ML070930346
From kanterella
Jump to navigation
Jump to search
ML070930346 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 01/31/2005 |
From: | AmerGen Energy Co, Exelon Nuclear |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML070930346 (1) | |
Similar Documents at Clinton | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22216A2212022-05-19019 May 2022
[Table view]2 to Updated Safety Analysis Report, Appendix E, Figures Part 1 of 2_Redacted ML22111A2102022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A1962022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2162022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix a, Glossary ML22111A1922022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2182022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix C, Computer Programs RS-22-048, 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls)2022-03-31031 March 2022 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls) ML22111A2142022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML22111A2082022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A1912022-03-31031 March 2022 2 to Updated Safety Analysis Report, USAR Cover and List of Effective Pages (Loep) ML22111A2152022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML22111A1982022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A2022022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 4, Reactor ML22111A1942022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 1 of 2 ML22111A1952022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 2 of 2 ML22111A1932022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Site Characteristics ML22111A2072022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML22111A2172022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML22111A2052022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 7, Instrument and Control Systems ML22111A2122022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML22111A1972022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 1 of 5 ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2032022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2202022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML22111A1902022-03-31031 March 2022 Submittal of Revision 22 to Updated Safety Analysis Report, Letter and Attachments A-F ML22111A2062022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 8, Electric Power ML22111A2242022-03-31031 March 2022 2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm) ML22111A2112022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML22111A2092022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20105A2512020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5 ML20105A2432020-03-31031 March 2020 1 to Updated Safety Analysis Report ML20105A2712020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix C, Computer Programs ML20105A2732020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML20105A2642020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2612020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20105A2652020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML20105A2682020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML20105A2592020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 8, Electric Power RS-20-028, 1 to Updated Safety Analysis Report, CPS Tsb2020-03-31031 March 2020 1 to Updated Safety Analysis Report, CPS Tsb ML20105A2492020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML20105A2502020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.3-1, Part 1 of 5 ML20105A2582020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Control Systems ML20105A2522020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5 ML20105A2532020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 4 of 5 ML20105A2702020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML20105A2672020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML20105A2692020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix a, Glossary ML20105A2622020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management 2022-05-19 |
Text
CPS/USAR CHAPTER 16 - TECHNICAL SPECIFICATIONS The Clinton Power Station Technical Specifications are Appendix A of the Operating License.
Many operational requirements previously controlled by Technical Specifications are contained in the Operational Requirements Manual. The Operational Requirements Manual is incorporated into the CPS USAR by reference and will be revised in the same manner as the USAR.
CHAPTER 16 16-1 REV. 11, JANUARY 2005
Retrieved from "https://kanterella.com/w/index.php?title=ML070930346&oldid=2251509"