ML070440135

From kanterella
Jump to navigation Jump to search
Notification of Change in Level 1 and Level 2 Management at the University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL)
ML070440135
Person / Time
Site: University of Texas at Austin
Issue date: 02/02/2007
From: O'Kelly S
University of Texas at Austin
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML070440135 (1)


Text

Department of Mechanical Engineering THE UNIVERSITY OF TEXAS AT AUSTIN Nuclear Engineering Teaching Laboratory Austin, Texas 78758 512-232-5370 FAX 512-471-4589 http//www. me. utexas. edu/- ned/net. html February 2, 2007 Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C., 20555

Subject:

Notification of Change in Level I and Level 2 Management at The University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL)

Reference:

Facility License R-129, Docket 50-602 Sirs:

Dr. Steven Biegalski has replaced Dr. Landsberger as Director of the NETL research reactor facility as of January 29, 2007. Dr. Biegalski is a member of the nuclear engineering program faculty at UT and holds an active Senior Operator license on the NETL TRIGA. In addition, Dr. Steven Leslie assumed the position of Executive Vice President and Provost on January 3, 2007.

The following is the list of.Level, 1 and Level 2 Line Management for the R-129 license.

President of the University of Texas at Austin William Powers, Jr.

Exec. Vice President and Provost Steven W. Leslie College of Engineering Dean Benjamin G. Streetman Department of Mech. Engineering Chair Joseph J. Beaman NETL Director Steven Biegalski NETL Associate Director D. Sean O'Kelly Please contact the NETL if you have any questions at 512-232-5373.

Sean O'K:I11'-ý NETL Associate Director cc: Reactor Oversight Committee A. Adams, Project Manager 1460('0