ML070470354
| ML070470354 | |
| Person / Time | |
|---|---|
| Site: | Crane (DPR-050) |
| Issue date: | 02/15/2007 |
| From: | Marvin Sykes Operations Branch I |
| To: | Crane C AmerGen Energy Co |
| Shared Package | |
| ML053400268 | List: |
| References | |
| Download: ML070470354 (3) | |
Text
February 15, 2007 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
SUBJECT:
LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION -
THREE MILE ISLAND NUCLEAR STATION, UNIT 1
Dear Mr. Crane:
In a telephone conversation on February 13, 2007, Mr. John G. Caruso, Senior Examiner/Inspector, and Mr. Jack Carney, Licensed Operator Requalification Program Lead made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Three Mile Island facility. The inspection is planned for the week of March 26, 2007, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by March 15, 2007.
Mr. Carney has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV ; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503-0001.
C. M. Crane 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. John Caruso at (610) 337-5389.
Sincerely,
/RA by M. Gamberoni for/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No:
50-289 License No:
DPR-50 cc:
Chief Operating Officer, AmerGen Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)
D. Allard, PADEP Craig Smith, Regulatory Assurance Manager Director, Training
C. M. Crane 3
Distribution: (VIA E-MAIL)
S. Collins, RA M. Dapas, DRA R. Bellamy, DRP S. Barber, DRP D. Kern, DRP, Senior Resident Inspector C. LaRegina, DRP, Site OA J. Lamb, RI, OEDO J. Lubinski, NRR H. Chernoff, NRR V. Nerses, PM, NRR E. Miller, NRR J. Boska, NRR Region I Docket Room (with concurrences)
C. Bixler, DRS (OL Facility File)
L. Vick, NRR/ADRO/DIRS/IOLB A. Blough, DRS M. Sykes, DRS SUNSI Review Complete: JMD (Reviewers Initials)
ADAMS PKG: ML053400268 DOCUMENT NAME: C:\\FileNet\\ML070470354.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler/CJB JCaruso/JGC MDSykes/MKG for DATE 02/15/07 02/14/07 02/15/07 OFFICIAL RECORD COPY