Ohio Environmental Protection Agency Approval for Essential Maintenance Discharge
ML070930299
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/27/2007
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-3030L
Download: ML070930299 (2)


Text

FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 L. William Pearce Vice President 440-280-5382 Fax: 440-280-8029 March 27, 2007 PY-CEI/NRR-3030L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440

Subject:

Ohio Environmental Protection Agency Approval for "Essential Maintenance Discharge" Ladies and Gentlemen:

Attached is a copy of the Ohio Environmental Protection Agency's (OEPA) approval for an "Essential Maintenance Discharge" at the Perry Nuclear Power Plant dated March. 9,2007: This. is'achange to the manual discharge path described in the plant's National Pollutant Discharge Elimination System (NPDES) permit and the attached information is provided in accordance with the Perry Operating License, NPF-58, Appendix B, Environmental Protection Plan, section 3.2.

If you have questions or require additional information please contact Ms. Elizabeth Ryan at (440) 280-5536.

Sincerely, L. William Pearce Vice President - Nuclear Attachment.

cc: NRC Region III RC Resident Inspector.

._.NRC Rojects Manager.

State of Ohio Environmental Protection Agency Northeast District Office 2110 East Aurora Rd.

TELE: (330) 963-1200 FAX: (330) 487-0769 Ted Strickland, Governor Twinsburg, Ohio 44087 www.epa.state.oh.us Lee Fisher, Lieutenant Governor Chris Korleski, Director March 9, 2007 RE:

PERRY NUCLEAR POWER PLANT LAKE COUNTY PERMIT NO. 31B00016 MAINTENANCE DISCHARGE Ms. Liz Ryan, Nuclear Specialist FirstEnergy Nuclear Operating Company I

Perry Nuclear Power Plant MAR 13200 10 Center Road Perry, OH 44081

Dear Ms. Ryan:

This office has reviewed your correspondence dated October 7, 2006, requesting approval for an essential maintenance discharge. We understand that essential maintenance is planned to be performed on the Perry Nuclear Power Plant circulating water system during a refuel outage scheduled to begin March 2007.

Approximately 468,207 gallons will be pumped to the storm drain systems on the east side of the plant, and an additional 169,529 gallons of water will be pumped to a storm water impoundment on the west side of the plant. The letter indicates the quality of the water to be discharged will be in compliance with the effluent limits described in the facility's current permit for ouffall 31B00016004. Based on our review of the information provided, this office has no objection to the course of action outlined in your correspondence.

This office recommends draining the system over an extended period in order to minimize any impact the additional flow may have on the streams.

Should you have any comments or questions concerning this letter, please feel free to call me at (330) 963-1143.

Respectfully, Michael W. Stevens Environmental Engineer Division of Surface Water MWS/mt 0