April 4, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION, UNIT NOS. 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO BULLETIN 2004-01, ?INSPECTION OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE PIPING CONNECTIONS AT PRESSURIZED WATER REACTORS, (TAC NOS. MC3461, MC3462, MC3463, AND MC3464)
Dear Mr. Crane:
By letter to the Nuclear Regulatory Commission (NRC) dated July 27, 2004, Exelon Generation Company, LLC submitted a 60-day response to NRC Bulletin 2004-01, ?Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors, for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2.
The NRC staff is reviewing your response and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. So that the NRC staff can complete its review, provide a response within 30 days from the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-3733.
Sincerely,
/RA/
Robert F. Kuntz, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, STN 50-456 and STN 50-457
Enclosure:
Request for Additional Information cc w/encl: See next page
April 4, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION, UNIT NOS. 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO BULLETIN 2004-01, ?INSPECTION OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE PIPING CONNECTIONS AT PRESSURIZED WATER REACTORS, (TAC NOS. MC3461, MC3462, MC3463, AND MC3464)
Dear Mr. Crane:
By letter to the Nuclear Regulatory Commission (NRC) dated July 27, 2004, Exelon Generation Company, LLC submitted a 60-day response to NRC Bulletin 2004-01, ?Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors, for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2.
The NRC staff is reviewing your response and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. So that the NRC staff can complete its review, provide a response within 30 days from the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-3733.
Sincerely,
/RA/
Robert F. Kuntz, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, STN 50-456 and STN 50-457
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 RidsNrrPMRKuntz RidsNrrLAEWhitt RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn3MailCenter RidsNrrDorlDpr ADAMS Accession Number: ML070240022 NRR-088 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME RKuntz:mw EWhitt RGibbs DATE 4/4/2007 4/2/2007 4/4/2007 OFFICIAL RECORD COPY
Byron/Braidwood Stations cc:
Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, PA 15230-0355 Howard A. Learner Environmental Law and Policy Center of the Midwest 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Byron Resident Inspectors Office 4448 N. German Church Road Byron, IL 61010-9750 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 Attorney General 500 S. Second Street Springfield, IL 62701 Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness 110 East Adams Street Springfield, IL 62701-1109 Plant Manager - Byron Station Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Site Vice President - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 U.S. Nuclear Regulatory Commission Braidwood Resident Inspectors Office 35100 S. Rt. 53, Suite 79 Braceville, IL 60407 County Executive Will County Office Building 302 N. Chicago Street Joliet, IL 60432 Plant Manager - Braidwood Station Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Ms. Bridget Little Rorem Appleseed Coordinator 117 N. Linden Street Essex, IL 60935 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Senior Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
Byron/Braidwood Stations Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Regulatory Assurance - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Manager Regulatory Assurance - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Assistant General Counsel Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 Vice President - Regulatory & Legal Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Braidwood/Byron Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
Enclosure REQUEST FOR ADDITIONAL INFORMATION BYRON STATION, UNIT NOS. 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 DOCKET NOS. STN 50-454, STN 50-455, STN 50-456 AND STN 50-457 The NRC is reviewing Exelon Generation Companys (Exelons) 60 day response to NRC Bulletin 2004-01, ?Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors for the Byron Station, Unit Nos. 1 and 2 (Byron) and Braidwood Station, Units 1 and 2 (Braidwood), dated July 27, 2004. Based on the NRC staffs review, additional information is needed. Please provide a supplemental response which addresses the following question:
Item 1(c) in Bulletin 2004-01 states in part, If leaking pressurizer penetrations or steam space piping connections are found, indicate what followup NDE [nondestructive examination] will be performed to characterize flaws in the leaking penetrations. Provide your plans for expansion of the scope of NDE to be performed if circumferential flaws are found in any portion of the leaking pressurizer penetrations or steam space piping connections. Provide a response that addresses whether NDE that is capable of determining crack orientation will be performed in order to accurately characterize the flaw, its orientation and its extent where evidence of apparent reactor coolant pressure boundary leakage is discovered by visual examination. The response should also provide your plans for expansion of the scope of NDE to other components in the pressurizer to be performed if circumferential flaws are found in any portion of the leaking pressurizer penetrations or steam space piping connections. Alternatively, if you will not supplement your original response to address the comments above, please provide a technical justification for not doing so.