10 CFR Part 26, Fitness for Duty Programs for Six Month Period of July 1, 2006 to December 31, 2006
ML070590247
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/15/2007
From: Peifer M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:7071
Download: ML070590247 (3)


Text

Indiana Michigan Power INDIANA Cook Nuclear Plant MICHIGAN One Cook Place Bridgman, Ml 49106 POWER0 AEPcom A unit of American Electric Power February 15, 2007 AEP:NRC:7071 10 CFR 26.7 1(d)

Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units I and 2 10 CFR PART 26, FITNESS FOR DUTY PROGRAMS In accordance with 10 CFR 26.71(d), Indiana Michigan Power Company hereby submits Fitness for Duty Program performance data for the six-month period of July 1, 2006, to December 31, 2006.

Attached are the performance data sheets that include statistics on the various categories of testing, substances for which testing is conducted, random testing rate, and a summary of management actions.

This letter contains no new commitments. Should you have any questions, please contact Ms. Susan D. Simpson, Regulatory Affairs Manager, at (269) 466-2428.

Site Support Services Vice President RBH/rdw Attachment c: J. L. Caldwell, NRC Region III K. D. Curry, AEP Ft. Wayne J. T. King, MPSC MDEQ - WHMD/RPMWS NRC Resident Inspector P. S. Tam, NRC Washington, DC 4ADf

Attachment to AEP:NRC:7071 Page I FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Indiana Michigan Power Co. 12/31/06 Company 6 Month Ending Cook Nuclear Plant, Bridgman, Michigan Location Jim Bradshaw (269) 466-3335 Contact Name Phone Cutoffs: Screen/Confirmation (ng/ml) 0 Appendix A to IOCFR26 Marijuana 50/15 Amphetamine 1000/500 N/A N/A Cocaine 300/150 Phencyclidine 25/25 N/A N/A Opiates 300/300 Alcohol (%BAC) 0.04% N/A N/A Testing Results Licensee Long-Term Short-Term Employees Contractor Contractor Personnel Personnel Average Number with 1085 164 737 Unescorted Access Caeois# # # # # #

Categories Tested Positive Tested Positive Tested Positive Pre-Access 32 1 2 0 1574 24 For-Cause 5 0 1 0 17 0 Post Accident For-Cause 0 0 3 1 2 1 Observed Behavior Random 325 0 55 0 158 1 Follow-Up 23 1 0 0 41 0 Other I I 1 1 3 3 Total 386 3 62 2 1795 29

Attachment to AEP:NRC:7071 Page 2 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Amphetamines Phencyclidene Alcohol Refusal Marijuana Adulterated 50 100 To Test Suspect Specimen ng/ml ng/ml Specimen Licensee 0 0 0 0 0 0 3 0 0 0 Employee Long-Term 0 0 0 0 0 0 2 0 0 0 Contractors Short-Term 6 5 6 0 0 0 9 0 5 0 Contractors Total 6 5 6 0 0 0 14 0 5 0 Total Confirmed Positive Tests For All Specific Substances, Refusals to Test, and Aduilterated Specimens: 36 A total of 36 positive tests were reported as positive on the "Breakdown of Confirmed Positive Tests for Specific Substances." The differences in test results between Page 1 and Page 2 of the Performance Data Summary is due to two specimens being reported positive for two separate substances. In addition, 5 of the positive alcohol tests were confirmatory blood serum tests. These are indicated as "Other" Linder testing results.

MANAGEMENT ACTIONS:

None.

APPEALS:

Four appeals were received during this reporting period; in these appeals the denials were upheld.

EVENTS:

There were no events identified as 24-hour reportable in accordance with 10 CFR 26.73 during this reporting period.

TEMPORARY SUSPENSIONS:

No temporary suspensions or administrative actions were taken against individuals based on on-site presumptive positive drug results.

TESTING RATE:

The random testing rate for the second half of 2006 was 54% of the half-year average total population. The random testing rate for the year of 2006 was 58%, based on an average testing pool population of 1870 individuals.