Consumers Energýy A CMS Energy Company Kurt M. Haas General Manager October 27, 2006 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 DOCKETS 50-155 AND 72-043 - LICENSE DPR BIG ROCK POINT PLANT -

TRANSMITTAL OF SURVEY PACKAGES IN SUPPORT OF BIG ROCK POINT PHASED LICENSE TERMINATION

References:

1. Big Rock Point to U.S. NRC dated October 24, 2006, Transmittal of Survey Packages in support of big Rock Point Phased License Termination contains a matrix of Final status Survey (FSS) record numbers, survey area descriptions, and review status. This attachment is a revision to attachment of our letter dated October 24, 2006. It contains a list of the final status survey release records expected to be submitted in support of our FSS report. This FSS report is expected to be submitted on or around the fifteenth of November. Also attached, are the following survey release records:

CLASS 1 FINAL STATUS SURVEY RELEASE RECORDS

  • South East Protected Area (Attachment 2)
  • East Central Protected Area (Attachment 3)
  • East Protected Area (Attachment 4)
  • North Radwaste Staging Area (Attachment 5)

These records are being provided to facilitate U.S. Nuclear Regulatory Commission review, as discussed in our April 12, 2006 meeting. Attachments 2, 3, 4 and 5 to this letter comprise those portions of survey packages which may be of use for final review and will be summarized in our FSS report.

The phased release approach is described in Sections 1.4.2 and 5.1.2 of the BRP License Termination Plant (LTP). BRP intends to release site land from the 10 CFR Part 50 license using this phased approach. The first phase includes the majority of the site land scheduled for release after all demolition, remediation and FSS activities associated with plant operation are complete.

Big Rock Point Restoration Project

  • 10269 US-31 North
  • Charlevoix, MI 49720 - wwvw.consumersenergy.com

BRP LTP Chapter 5 commits BRP to producing FSS package(s) for each survey area and outlines the contents of each supporting survey package.

The intended partial site release supports the process of license termination by demonstrating that an additional portion of the remaining site lands can be released from the Site license. This letter, along with completed and future on-site inspections and letters, provides documentation that demolition activities have been performed in accordance with the LTP.

Your timely review of FSS information and approval of our request to release the associated land is particularly important to the project and smooth transition to an Independent Spent Fuel Storage Installation (ISFSI)-only operation.

If you have any questions or comments on these reports, please contact Ken Pallagi, Radiation Protection and Environmental Services Manager at 231-547-8416.

Kurt M. Haas Site General Manager ATTACHMENTS cc:

Administrator, Region III, USNRC (w/o Attachments)

NRC Decommissioning Inspector, big Rock Point (w/o Attachments)

NRC NMSS Project Manager, James Shepherd (w/o Attachments)

NRC NMSS FSS Reviewer, Bruce Watson Michigan Department of Environmental Quality, Thor Strong (w/o Attachments) 2