MN 07-017, Notice of Meeting with Exelon Generating Co., Llc. to Discuss the NRCs Assessment of the Safety Performance of the Limerick for Calendar Year 2006

From kanterella
(Redirected from ML070880459)
Jump to navigation Jump to search
Notice of Meeting with Exelon Generating Co., Llc. to Discuss the NRCs Assessment of the Safety Performance of the Limerick for Calendar Year 2006
ML070880459
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/29/2007
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
MN 07-017
Download: ML070880459 (4)


Text

MN No.07-017 April 2, 2007 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee:

Exelon Generating Company, LLC Facility:

Limerick Generating Station, Units 1 and 2 Docket Nos.:

50-352 and 50-353 Date/Time:

April 18, 2007 at 6:30 p.m.

Location:

Limerick Energy Information Center 298 Longview Road Royersford, PA 19468-1016

Purpose:

The NRC requested an Annual Assessment Meeting with Exelon to discuss the NRCs assessment of the safety performance of the Limerick Generating Station for calendar year 2006. The NRCs assessment is documented in a letter dated March 2, 2007.

Attendees*:

NRC:

P. Krohn, Chief, Projects Branch 4, Region I M. Gray, Chief, DRP C. Bickett, Acting Senior Resident Inspector, Limerick L. Casey, Acting Resident Inspector, Limerick Licensee:

C. Mudrick, Site Vice President E. Callan, Plant Manager Public Participation:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs assessment letter can be found in ADAMS with Accession Number ML070610599.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and the safety performance of Limerick Generating Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

2 Meeting

Contact:

Paul Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: PGK1@nrc.gov Handicapped persons requiring assistance to attend or participate in this meeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting. Attendance by other NRC personnel should be made known by April 16, 2007.

Approved By: /RA/

Paul Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:

Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Senior Vice President - Mid-Atlantic Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear

Agenda NRCs Annual Assessment Meeting Limerick Generating Station April 18, 2007 Introduction.................................................... NRC (3 minutes)

Review of Reactor Oversight Process................................ NRC (5 minutes)

National Summary of Plant Performance.............................. NRC (7 minutes)

Discussion of Limerick Performance................................ NRC (15 minutes)

Exelons Response and Remarks................................ Exelon (30 minutes)

Closing Remarks................................................ NRC (5 minutes)

Short Break......................................................... (5 minutes)

NRC to address public questions................ NRC/Members of the Public (as needed)

Agenda NRCs Annual Assessment Meeting Limerick Generating Station April 18, 2007 Introduction

................................................................................................ NRC (3 minutes)

Review of Reactor Oversight Process............................................................................. NRC (5 minutes)

National Summary of Plant Performance........................................................................... NRC (7 minutes)

Discussion of Limerick Performance............................................................................. NRC (15 minutes)

Exelons Response and Remarks............................................................................. Exelon (30 minutes)

Closing Remarks............................................................................................. NRC (5 minutes)

Short Break..................................................................................................... (5 minutes)

NRC to address public questions............................................................. NRC/Members of the Public (as needed)

Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO H. Chernoff, NRR J. Shea, PM, NRR E. Miller, PM, Backup R. Ennis, NRR J. Lubinski, NRR M. Kowal, NRR M. Gray, DRP R. Fuhrmeister, DRP S. Hansell, DRP - Senior Resident Inspector C. Bickett, DRP - Resident Inspector L. Pinkham - Resident OA J. Lamb, RI OEDO J. Shea, PM, NRR J. Lubinski, NRR M. Kowal, NRR R. Ennis, NRR H. Chernoff, NRR Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: C:\\MyFiles\\Copies\\LGS2007AAMeetingNotice.wpd SUNSI Review Complete: PGK (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME RFuhrmeister PKrown DATE 04/02/07 04/02/07 OFFICIAL RECORD COPY