January 16, 2007 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE JANUARY 10, 2007, PUBLIC MEETING TO DISCUSS THE CLOSURE OF THE SEPTEMBER 28, 2005, CONFIRMATORY ACTION LETTER AND THE OVERALL RESULTS OF THE PERRY PERFORMANCE IMPROVEMENT INITIATIVE On January 10, 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at the Region III Office in Lisle, Illinois. The meeting was between NRC Region III and FirstEnergy Nuclear Operating Company (FENOC) management to discuss the closure of the September 28, 2005, Confirmatory Action Letter and the overall results of the Perry Performance Improvement Initiative. The meeting notice and licensee presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML063310368, and ML070120562, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with a brief introduction, then FENOC management discussed the results of the recently completed Confirmatory Action Letter commitments and Performance Improvement Initiative actions at Perry; discussed the Perry Excellence Plan; and requested that the NRC remove Perry from the Multiple/Repetitive Degraded Cornerstone column of the action matrix. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

As Stated Distribution See next page

LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE JANUARY 10, 2007, PUBLIC MEETING TO DISCUSS THE CLOSURE OF THE SEPTEMBER 28, 2005, CONFIRMATORY ACTION LETTER AND THE OVERALL RESULTS OF THE PERRY PERFORMANCE IMPROVEMENT INITIATIVE On January 10, 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at the Region III Office in Lisle, Illinois. The meeting was between NRC Region III and FirstEnergy Nuclear Operating Company (FENOC) management to discuss the closure of the September 28, 2005, Confirmatory Action Letter and the overall results of the Perry Performance Improvement Initiative. The meeting notice and licensee presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML063310368, and ML070120562, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with a brief introduction, then FENOC management discussed the results of the recently completed Confirmatory Action Letter commitments and Performance Improvement Initiative actions at Perry; discussed the Perry Excellence Plan; and requested that the NRC remove Perry from the Multiple/Repetitive Degraded Cornerstone column of the action matrix. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

As Stated Distribution See next page DOCUMENT NAME:C:\FileNet\ML070170711.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RRuiz:sls EDuncan DATE 01/16/07 01/16/07 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl: G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support Director, Site Operations Director, Fleet Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

FirstEnergy Nuclear Operating Company DISTRIBUTION:

DXC1 TEB TJW2 RidsNrrDirsIrib GEG KGO GLS MEF1 CAA1 DRPIII DRSIII PLB1 TXN

Principal Meeting Participants NRC J. Caldwell, Regional Administrator, Region 3 Office G. Grant, Deputy Regional Administrator, Region 3 Office M. Satorius, Director, Division of Reactor Projects A. Boland, Director, Division of Reactor Safety S. West, Deputy Director, Division of Reactor Projects E. Duncan, Chief, Branch 6, Division of Reactor Projects A. Stone, Chief, Branch 2, Division of Reactor Safety T. Wengert, Project Manager, Office of Nuclear Reactor Regulation M. Franke, Senior Resident Inspector, Perry FirstEnergy Nuclear Operating Company J. Hagan, Chief Operating Officer, FENOC L. Pearce, Site Vice President B. Allen, Director, Site Operations G. Halnon, Director, Fleet Regulatory Affairs A. Cayia, Director, Performance Improvement D. Evans, Manager, Operations M. Wayland, Director, Maintenance J. Lausberg, Manager, Regulatory Compliance T. Mueller, Manager, Maintenance Enclosure