Er 05000458-07-301 - River Bend Station - NRC Initial Operator Licensing Examination Corporate Letter
ML070660210
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/02/2007
From: Gody A
Operations Branch IV
To: Venable J
Entergy Operations
References
ER-07-301
Download: ML070660210 (5)


See also: IR 05000458/2007301

Text

March 2, 2007

Joseph E. Venable

Vice President - Operations

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NRC INITIAL OPERATOR LICENSING

EXAMINATION 05000458/2007301

Dear Mr. Venable:

In a telephone conversation on January 24, 2007, between Messrs. Mike Murphy, Chief

Examiner, and Mike Wagner, Classroom Training Coordinator, arrangements were made for

the administration of licensing examinations at your River Bend Station during the week of

June 11, 2007.

As agreed during several telephone conversations between Messrs. Steve Garchow, Gabriel

Apger and members of your staff, the NRC will prepare the written examinations, one scenario,

the job performance measures outlines and one half of the job performance measures. Your

staff will prepare the remaining scenarios and job performance measures based on the

guidelines in Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." The NRC regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by March 28, 2007. The remaining outlines, scenarios and job performance measures,

and the supporting reference materials identified in Attachment 2 of ES-201 and as specified by

the Chief Examiner will be due by April 27, 2007. Pursuant to 10 CFR 55.40(b)(3), an

authorized representative of the facility licensee shall approve the outlines, examinations, and

tests before they are submitted to the NRC for review and approval. All materials shall be

complete and ready-to-use. Any delay in receiving the required examination and reference

materials, or the submittal of inadequate or incomplete materials, may cause the examinations

to be rescheduled. Additionally, an onsite validation of the examination material will be

performed during the week of May 28, 2007. Sufficient staff resources and the simulator

should be made available for the examination validation.

Entergy Operations, Inc.

-2-

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402 and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior operator license applications (Office of Management and Budget (OMB)

approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and

waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date, or no later than May 12, 2007. If the applications are not received at least

30 days before the examination date, a postponement may be necessary. Signed applications

certifying that all training has been completed should be submitted at least 14 days before the

first examination date or no later than May 28, 2007.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2009. The

public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-001, or by Internet electronic

mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory

Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC

20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, its

enclosures, and your response will be available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Record (PARS) component of the NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Entergy Operations, Inc.

-3-

Thank you for your cooperation in this matter. Mr. Wagner has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Mike Murphy at 817-860-8160, or

myself at 817-860-8159.

Sincerely,

/RA/

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-458

License: NPF-47

cc:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

General Manager

Plant Operations

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Director, Nuclear Safety & Licensing

Entergy Operations, Inc.

1340 Echelon Parkway

Jackson, MS 39213-8298

Manager, Licensing

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Entergy Operations, Inc.

-4-

The Honorable Charles C. Foti, Jr.

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94095

Baton Rouge, LA 70804-9005

H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, LA 70806

Bert Babers, President

West Feliciana Parish Police Jury

P.O. Box 1921

St. Francisville, LA 70775

Richard Penrod, Senior Environmental

Scientist, State Liaison Officer

Office of Environmental Services

Northwestern State University

Russell Hall, Room 201

Natchitoches, LA 71497

Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

1701 North Congress Avenue

Austin, TX 78701-3326

Jim Calloway

Public Utility Commission of Texas

1701 N. Congress Avenue

Austin, TX 78711-3326

Entergy Operations, Inc.

-5-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (PJA)

Branch Chief, DRP/C (MCH2)

Senior Project Engineer, DRP/C (WCW)

Team Leader, DRP/TSS (FLB2)

RITS Coordinator (MSH3)

SUNSI Review Completed: ____Y____ ADAMS: /YesG No Initials: _lmb_____

/ Publicly Available G Non-Publicly Available

G Sensitive

/ Non-Sensitive

C:\\FileNet\\ML070660210.wpd

SOE:OB

C:OB

MEMurphy/lmb

ATGody

/RA/

/RA/

3/1/07

3/2/07

OFFICIAL RECORD COPY