ML070510644

From kanterella
Jump to navigation Jump to search
Notice of Forthcoming Category 2 Public Meeting with the Nuclear Energy Institute (NEI) Implications of Wolf Creek Dissimilar Metal Weld Inspections
ML070510644
Person / Time
Site: Wolf Creek, Nuclear Energy Institute, PROJ0669  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/22/2007
From: Tanya Mensah
NRC/NRR/ADRA/DPR/PSPB
To: Rosenberg S
NRC/NRR/ADRA/DPR/PSPB
Mensah T
References
Download: ML070510644 (7)


Text

February 22, 2007 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:

Tanya M. Mensah, Senior Project Manager /RA/

Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING CATEGORY 2 PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) RE: IMPLICATIONS OF WOLF CREEK DISSIMILAR METAL WELD INSPECTIONS DATE, TIME:

Wednesday, March 7, 2007 1:00 p.m. - 4:00 p.m.

LOCATION:

Bethesda North Marriott Hotel and Conference Center 5701 Marinelli Road North Bethesda, Maryland 20852 PURPOSE:

The purpose of the meeting is for the industry representatives to present its plans for performing advanced finite element fracture mechanics analyses and for the NRC staff to provide any comments or concerns on those plans to industry. The industry advanced analyses pertain to the behavior of potential circumferential cracks in pressurizer nozzle dissimilar metal butt welds.

CATEGORY 2*:

This is a Category 2 meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Regulatory Research (RES).

NRC INDUSTRY J. Grobe, NRR A. Marion, NEI M. Evans, NRR J. Riley, NEI W. Bateman, NRR M. Robinson, Duke Energy E. Sullivan, NRR C. King, Electric Power Research Institute (EPRI)

T. Chan, NRR C. Harrington, EPRI K. Gruss, NRR D. Covill, Progress Energy T. Lupold, NRR G. White, Dominion Engineering R. Hardies, RES T. Mensah, NRR Project Nos. 669 and 689

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACT: Tanya M. Mensah, NRR 301-415-3610 tme@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Regulatory Research (RES).

NRC INDUSTRY J. Grobe, NRR A. Marion, NEI M. Evans, NRR J. Riley, NEI W. Bateman, NRR M. Robinson, Duke Energy E. Sullivan, NRR C. King, Electric Power Research Institute (EPRI)

T. Chan, NRR C. Harrington, EPRI K. Gruss, NRR D. Covill, Progress Energy T. Lupold, NRR G. White, Dominion Engineering R. Hardies, RES T. Mensah, NRR Project Nos. 669 and 689

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACT: Tanya M. Mensah, NRR 301-415-3610 tme@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002.

ADAMS ACCESSION NO.: ML070510644 NRC-001 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME TMensah DBaxley SRosenberg DATE 2/ 22 /07 2/ 21 /07 2/ 22 /07 OFFICIAL RECORD COPY

DISTRIBUTION FOR FORTHCOMING CATEGORY 2 PUBLIC MEETING WITH NEI ON MARCH 5, 2007 Date: February 22, 2007 PUBLIC PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsOpaMail MMurphy RidsNrrDciCpnb ESullivan JGrobe MEvans WBateman TChan TLupold RHardies MKhanna ACsantos SSheng PMNS RJasinski RidsOgcMailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)

RidsNrrDe

March 7, 2007, Public Meeting Agenda

Introductions

NRC Project Manager Opening Remarks NRC and Industry Overview of proposed analyses Industry Presentation of Detailed Project Plan Industry Presentation of Comments On Proposed Analyses NRC Caucus NRC Address Public Questions/Comments NRC Conclusions NEI and NRC ENCLOSURE

2/6/07 Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Gary Welsh Institute of Nuclear Power Operations Suite 100 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. Jay Thayer, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jkt@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mr. David J. Modeen Vice President and Chief Nuclear Officer EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com 2/6/07 Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 jgaertner@epri.com Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 ryang@epri.com Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com