ML070600135

From kanterella
Jump to navigation Jump to search
Inspection / Activity Plan 03/01/2007 - 09/30/2008
ML070600135
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/01/2007
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML070600127 List:
References
IR-07-001
Download: ML070600135 (2)


Text

Page 1 of 2 Saint Lucie 03/01/2007 07:51:05 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-MODS - MODIFICATIONS/10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/26/2007 03/02/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 02/26/2007 03/02/2007 Baseline Inspections 60853 - ISFSI CONSTRUCTION 2 1 IP 60854 Preoperational Testing Of An ISFSI 03/19/2007 03/23/2007 Other Routine EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/09/2007 04/13/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/09/2007 04/13/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/09/2007 04/13/2007 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 2 1 IP 7111108P Inservice Inspection Activities - PWR 04/16/2007 04/20/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1, 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 04/23/2007 04/27/2007 Safety Issues EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP 7111121 Component Design Bases Inspection 08/13/2007 08/17/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 08/27/2007 08/31/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 09/24/2007 09/28/2007 Baseline Inspections OL RQ - LICENSED OPERATOR REQUAL INSPECTION 3 1, 2 IP 7111111B Licensed Operator Requalification Program 08/27/2007 08/31/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/03/2007 09/05/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/22/2007 10/26/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASLINE INSP WK 1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/22/2007 10/26/2007 Baseline Inspections EB3SGRP - STEAM GENERATOR REPLACEMENT 7 2 IP 50001 Steam Generator Replacement Inspection 10/29/2007 11/02/2007 Other Routine 2 IP 50001 Steam Generator Replacement Inspection 11/26/2007 11/30/2007 Other Routine 2 IP 50001 Steam Generator Replacement Inspection 12/17/2007 12/21/2007 Other Routine This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Saint Lucie 03/01/2007 07:51:05 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3HEAD - REACTOR HEAD REPLACEMENT 1 2 IP 71007 Reactor Vessel Head Replacement Inspection 11/05/2007 11/09/2007 Other Routine PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK 2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/12/2007 11/16/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/12/2007 11/16/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 11/12/2007 11/16/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/12/2007 11/16/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 12/17/2007 12/21/2007 Safety Issues PSB1-EP - EP EXERCISE 2 1, 2 IP 7111401 Exercise Evaluation 02/18/2008 02/22/2008 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/18/2008 02/22/2008 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 02/18/2008 02/22/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 02/18/2008 02/22/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 02/18/2008 02/22/2008 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 06/30/2008 07/03/2008 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 07/21/2008 08/01/2008 Not Applicable PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/11/2008 08/15/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.