MONTHYEARML0624304712006-08-31031 August 2006 Review of Perry Amendment Request to Revise Technical Specifications 3.8.1.2, 3.8.1.7, 3.8.1.12, 3.8.1.15 and 3.8.1.20 Project stage: Approval ML0634201382007-01-0909 January 2007 RAI Related to Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits Project stage: RAI ML0706503352007-02-22022 February 2007 Response to Request for Additional Information Regarding License Amendment Request Related to Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits Project stage: Response to RAI ML0712005032007-04-30030 April 2007 Tech Spec Pages for Amendment 142 Regarding Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits Project stage: Other ML0709600472007-04-30030 April 2007 Issuance of License Amendment 142 Regarding Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits Project stage: Approval 2007-01-09
[Table View] |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] |
Text
FENOC Oft"%C395 Ghent Road FirstEnergyNuclearOperating Company Akron, Ohio 44333 February 22, 2007 PY-CEI/NRR-3015L 10 CFR 50.90 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Perry Nuclear Power Plant Docket No. 50-440
Subject:
Response to Request for Additional Information Regarding License Amendment Request Related to Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits (TAC No. MC8997)
This letter provides a response to the Nuclear Regulatory Commission (NRC) Request for Additional Information dated January 9, 2007, pertaining to the FirstEnergy Nuclear Operating Company (FENOC) Perry Nuclear Power Plant License Amendment Request submitted on November 21, 2005 (PY-CEI/NRR-2918L). The proposed amendment would revise Technical Specification (TS) Surveillance Requirements associated with TS 3.8.1 to modify the acceptance criteria for Emergency Diesel Generator start test requirements to provide minimum voltage and frequency limits and to clarify other limits as steady state parameters. This change implements the provisions of Technical Specification Task Force (TSTF) Traveler 163, Revision 2.
There are no regulatory commitments contained in this letter or its attachment. If there are any questions or if additional information is required, please contact Mr. Henry L. Hegrat, Supervisor - FENOC Fleet Licensing, at 330-315-6944.
I declare under penalty of perjury that the foregoing is true and correct. Executed on February 22, 2007.
Lamar W. Pearce Vice President-Nuclear
Attachment:
"Response To Request For Additional Information cc: NRC Project Manager NRC Resident Inspector NRC Region III State of Ohio
PY-CEI/NRR-3015L Attachment Page 1 of 3 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION The following Nuclear Regulatory Commission (NRC) Request for Additional Information (RAI) was received by letter dated January 9, 2007, regarding the license amendment request submitted for the Perry Nuclear Plant (PNPP) on November 21, 2005 (PY-CEI/NRR-2918L).
The proposed amendment would revise Technical Specification (TS) Surveillance Requirements (SRs) associated with TS 3.8.1 to modify the acceptance criteria for Emergency Diesel Generator (EDG) start tests to provide minimum voltage and frequency limits and to clarify other limits as steady state parameters. This change implements the provisions of Technical Specification Task Force (TSTF) Traveler 163, Revision 2. The NRC RAI and the corresponding response are provided below.
NRC REQUEST In reviewing FirstEnergy Nuclear Operating Company's (FENOC's) submittal dated November 21, 2005, related to Emergency Diesel Generator (EDG) Surveillance Testing Voltage and Frequency Limits, for the Perry Nuclear Power Plant, Unit I (Perry), the NRC staff has determined that the following information is needed in order to complete its review:
While reviewing the submittal, NRC staff noted that the proposed change to Surveillance Requirement (SR) 3.8.1.2 was not one of the changes included in Technical Specification Task Force Traveler (TSTF) 163. During the review of the proposed change to SR 3.8.1.2, the NRC staff noticed that Note 3 to this SR is incomplete and is not consistent with the similar Note 2 of SR 3.8.1.2 of the Improved Standard Technical Specifications (ISTS). That is, the last sentence of the note, which states that "when modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met," is missing.
The purpose of the second part of the note in the ISTS is to ensure that, when the modified start procedure is not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 are demonstrated during the monthly testing. The change requested to SR 3.8.1.2, in this license amendment request, taken with the existing note, presents concerns to the NRC staff.
With respect to the above, describe how Perry conducts its monthly EDG testing. If a "modified start" test procedure is not used for this testing, explain how the testing and acceptance criteria demonstrates compliance with the requirements of 10 CFR 50.36 and support the applicable facility safety analyses.
