ML070300071

From kanterella
Jump to navigation Jump to search
Ltr. LaSalle 01/30/07 Request for Information
ML070300071
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/30/2007
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Crane C
Exelon Generation Co
References
Download: ML070300071 (7)


Text

January 30, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNIT 1 AND 2 INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION

Dear Mr. Crane:

On April 30, 2007, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59) baseline inspection at the LaSalle County Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedures (IP) 71111.02 and IP 71111.17. The on-site portion of the inspection will take place on April 30, 2007 - May 4, 2007, and May 14-18, 2007.

Experience has shown that these baseline inspections are resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site, and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.

The Group 1 documents should be sent to the Regional Office no later than March 19, 2007.

The inspection team will review this information and no later than March 28, 2007, will request specific items for review. The Group II documents will need to be sent to the Region III Office for review no later than April 13, 2007. The Group III requested documents contain additional items that the team will review, or need access to, beginning the first on-site day of the inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. M. Holmberg. We understand that our regulatory contact for this inspection is Mr. P. Holland of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9748 or via e-mail at msh@nrc.gov.

C. Crane In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl:

Site Vice President - LaSalle County Station LaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission

C. Crane In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl:

Site Vice President - LaSalle County Station LaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME:C:\\FileNet\\ML070300071.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MHolmberg: ls DHills DATE 01/29/07 01/30/07 OFFICIAL RECORD COPY

C. Crane ADAMS DISTRIBUTION:

DXC1 TEB DMS6 RidsNrrDirsIrib GEG KGO GLS DEK CAA1 DRPIII DRSIII PLB1 TXN

INITIAL DOCUMENT REQUEST Enclosure 1

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Report:

05000373; 05000374/2007007(DRS)

Inspection Dates:

April 30 through May 18, 2007 Inspection Procedures:

IP 71111- 02, Evaluation of Changes, Tests, or Experiments IP 71111-17, Permanent Plant Modifications Lead Inspector:

M. Holmberg (630) 829-9748 I.

Information Requested for Inspection Preparation The following information is requested by March 19, 2007, or sooner, to facilitate the selection of specific items that will be reviewed during the preparation and on-site inspection weeks. The team will select specific items from the information requested below and submit a list to your staff by March 28, 2007. We will request that certain items be sent to the Regional Office by April 13, 2007, to support inspection preparation.

We will request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the last Permanent Modification Inspection exit (July 26, 2005), to the present. If you have any questions regarding this information, please call the team leader as soon as possible.

(1)

List of field complete permanent plant modifications to systems, structures, or components. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes; design changes; set point changes; equivalency evaluations; suitability analyses; and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or date),

and the affected system. In addition to the list, please provide a description of each modification, and a list of associated calculations, and affected procedures.

(2)

List of all 10 CFR 50.59 evaluations for completed changes to the facility involving:

(a) calculations; (b) procedure revisions; (c) changes to the facility (modifications);

(b) non-routine operating configurations; and (e) departures in methods of analyses.

INITIAL DOCUMENT REQUEST Enclosure 2

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

(3)

List of all completed changes to the facility that have been screened out of 10 CFR 50.59 as not requiring a full evaluation involving:

(a) calculations; (b) procedure revisions; (c) changes to the facility (modifications);

(d) non-routine operating configurations; and (e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(4)

List of any completed modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.

(5)

List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification, and 10 CFR 50.59 change implementation. Please provide the word searches used to identify these issues in your electronic corrective action system data bases.

The list should contain the number, title, and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.

(6)

Copies of procedures addressing the following: modifications; design changes; set point changes; equivalency evaluations or suitability analyses; commercial grade dedications; post-modification testing; 10 CFR 50.59 evaluation and screenings; and UFSAR updates.

(7)

UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.

(8)

Name(s) and phone numbers for the regulatory and technical contacts.

(9)

Current management and engineering organizational chart.

INITIAL DOCUMENT REQUEST Enclosure 3

II.

Information Requested to be Sent to the Region III Office (M. Holmberg) by April 13, 2007 to Support Inspection Preparation.

(1)

Copies of items selected from Section I which are needed for inspection preparation.

This includes copies of supporting/associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.

III.

Information Requested to be provided on First Day of Inspection (April 30, 2007)

(1)

Copies of all items selected from Section I needed for the first day of inspection.

This includes copies of supporting/associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.

(2)

Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.

(a)

Updated Final Safety Analysis Report; (b)

Original FSAR Volumes; (c)

Original SER and Supplements (for Original FSAR);

(d)

FSAR Question and Answers; (e)

Quality Assurance Plan; (f)

Technical Specifications; (g)

Latest IPE/PRA Report; (h)

Vendor Manuals; and (i)

The Latest 10 CFR 50.59 FSAR Update Submittal.

(3)

Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:

(a)

Drawings supporting the modifications; (b)

Procedures affected by the modifications; and (c)

UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

If you have questions regarding the information requested, please contact the team leader.