ML070920240

From kanterella
Jump to navigation Jump to search
Assignment of Nuclear Regulatory Commission Branch Chief
ML070920240
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/02/2007
From: Hiltz T
NRC/NRR/ADRO/DORL/LPLIV
To: Venable J
Entergy Operations
Vaidya B, NRR/DORL/LP4, 415-3308
References
Download: ML070920240 (3)


Text

April 2, 2007 Mr. Joseph E. Venable Vice President for Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION RE: ASSIGNMENT OF NUCLEAR REGULATORY COMMISSION BRANCH CHIEF

Dear Mr. Venable:

This is to inform you that effective immediately, Mr. Thomas G. Hiltz is replacing Mr. David Terao as Chief, Plant Licensing Branch IV. Mr. Hiltz may be reached by telephone at 301-415-4052 or electronic mail at tgh@nrc.gov.

All direct correspondence for Mr. Hiltz should be sent to:

Mr. Thomas G. Hiltz, Addressee Only U.S. Nuclear Regulatory Commission Mail Stop O-7 D1A Washington, DC 20555 Sincerely,

/RA/

Thomas G. Hiltz, Chief Project Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page

ML070920240 OFFICE NRR/DORL/LPLIV/LA NRR/DORL/LPLIV/BC NAME JBurkhardt THiltz DATE 4/2/07 4/2/07

November 2006 River Bend Station cc:

Manager, Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director, Nuclear Safety & Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298 Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA 70821-4312 Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 General Manager Plant Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director, Nuclear Safety Assurance Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA 70804-9095 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497