Technical Specifications Pages Re Loss of Power Diesel Generator Start Instrumentation
ML070810646
Person / Time
Site: Point Beach, Prairie Island  Xcel Energy icon.png
Issue date: 03/21/2007
From: Milano P
NRC/NRR/ADRO/DORL/LPLIII-1
To:
P. Milano X1457
Shared Package
ML070600580 List:
References
TAC MD0936, TAC MD0937
Download: ML070810646 (3)


Text

LOP DG Start Instrumentation 3.3.4 3.3 INSTRUMENTATION 3.3.4 Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation I

LCO 3.3.4 The following LOP DG Start Instrumentation shall be OPERABLE:

a.

Three channels per bus of the 4.16 kV loss of voltage Function,

b.

Three channels per bus of the 4.16 kV degraded voltage Function, and

c.

Three channels per bus of the 480 V loss of voltage Function.

APPLICABILITY:

MODES 1, 2, 3, and 4, When associated DG is required to be OPERABLE by LCO 3.8.2, "AC Sources -Shutdown."

ACTIONS NOTE Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more Functions A.1 Place channel in trip.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one channel per bus inoperable.

B.

Two or more 4.16 kV B.1 Restore all but one 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> loss of voltage or channel to OPERABLE 4.16 kV degraded status.

voltage channels per bus inoperable.

(continued)

Point Beach 3.3.4-1 Unit 1 - Amendment No. 225 Unit 2 - Amendment No. 231

LOP DG Start Instrumentation 3.3.4 I ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Required Action and C.1 Enter applicable Immediately associated Completion Condition(s) and Time of Condition A for Required Action(s) for 4.16 kV Functions or the associated standby Condition B not met.

emergency power source made inoperable by LOP DG start instrumentation.

D.

Two or more 480 V loss D.1 Restore all but one 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of voltage channels per channel to OPERABLE bus inoperable, status.

E.

Required Action and E.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A for AND 480 V loss of voltage Function or Condition D E.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.4.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> S R 3.3.4.2 Perform TADOT.

31 days (continued)

Unit 1 - Amendment No. 225 Unit 2 - Amendment No. 231 Point Beach 3.3.4-2

LOP DG Start and Load Sequence Instrumentation 3.3.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.4.3 Perform CHANNEL CALIBRATION with Allowable Value as follows:

a.

4.16 kV loss of voltage Allowable Value

> 3156 V with a time delay of > 0.7 seconds and < 1.0 second..

b.

4.16 kV degraded voltage Allowable Value a 3937 V with a time delay of

< 5.68 seconds (bus degraded voltage relay) and

< 39.14 seconds (bus time delay relay)

c.

480 V loss of voltage Allowable Value 256 V +/- 3% with a time delay of < 0.5 seconds.

18 months Point Beach 3.3.4-3 Unit 1 - Amendment No. 225 Unit 2 - Amendment No. 231