April 30, 2007 Mrs. Mary G. Korsnick Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
NRC RECEIPT OF R.E. GINNA NUCLEAR POWER PLANT RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1583)
Dear Mrs. Korsnick:
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006, response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, your response states that your nuclear power plant relies on either the Hemyc or MT fire barrier system, and that you have submitted documentation that you plan to disposition any nonconforming conditions in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.48(c) process. Also, compensatory measures have been in place since April 6, 2005; your response states that additional compensatory measures, or changes to the current measures, may be considered based on NRC Information Notice 97-48, NRC Regulatory Issue Summary 2005-07, and future industry guidance. Based on your response, the acceptability of these barriers will be reviewed by the NRC during Ginna's transition to 10 CFR 50.48(c). Therefore, no further action is requested of you.
If you have any questions regarding this response, please contact me at (301) 415-1364.
Sincerely,
/RA/
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244 cc: See next page
April 30, 2007 Mrs. Mary G. Korsnick Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
NRC RECEIPT OF R.E. GINNA NUCLEAR POWER PLANT RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1583)
Dear Mrs. Korsnick:
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006, response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, your response states that your nuclear power plant relies on either the Hemyc or MT fire barrier system, and that you have submitted documentation that you plan to disposition any nonconforming conditions in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.48(c) process. Also, compensatory measures have been in place since April 6, 2005; your response states that additional compensatory measures, or changes to the current measures, may be considered based on NRC Information Notice 97-48, NRC Regulatory Issues Summary 2005-07, and future industry guidance. Based on your response, the acceptability of these barriers will be reviewed by the NRC during Ginna's transition to 10 CFR 50.48(c). Therefore, no further action is requested of you.
If you have any questions regarding this response, please contact me at (301) 415-1364.
Sincerely,
/RA/
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrPMDPickett RidsNrrLASLittle LPLI-1 R/F RidsNrrDorlLpl1-1 RidsNrrDraAfpb RidsOgcRp RidsNrrDprPgcb RidsNrrAcrsAcnwMailCenter MDavid Accession Number: ML070940337 NRR-106 OFFICE LPL1-1/PE LPL1-1/PM LPL1-1/LA AFPB/BC LPL1-1/BC NAME MDavid DPickett SLittle SWeerakkody MKowal DATE 4 /16 /07 4/27/07 4 / 16 /07 4 / 27 /07 4/30/07 OFFICIAL RECORD COPY
R.E. Ginna Nuclear Power Plant cc:
Mr. Michael J. Wallace President R.E. Ginna Nuclear Power Plant, LLC c/o Constellation Energy 750 East Pratt Street Baltimore, MD 21202 Mr. John M. Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401 Kenneth Kolaczyk, Sr. Resident Inspector R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 1503 Lake Road Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Carey W. Fleming, Esquire Senior Counsel - Nuclear Generation Constellation Generation Group, LLC 750 East Pratt Street, 17th Floor Baltimore, MD 21202 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Ms. Thelma Wideman, Director Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31 Lyons, NY 14489 Ms. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness 1190 Scottsville Road, Suite 200 Rochester, NY 14624 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223