ML070090012

From kanterella
Jump to navigation Jump to search
Notice of Forthcoming Pre-Submittal Meeting with Firstenergy Nuclear Operating Co. (FENOC) to Discuss Proposed Davis-Besse Measurement Uncertainty Recapture (MUR) Power Update License Amendment Request
ML070090012
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/11/2007
From: Thomas Wengert
NRC/NRR/ADRO/DORL/LPLIII-2
To: Marshall M
NRC/NRR/ADRO/DORL/LPLIII-2
Wengert, Thomas
References
Download: ML070090012 (5)


Text

January 11, 2007 MEMORANDUM TO: Michael L. Marshall, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing FROM:

Thomas J. Wengert, Project Manager /RA/

Plant Licensing Branch III-2 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING PRE-SUBMITTAL MEETING WITH FIRSTENERGY NUCLEAR OPERATING CO. (FENOC) TO DISCUSS PROPOSED DAVIS-BESSE MEASUREMENT UNCERTAINTY RECAPTURE (MUR)

POWER UPRATE LICENSE AMENDMENT REQUEST DATE & TIME:

Tuesday, January 23, 2007 1:00 p.m. to 4:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-3B4 Rockville, Maryland PURPOSE:

Pre-submittal meeting to discuss Davis-Besses proposed license amendment request for measurement uncertainty recapture (MUR) power uprate.

CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACT: T. Wengert, NRR 301-415-4037 tjw2@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002.

M. Marshall PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC FENOC T. Wengert, NRR J. Grabnar M. Marshall, NRR G. Halnon T. Alexion, NRR H. Hegrat T. Kobetz, NRR S. Sarver J. Nakoski, NRR K. Byrd A. Howe, NRR, et al.

T. Laurer A. Wilson D. Blakely Docket No. 50-346

Enclosure:

Agenda cc w/encl: See next page

M. Marshall January 11, 2007 PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC FENOC T. Wengert, NRR J. Grabnar M. Marshall, NRR G. Halnon T. Alexion, NRR H. Hegrat T. Kobetz, NRR S. Sarver J. Nakoski, NRR K. Byrd A. Howe, NRR, et al.

T. Laurer A. Wilson D. Blakely Docket No. 50-346

Enclosure:

Agenda cc w/encl: See next page Distribution:

PUBLIC Receptionist (OWFN and TWFN)

RTelson, NRR LPL3-2 R/F RidsAcrsAcnwMailCenter PHearn, NRR RidsNrrDirsItsb RidsNrrAdro RidsNrrDssSbwb RidsNrrDorl RidsRgn3MailCenter RidsNrrDeEicb RidsNrrDorlLpl3-2 TBloomer, EDO RidsNrrDprPgcb RidsNrrPMTWengert JStrasma, OPA, Region III TAlexion, NRR RidsNrrLAEWhitt PMNS TLiu, NRR RidsOpaMail RidsOgcMailCenter Accession Number:070090012 OFFICE PM:LPL3-2 LA:LPL3-2 BC:LPL3-2 (A)

NAME TWengert EWhitt MMarshall DATE 1/11/07 1/11/07 1/11/07 OFFICIAL RECORD COPY

Davis-Besse Nuclear Power Station, Unit 1 cc:

Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760 Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60523-4351 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General Office of Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH 43604-6506 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515 The Honorable Dennis J. Kucinich United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107 Gary R. Leidich President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 Joseph J. Hagan Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308

Davis-Besse Nuclear Power Station, Unit 1 cc:

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-115 395 Ghent Road Akron, OH 44333 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GHE-315 395 Ghent Road Akron, OH 44333 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760

Enclosure FirstEnergy Nuclear Operating Co. (FENOC)

Pre-Submittal Meeting for Davis-Besse Measurement Uncertainty Recapture (MUR)

Power Uprate License Amendment Request January 23, 2007 Proposed Agenda

Introductions

FENOC Presentation of Proposed Amendment Deviations from RIS 2002-03 Technical Specifications Discussion of Supporting Analysis and Calculations Proposed Submittal Schedule Discussion and Questions Adjourn