RESPONSE
SR 3.8.1.2 of the current PNPP TS requires the EDG to be started from a standby condition every 31 days to achieve a voltage between 3900 Volts and 4400 Volts, and a frequency between 58.8 Hertz and 61.2 Hertz, with no required time limits.
SR 3.8.1.7.a of the current PNPP TS requires the Division 1 and 2 EDGs to be started from a standby condition every 184 days to achieve a voltage between 3900 Volts and 4400 Volts, and a frequency between 58.8 Hertz and 61.2 Hertz, in less than or equal to 10 seconds.
W,. 'I -
PY-CEI/NRR-3015L Attachment Page 2 of 3 In addition, SR 3.8.1.7.b verifies that when started from a standby condition, the Division 3 EDG achieves a frequency of at least 58.8 Hertz in less than or equal to 10 seconds, and a voltage between 3900 Volts and 4400 Volts and a frequency between 58.8 Hertz and 61.2 Hz in less than or equal to 13 seconds.
As stated in the TS Bases for 3.8.1.2, the capability to limit the starting speed of the EDGs (modified start), is not currently available on the PNPP EDGs. Therefore, fast starts are performed on the EDGs for both the 31-day and 184-day Surveillance requirements. In the near future, the PNPP staff plans to incorporate a design modification to the EDGs that will allow the capability to conduct modified starts.
The following PNPP Surveillance Instructions (SVIs) satisfy the EDG start and load tests for both SR 3.8.1.2 and 3.8.1.7:
- SVI-E22-T1317, "Diesel Generator Start And Load Division 1"
" SVI-E22-T1 318, "Diesel Generator Start And Load Division 2"
" SVI-E22-T1319, "Diesel Generator Start And Load Division 3" The acceptance criterion (Section 5.3) in the above SVIs requires each EDG to start and achieve the required voltage and frequency within the above time requirements after the start signal from standby conditions. In addition, PNPP administrative procedure PAP-1705, "Diesel Generator Reports and Records," requires recording and evaluating the time to reach proper speed and voltage for all EDG starts. The data recorded via this procedure supports trend analysis of EDG start and run performance.
Whenever a normal fast start is performed, the design basis time limits specified in SR 3.8.1.7 are applicable. Anytime it is known that a TS SR's requirements are not met, the associated TS equipment is considered to be inoperable. This is explained in the TS Bases for SR 3.0.1, which state:
"Systems and components are assumed to be OPERABLE when the associated SRs have been met. Nothing in this Specification, however, is to be construed as implying that systems or components are OPERABLE when:
- a. The systems or components are known to be inoperable, although still meeting the SRs; or
- b. The requirements of the Surveillance(s) are known to be not met between required Surveillance performances. [emphasis added]"
In accordance with this guidance, although the design basis time limits are not specifically addressed in SR 3.8.1.2, the acceptance criteria of SR 3.8.1.7 are always applicable when performing EDG start Surveillances if a modified start is not being performed. There is no benefit to modifying the NOTE in SR 3.8.1.2, since the existing PNPP TS SRs assure that applicable Limiting Conditions for Operation are met.
During the development of the Improved Technical Specifications for the PNPP, the last sentence of the NOTE to SR 3.8.1.2 was not included, because the requirement to meet start time criteria is effectively established by SR 3.8.1.7. The proposed changes to SRs 3.8.1.2 and 3.8.1.7 are not affected by the presence or absence of the subject portion of the Note.
As required by 10 CFR 50.36 (b), the PNPP Operating License includes Technical Specification Surveillance Requirements. The PNPP SR testing and acceptance criteria for
PY-CEI/NRR-3015L Attachment Page 3 of 3 the EDGs demonstrate compliance with the EDG start time requirements that are assumed for the Design Basis Accidents addressed in Chapters 6 and 15 of the PNPP Updated Safety Analysis Report. The EDG start time testing criteria required per the existing PNPP TS SRs and as proposed by the amendment submitted on November 21, 2005, equally support the applicable facility safety analyses. With the implementation of the proposed amendment, the PNPP TS SRs will continue to assure that the EDGs are maintained within safety limits and that the applicable Limiting Conditions for Operation are met as specified within 10 CFR 50.36 (c)(3).