ML070600588

From kanterella
Jump to navigation Jump to search
Report 22, Inspection/Activity Plan 03/01/2007 - 09/30/2008
ML070600588
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 03/01/2007
From:
Reactor Projects Region 2 Branch 6
To:
Tennessee Valley Authority
Shared Package
ML070600581 List:
References
Download: ML070600588 (2)


Text

Watts Bar Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 14:54:55 Report 22 7

EB1-CDBI

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 02/26/2007 03/02/2007 1

7111121 IP Component Design Bases Inspection Baseline Inspections 03/05/2007 03/09/2007 1

7111121 IP Component Design Bases Inspection 1

PSB1-RP

- RP PRE-INSPECTION VISIT Baseline Inspections 04/24/2007 04/26/2007 1

7112101 IP Access Control to Radiologically Significant Areas 4

TFP

- TFP INFO TRIP Baseline Inspections 05/08/2007 05/10/2007 1

7111105T IP Fire Protection [Triennial]

3 PSB1-RP

- RP OCCUPATIONAL BASELINE INSPECTION Baseline Inspections 05/21/2007 05/25/2007 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/21/2007 05/25/2007 1

7112102 IP ALARA Planning and Controls Baseline Inspections 05/21/2007 05/25/2007 1

7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/21/2007 05/25/2007 1

71151 IP Performance Indicator Verification 4

TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 05/28/2007 06/01/2007 1

7111105T IP Fire Protection [Triennial]

Baseline Inspections 06/11/2007 06/15/2007 1

7111105T IP Fire Protection [Triennial]

2 EB3-HS

- HEAT SINK Baseline Inspections 06/25/2007 06/29/2007 1

7111107B IP Heat Sink Performance 4

RPB6-PIR

- BIENNIAL PI&R INSPECTION Baseline Inspections 08/27/2007 08/31/2007 1

71152B IP Identification and Resolution of Problems Baseline Inspections 09/10/2007 09/14/2007 1

71152B IP Identification and Resolution of Problems 3

EB1-MODS

- MODIFICATIONS-10CFR50.59 Baseline Inspections 10/29/2007 11/02/2007 1

7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 10/29/2007 11/02/2007 1

7111117B IP Permanent Plant Modifications 2

PSB1-EP

- EP EXERCISE Baseline Inspections 11/05/2007 11/09/2007 1

7111401 IP Exercise Evaluation Baseline Inspections 11/05/2007 11/09/2007 1

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 11/05/2007 11/09/2007 1

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 11/05/2007 11/09/2007 1

71151-EP02 IP ERO Drill Participation Baseline Inspections 11/05/2007 11/09/2007 1

71151-EP03 IP Alert & Notification System 1

EB3-ME

- MAINTENANCE EFFECTIVENESS Baseline Inspections 12/10/2007 12/14/2007 1

7111112B IP Maintenance Effectiveness 3

OL PREP

- INITIAL EXAM PREP Not Applicable 01/07/2008 01/11/2008 1

V23277 WATTS BAR/JANUARY 2008 EXAM AT POWER FACILITIES 1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 01/07/2008 01/11/2008 1

7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ML070600588

Watts Bar Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 14:54:55 Report 22 2

OL EXAM

- INITIAL EXAM Not Applicable 01/28/2008 02/08/2008 1

V23277 WATTS BAR/JANUARY 2008 EXAM AT POWER FACILITIES 4

PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections 02/11/2008 02/15/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/11/2008 02/15/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 02/11/2008 02/15/2008 1

7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/11/2008 02/15/2008 1

71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 02/11/2008 02/15/2008 1

71151-PR01 IP RETS/ODCM Radiological Effluent 1

EB3-ISI

- UNIT 1 - ISI Baseline Inspections 02/18/2008 02/22/2008 1

7111108P IP Inservice Inspection Activities - PWR 1

EB3RPV

- REACTOR HEAD PENETRATIONS TI150 Safety Issues 02/18/2008 02/22/2008 1

2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 2 PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections 02/25/2008 02/29/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/25/2008 02/29/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 02/25/2008 02/29/2008 1

7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/25/2008 02/29/2008 1

71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 02/25/2008 02/29/2008 1

71151-PR01 IP RETS/ODCM Radiological Effluent 1

PSB1-EP

- EP INSP Baseline Inspections 08/25/2008 08/29/2008 1

7111402 IP Alert and Notification System Testing Baseline Inspections 08/25/2008 08/29/2008 1

7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/25/2008 08/29/2008 1

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/25/2008 08/29/2008 1

7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/25/2008 08/29/2008 1

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/25/2008 08/29/2008 1

71151-EP02 IP ERO Drill Participation Baseline Inspections 08/25/2008 08/29/2008 1

71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.