Closeout of Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
ML070860462
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/14/2007
From: Feintuch K
NRC/NRR/ADRO/DORL/LPLIII-1
To: Vanmiddlesworth G
Duane Arnold
Feintuch K, NRR/DORL/LPL3-1, 415-3079
References
GL-06-003, TAC MD1577
Download: ML070860462 (4)


Text

April 17, 2007 Mr. Gary Van Middlesworth Site Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

DUANE ARNOLD ENERGY CENTER - CLOSEOUT OF RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1577)

Dear Mr. Van Middlesworth:

By "L-2006-118, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Configurations.|letter dated June 9, 2006]], you responded to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation in your "L-2006-118, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Configurations.|June 9, 2006 letter]], you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have also submitted supplemental documentation in a letter dated May 15, 1997, to clarify that another 1 or 3-hour fire barrier material that separates redundant safe shutdown trains located within the same fire area has been designed and installed in accordance with current Nuclear Regulatory Commission (NRC) guidance. Based on your response, the basis for stating that this other fire barrier material has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me.

Sincerely,

/RA/

Karl Feintuch, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: See next page

April 17, 2007 Mr. Gary Van Middlesworth Site Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

DUANE ARNOLD ENERGY CENTER - CLOSEOUT OF RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1577)

Dear Mr. Van Middlesworth:

By "L-2006-118, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Configurations.|letter dated June 9, 2006]], you responded to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation in your "L-2006-118, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Configurations.|June 9, 2006 letter]], you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have also submitted supplemental documentation in a letter dated May 15, 1997, to clarify that another 1 or 3-hour fire barrier material that separates redundant safe shutdown trains located within the same fire area has been designed and installed in accordance with current Nuclear Regulatory Commission (NRC) guidance. Based on your response, the basis for stating that this other fire barrier material has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me.

Sincerely,

/RA/

Karl Feintuch, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: See next page DISTRIBUTION PUBLIC RidsOgcRp LPL3-1 R/F RidsNrrLATHarris RidsNrrPMKFeintuch RidsNrrDorlLPL3-1 DFrumkin RidsAcrsAcnwMailCenter RidsRgn3MailCenter Package Accession No.: ML070860462 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/AFPB/BC NRR/LPL3-1/BC NAME KFeintuch THarris SWeerakkody LRaghavan DATE 04/ /07 04/ /07 04/ /07 04/ /07 OFFICIAL RECORD COPY

Duane Arnold Energy Center cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. M. S. Ross Managing Attorney Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. R. E. Helfrich Senior Attorney Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. W. E. Webster Vice President, Nuclear Operations Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 John Bjorseth Site Director Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 Steven R. Catron Manager, Regulatory Affairs Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 U. S. Nuclear Regulatory Commission Resident Inspectors Office Rural Route #1 Palo, IA 52324 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Mr. M. Warner Vice President, Nuclear Operations Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. D. A. Curtland Plant Manager Duane Arnold Energy Center 3277 DAEC Rd.

Palo, IA 52324-9785 Mr. R. S. Kundalkar Vice President, Nuclear Engineering Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Daniel K. McGhee Iowa Department of Public Health Bureau of Radiological Health 321 East 12th Street Lucas State Office Building, 5th Floor Des Moines, IA 50319-0075 Chairman, Linn County Board of Supervisors 930 1st Street SW Cedar Rapids, IA 52404 Service List Revised: October 12, 2006