IR 05000280/2007001

From kanterella
(Redirected from ML070600379)
Jump to navigation Jump to search
Annual Assmt. Ltr - Surry, IR 05000280-07-001 and 05000281-07-001
ML070600379
Person / Time
Site: Surry, 07200002, 07200055  Dominion icon.png
Issue date: 03/01/2007
From: Casto C
Division Reactor Projects II
To: Christian D
Virginia Electric & Power Co (VEPCO)
Shared Package
ML070600375 List:
References
IR-07-001
Download: ML070600379 (5)


Text

rch 1, 2007

SUBJECT:

ANNUAL ASSESSMENT LETTER - SURRY POWER STATION (NRC INSPECTION REPORT 05000280/2007001 AND 05000281/2007001)

Dear Mr. Christian:

On February 8, 2007, the NRC technical staff completed its performance review of the Surry Power Station for the period from January 1 through December 31, 2006. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Overall, Surry Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as the previous three quarters, was within the Regulatory Response column of the NRCs Action Matrix, based on a White inspection finding in the Emergency Preparedness Cornerstone. The White inspection finding involved the licensees drill critique not identifying that the proper emergency action level was not entered during a full scale exercise. The White finding was identified in the first quarter of calendar year 2006. The NRC conducted a Supplemental Inspection Procedure 95001, Inspection for One or Two White Inputs In a Strategic Performance, in the Emergency Preparedness Cornerstone on November 15, 2006.

Supplemental Inspection Report Nos. 05000280/2006502 and 05000281/2006502 documents no findings of significance were identified and the violation associated with the White finding was considered closed. Therefore, we plan to conduct reactor oversight process (ROP)

baseline inspections at your facility. We also plan on conducting non-ROP inspections of the independent spent fuel storage facility and containment emergency recirculation sump blockage modifications. Additionally, initial reactor operator licensing examinations are scheduled.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and

VEPCO 2 personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Guthrie at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Charles A. Casto, Director Division of Reactor Projects Docket No.: 50-280, 50-281,72-002, 72-055 Licensee No.: DPR-32, DPR-37, SNM-2501 Enclosure: Surry Inspection / Activity Plan cc w/encl: (See page 3)

_________________________

OFFICE RII:DRP RII:DRP SIGNATURE LXG1 GXG NAME LGarner:rcm EGuthrie DATE 03/01/2007 03/01/2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

VEPCO 3 cc w/encl:

Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric & Power Company Electronic Mail Distribution Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, VA 23209 Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Electronic Mail Distribution Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219

VEPCO 4 Letter to David from Charles A. Casto dated March 1, 2007 SUBJECT: ANNUAL ASSESSMENT LETTER - SURRY POWER STATION (NRC INSPECTION REPORT 05000280/2007001 AND 05000281/2007001 S. P. Lingam, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

RIDSNRRDIRS RIDSNRRDIRSIPAB INPO PUBLIC