ML070720570
| ML070720570 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 02/12/2007 |
| From: | Fitzgerald D AmerenUE, Union Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-5369 | |
| Download: ML070720570 (6) | |
Text
AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 February 12, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC-5369 wAmeivii VIA Ladies and Gentlemen:
DOCKETNUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 Semi-Annual Fitness for Duty Program Performance Data Report for AmerenUE Callaway Plant Enclosed is the Semi-Annual Fitness For Duty Program Performance Data Report for AmerenUE's Callaway Nuclear Plant in accordance with 10CFR26.71(d). This report applies to the period beginning July 1, 2006 and ending December 31, 2006.
The enclosure includes the following:
Attachment A - Fitness For Duty Program Performance Data
" Personnel Subject to 10CFR26
- Breakdown of Confirmed Positive Tests for Specific Substances Attachment B - Fitness For Duty Management Action with regard to:
- Initiatives Taken / Lessons Learned
- ReportableFitness ForDutyEvents under O
.CFR26.73 If you have questions in regard to the Performance Data Report, please contact me at (573) 676-8763.
Sincerely, David T. Fitzgerald Manager, Regulatory Affairs DTF: LHG: KRF: AEE/rmm Enclosure A:DI I
i i a
subsidiary ofAmeren Corporation a subsidiary otAmeron Corporation Ii~
ULNRC-5369 February 12, 2007 Page 2 cc:
Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-7D1 -
Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360
ULNRC-5317 July 28, 2006 Page 3 bcc:
C. D. Naslund A. C. Heflin D. T. Fitzgerald G. A. Hughes D. E. Shafer S. L. Gallagher (100)
L. M. Belsky (NSRB)
K. A. Mills P. M. Bell A160.0761 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and public disclosed).
Send the following without attachments:
Ms. Diane M. Hooper Supervisor, Licensing WCNOC P.O. Box 411 Burlington, KS 66839 Mr. Scott Bauer Regulatory Affairs Palo Verde NGS P.O. Box 52034, Mail Station 7636 Phoenix, AZ 85072-2034 Mr. Scott Head Supervisor, Licensing South Texas Project NOC Mail Code N5014 P.O. Box 289 Wadsworth, TX 77483 Mr. Dennis Buschbaum TXU Power Comanche Peak SES P.O. Box 1002 Glen Rose, TX 76043 Mr. Stan Ketelsen Manager, Regulatory Services Pacific Gas & Electric Mail Stop 104/5/536 P.O. Box 56 Avila Beach, CA 93424 Mr. John O'Neill Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street N.W.
Washington, DC 20037 IAI
ULNRC-5369 February 12, 2007 Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92)
AmerenUE July 1 - December 31, 2006 Company 6 Months Callaway Plant Location Aaron Enloe.
(573) 676-4300 Contact Name Phone (Include Area Code)
ED Appendix A to 10CFR26 Cuttoffs: Screen/Confirmation (ng/ml)
Marijuana Cocaine Opiates 20/
15 300/150 300/150 Amphetamines Phencyclidine Alcohol 1000/ 250 25/
25
(.04% BAC)
Long-Term Short-Term Testing Results Licensee Employees Contractor-Personnel Contractor-Personnel Average Number with Unescorted Access 860 212 94 Categories Tested Positive Tested Positive Tested Positive Pre-Access 70 0
0 0
205 5
Post Accident 2
0 0
0 2
0 Observed Behavior 2
0 1
0 0
0 Random 224 0
61 0
26 0
Follow-up 4
0 0
0 7
0 Other 8
0 1
0 5
0 Total 310 0
63 0
245 5
Attachment A Page 1 of 2
ULNRC-5369 February 12, 2007 Breakdown of Confirmed Positive Tests for Specific Substances 9-Mariijuana
'Cocaine
- Opiates"
- ~Am~phetamines Phencyclidine Alcohol:
Refusalto Test, Licensee 0
0 0
0 0
0 0
0 0
Employees Longerm0 0
0 0
0 0
0 0
0
'Cofitractor1s, SotTr 3
0 0
0 110 10 Contractors 3
0 0
1 0
1 0
'TOTAL
- Left Side Right Side Record of test results that would have been Positive at the NRC cutoff level.
Record of MRO confirmed positives based on Union Electric's more stringent cutoff level.
Attachment A Page 2 of 2
ULNRC-5369 February 12, 2007 Initiatives Taken:
Breath Analysis equipment was upgraded to the Intoxilyzer 8000 during this reporting period.
Reportable Fitness For Duty Events Under 10CFR26.73:
There were no reportable Fitness for Duty events during this reporting period.
Test Results:
Ameren UE Callaway Nuclear Plant performs random testing of the workforce at an annual rate of at least 50% in accordance with 10CFR26.24.a.2. For the six months beginning July 1, 2006 and ending December 31, 2006 random screens were performed at a rate of 26.7% of the population.
Attachment B Page I of 1