ML070430237

From kanterella
Jump to navigation Jump to search
Summary of Category One Public Management Meeting Regarding Status of the Licensees Corrective Actions on the Turkey Point Substantive Cross-Cutting Issue
ML070430237
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/12/2007
From: Ernstes M
NRC/RGN-II/DRP/RPB3
To: Stall J
Florida Power & Light Co
Shared Package
ML070430223 List:
References
Download: ML070430237 (5)


Text

February 12, 2007 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY ONE MANAGEMENT MEETING -

TURKEY POINT NUCLEAR PLANT, DOCKET NOS. 05000250 AND 05000251

Dear Mr. Stall:

This summary refers to the management meeting conducted at your request at the Region II Office in Atlanta, Georgia on February 1, 2007. The purpose of the meeting was to brief the status of the licensee's corrective actions on the Turkey Point substantive cross-cutting issue.

Enclosed is a list of attendees and the licensees handout.

The discussions focused on the following topics: Corrective Action Program Progress and Focus on Human Performance. The meeting was informative and did not result in any specific regulatory decisions.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact Mr. Son Ninh at (404) 562-4532.

Sincerely,

/RA/

Michael E. Ernstes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41

Enclosures:

1. List of Attendees
2. Licensees Handout

OFFICE RII:DRP SIGNATURE SON NAME SNinh DATE 2/12/2007 2/ /2007 2/ /2007 2/ /2007 2/ /2007 2/ /2007 2/ /2007 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

2 cc w/encl.:

T. O. Jones Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution James Connolly Licensing Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Becky Ferrare Licensing Department Administrator Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Michael O. Pearce Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution William E. Webster, Vice President Nuclear Operations Florida Power & Light Company Electronic Mail Distribution Mark Warner, Vice President Nuclear Operations Support Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Alejandro Sera Miami-Dade County Emergency Management Coordinator Electronic Mail Distribution County Manager Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Curtis Ivy City Manager of Homestead Electronic Mail Distribution Distribution w/encl.: (See page 3)

3 Report to J. A. Stall from Michael E. Ernstes dated February 12, 2007.

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY ONE MANAGEMENT MEETING -

TURKEY POINT NUCLEAR PLANT, DOCKET NOS. 05000250 AND 05000251 Distribution w/encl:

B. Moroney, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC LIST OF ATTENDEES Nuclear Regulatory Commission W. Travers, Regional Administrator, Region II (RII)

V. McCree, Deputy Regional Administrator, RII C. Casto, Director, Division of Reactor Projects (DRP), RII J. Shea, Director, Division of Reactor Safety (DRS), RII M. Ernstes, Chief, Reactor Project Branch 3, DRP, RII S. Ninh, Senior Project Engineer, Branch 3, DRP, RII Florida Power and Light Company W. Webster, Vice President, Nuclear Operations T. Jones, Site Vice President, Turkey Point S. Greenlee, Engineering Manager, Turkey Point J. Connolly, Licensing Manager, Turkey Point C. Bible, Director, Nuclear Engineering/Regulated Plants, FPL J. Molden, Operations Manager, Turkey Point J. Hoffman, Senior Staff Engineer, FPL Public K. Sims, IBEW *

  • Participated in by telephone.