. Morris HAB for JRG S. Morris for P. Holahan DATE 4/ 16 /07 4/17 /07 4/18 /07 4/ 20 /07 4/26 /07 4/ 27 /07 4/ 27 /07 OFFICIAL RECORD COPY