ML070330525
| ML070330525 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 02/02/2007 |
| From: | Veronica Rodriguez NRC/NRR/ADRO/DLR/RLRB |
| To: | Wolf Creek |
| rodriguez v m, ADRO/DLR/RLRB, 415-3703 | |
| References | |
| Download: ML070330525 (5) | |
Text
February 2, 2007 LICENSEE: Wolf Creek Nuclear Operating Corporation FACILITY: Wolf Creek Generating Station, Unit 1
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON JANUARY 4, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND WOLF CREEK NUCLEAR OPERATING CORPORATION, CONCERNING THE UPCOMING SCOPING AND SCREENING METHODOLOGY AUDIT The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Wolf Creek Nuclear Operating Corporation (WCNOC) held a telephone conference call on January 4, 2007, regarding the upcoming scoping and screening methodology audit to be conducted at Wolf Creek Generating Station during the week of January 8, 2007.
The Enclosure shows a list of participants. During the telephone conference the following logistical items were discussed:
The applicant confirmed that the list of documents requested by the staff will be available, to the extent practicable, in hard copy. In addition, the staff requested that documentation for high pressure coolant injection, auxillary feedwater and auxiliary building be available.
The applicant was requested to confirm whether PI-01-08/06, Revision 3, is the only implementing procedure available. If not, additional implementing procedures should be made available. The applicant was informed that paper copies of large documents are not needed but should be readily accessible.
The staff requested access to the source documents current licensing basis for the systems and structures named above.
The applicant was requested to confirm whether laptops are allowed on site for word processing purposes. In addition, the applicant was informed that the staff will not be needing access to the internet; however, a representative from WCNOC should be available to print necessary documents.
The applicant was informed that the entrance meeting will be at 9:00 am.
/RA/
Verónica M. Rodríguez, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosure:
List of Participants cc w/encl: See next page
ML070330525 C:\\FileNet\\ML070330525.wpd OFFICE LA:DLR PM:RLRB:DLR PM:RLRB:DLR BC:RLRB:DLR NAME IKing KGreen VRodriguez RAuluck (STH for)
DATE 02/2/07 02/2/07 02/2/07 02/2/07
Note to Wolf Creek, from Veronica Rodriguez, dated February 02, 2007
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON JANUARY 4, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND WOLF CREEK NUCLEAR OPERATING CORPORATION, CONCERNING THE UPCOMING SCOPING AND SCREENING METHODOLOGY AUDIT DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RWeisman GGalletti DShum SSmith (srs3)
SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDeEqvb RidsNrrDss RidsOgcMailCenter RidsNrrAdes VRodriguez KGreen CJacobs JDonohew GPick, RIV SCochrum, RIV
Wolf Creek Generating Station cc:
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street, NW Washington, DC 20037 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-7005 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839 Chief Engineer, Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612 Attorney General 120 SW 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Thomas A. Conley, Section Chief Radiation and Asbestos Control Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant 8201 NRC Road Steedman, MO 65077-1032 Kevin J. Moles, Manager Regulatory Affairs Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Lorrie I. Bell, Project Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
ENCLOSURE TELEPHONE CONFERENCE CALL WOLF CREEK GENERATING STATION, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS January 4, 2007 PARTICIPANTS AFFILIATION Kim Green U.S. Nuclear Regulatory Commission (NRC)
Devender Reddy NRC Billy Rogers NRC Lorrie Bell Wolf Creek Nuclear Operating Corporation (WCNOC)
Charlie Mendenciy WCNOC