ML070920097

From kanterella
Jump to navigation Jump to search
Closed Meeting Notice with BWROG to Discuss Proposed Licensing Topical Report Regarding the Decay Ratio Adder Removal from the Stability Exclusion Region Methodology for BWROG Stability Solution Options I-D and II
ML070920097
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 04/10/2007
From: Michelle Honcharik
NRC/NRR/ADRA/DPR/PSPB
To: Rosenberg S
NRC/NRR/ADRA/DPR/PSPB
honcharik, M C, NRR/DPR, 415-1774
References
Download: ML070920097 (5)


Text

MEMORANDUM TO: Stacey L. Rosenberg, Chief April 10, 2007 Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:

Michelle C. Honcharik, Project Manager

/RA/

Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING CLOSED MEETING WITH THE BOILING WATER REACTORS OWNERS GROUP (BWROG)

DATE & TIME:

Wednesday, April 18, 2007 9:00 a.m. - 12:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 16B2 Rockville, Maryland PURPOSE:

To discuss proposed licensing topical report regarding the decay ratio adder removal from the stability exclusion region methodology for BWROG Stability Solution Options I-D and II. This is the second pre-submittal meeting on this topic. The first pre-submittal meeting was held on December 13, 2005. The meeting notice, meeting summary, and presentation slides from the first meeting are available in the Agencywide Documents Access and Management System as Package Accession No. ML060240100.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC BWROG M. Honcharik A. Chung G. Cranston J. Harrison, et al.

T. Huang J. March-Lueba (NRC Contractor)

Project No. 691

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACT: Michelle Honcharik, NRR 301-415-1774 mch3@nrc.gov

April 10, 2007 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:

Michelle C. Honcharik, Project Manager

/RA/

Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING CLOSED MEETING WITH THE BOILING WATER REACTORS OWNERS GROUP (BWROG)

DATE & TIME:

Wednesday, April 18, 2007 9:00 a.m. - 12:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 16B2 Rockville, Maryland PURPOSE:

To discuss proposed licensing topical report regarding the decay ratio adder removal from the stability exclusion region methodology for BWROG Stability Solution Options I-D and II. This is the second pre-submittal meeting on this topic. The first pre-submittal meeting was held on December 13, 2005. The meeting notice, meeting summary, and presentation slides from the first meeting are available in the Agencywide Documents Access and Management System as Package Accession No. ML060240100.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC BWROG M. Honcharik A. Chung G. Cranston J. Harrison, et al.

T. Huang J. March-Lueba (NRC Contractor)

Project No. 691

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACT: Michelle Honcharik, NRR 301-415-1774 mch3@nrc.gov ADAMS ACCESSION NO.:ML070920097 NRR-106 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME MHoncharik DBaxley SRosenberg DATE 4/6/2007 4/3/2007 4/10/2007 OFFICIAL RECORD COPY

DISTRIBUTION FOR FORTHCOMING CLOSED MEETING WITH BWROG Date: April 10, 2007 PUBLIC PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrPMMHoncharik RidsNrrLADBaxley RidsOpaMail Tai Huang Gregory Cranston RJasinski RidsOgcMailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)

Jose March-Lueba (MarchLeubaJA@ornl.gov)

ENCLOSURE AGENDA MEETING WITH THE BOILING WATER REACTOR OWNERS' GROUP (BWROG)

APRIL 18, 2007 Open Questions from Previous Presentations Current Plants and Cycles On-Line Stability Monitor Experience Haling Methodology and Conservatisms Buffer Region ODYSY Methodology Changes Modified Shape Function Proposed ODYSY Procedure and Feedwater Temperature Reduction Removal of 0.15 Decay Ratio Adder Summary and Conclusion

BWR Owners Group Project No. 691 Mr. Doug Coleman Vice Chair, BWR Owners Group Energy Northwest Columbia Generating Station Mail Drp PE20 P.O. Box 968 Richland, WA 99352-0968 DWCOLEMAN@energy-northwest.com Mr. Amir Shahkarami Executive Chair, BWR Owners Group Exelon Generation Co., LLC Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 amir.shahkarami@exeloncorp.com Mr. Richard Libra Executive Vice Chair, BWR Owners Group DTE Energy - Fermi 2 M/C 280 OBA 6400 North Dixie Highway Newport, MI 48166 librar@dteenergy.com Mr. William A. Eaton Entergy Operations Inc.

P.O. Box 31995 Jackson, MS 39286 weaton@entergy.com Mr. Richard Anderson First Energy Nuclear Operating Co Perry Nuclear Power Plant 10 Center Road Perry, OH 44081 randerson@firstenergycorp.com Mr. Scott Oxenford Energy Northwest Columbia Generating Station Mail Drp PE04 P.O. Box 968 Richland, WA 99352-0968 wsoxenford@energy-northwest.com Mr. James F. Klapproth GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 james.klapproth@gene.ge.com Mr. Joseph E. Conen Regulatory Response Group Chair BWR Owners Group DTE Energy-Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 conenj@dteenergy.com Mr. J. A. Gray, Jr.

Regulatory Response Group Vice-Chair BWR Owners Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 JGray4@entergy.com Mr. Thomas G. Hurst GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 thomas.hurst@ge.com Mr. Tim E. Abney GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 tim.abney@ge.com Mr. Randy C. Bunt Chair, BWR Owners Group Southern Nuclear Operating Company 40 Inverness Center Parkway/Bin B057 Birmingham, AL 35242 RCBUNT@southernco.com 2/23/07