December 28, 2006

Randall K. Edington, Vice

President-Nuclear and CNO

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - NRC INITIAL OPERATOR LICENSING

RETAKE EXAMINATION 05000298/2007301

In a telephone conversation on December 18, 2006, between Messrs. Dave Tune, Operations

Training Superintendent and Steve Garchow, NRC Chief Examiner, arrangements were made

for the administration of a retake licensing examination at the Cooper Nuclear Station during

the week of January 29, 2007. This retake examination will consist of the simulator scenario

portion of the operating examination for one reactor operator candidate.

As agreed during the telephone conversation, your staff will prepare the examination. This

activity will be performed in accordance with the guidelines contained in Revision 9 of

NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs

regional office will discuss with your staff any changes that might be necessary before the

examinations are administered. Your support for the onsite examination validation will be

required during the week of January 29, 2006.

To meet the above schedule, it will be necessary for your staff to furnish the examination outline

by January 12, 2007. The examination, and any supporting reference materials will be due by

January 22, 2007. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal

Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall

approve the outlines, examinations, and tests before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use. Any delay in receiving the

required examination and reference materials, or the submittal of inadequate or incomplete

materials, may cause the examinations to be rescheduled.

In order to conduct the requested operating test, it will be necessary for your staff to provide

adequate space and accommodations in accordance with ES-402, and to make the simulation

facility available on the dates noted above. In accordance with ES-302, your staff should retain

the original simulator performance data (e.g., system pressures, temperatures, and levels)

generated during the dynamic operating tests until the examination results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be

in effect while the operating test is being administered.

Nebraska Public Power District

- 2 -

To permit timely NRC review and evaluation, your staff should resubmit the reactor operator

license application (Office of Management and Budget (OMB) approval number 3150-0090),

medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval

number 3150-0090) at least 7 days before the examination date. If the signed application

certifying that all training has been completed is not received at least 7 days before the

examination date, a postponement may be necessary.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, writing the examinations,

and completing and reviewing the collection of information. Send comments on any aspect of

this collection of information, including suggestions for reducing the burden, to the Information

and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk

Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of

Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to,

an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosures will be available electronically for public inspection in the NRCs Public

Document Room or from the Publicly Available Records (PARS) component of the NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the Electronic Reading Room page of the NRCs public Web site at

http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Tune has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Garchow at 817-276-4426, or myself at

817-860-8159.

Sincerely,

/RA/

Rebecca L. Nease, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-298

License: DPR-46

Nebraska Public Power District

- 3 -

cc:

Gene Mace

Nuclear Asset Manager

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

John C. McClure, Vice President

and General Counsel

Nebraska Public Power District

P.O. Box 499

Columbus, NE 68602-0499

P. V. Fleming, Licensing Manager

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

Michael J. Linder, Director

Nebraska Department of

Environmental Quality

P.O. Box 98922

Lincoln, NE 68509-8922

Chairman

Nemaha County Board of Commissioners

Nemaha County Courthouse

1824 N Street

Auburn, NE 68305

Julia Schmitt, Manager

Radiation Control Program

Nebraska Health & Human Services

Dept. of Regulation & Licensing

Division of Public Health Assurance

301 Centennial Mall, South

P.O. Box 95007

Lincoln, NE 68509-5007

H. Floyd Gilzow

Deputy Director for Policy

Missouri Department of Natural Resources

P. O. Box 176

Jefferson City, MO 65102-0176

Nebraska Public Power District

- 4 -

Director, Missouri State Emergency

Management Agency

P.O. Box 116

Jefferson City, MO 65102-0116

Chief, Radiation and Asbestos

Control Section

Kansas Department of Health

and Environment

Bureau of Air and Radiation

1000 SW Jackson, Suite 310

Topeka, KS 66612-1366

Daniel K. McGhee, State Liaison Officer

Bureau of Radiological Health

Iowa Department of Public Health

Lucas State Office Building, 5th Floor

321 East 12th Street

Des Moines, IA 50319

Don Flater, Radiation Control

Program Director

Bureau of Radiological Health

Iowa Department of Public Health

Lucas State Office Building, 5th Floor

321 East 12th Street

Des Moines, IA 50319

Ronald D. Asche, President

and Chief Executive Officer

Nebraska Public Power District

1414 15th Street

Columbus, NE 68601

Jerry C. Roberts, Director of

Nuclear Safety Assurance

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

John F. McCann, Director, Licensing

Entergy Nuclear Northeast

Entergy Nuclear Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601-1813

Nebraska Public Power District

- 5 -

Keith G. Henke, Planner

Division of Community and Public Health

Office of Emergency Coordination

930 Wildwood, P.O. Box 570

Jefferson City, MO 65102

Nebraska Public Power District

- 6 -

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (SCS)

Branch Chief, DRP/C (KMK)

Senior Project Engineer, DRP/C (WCW)

Team Leader, DRP/TSS (MAS3)

RITS Coordinator (MSH3)

DRS STA (DAP)

D. Cullison, OEDO RIV Coordinator (DGC)

ROPreports

CNS Site Secretary (SEF1)

SUNSI Review Completed: __Y____ ADAMS: / Yes

G No Initials: _SMG_____

/ Publicly Available G Non-Publicly Available G Sensitive

/ Non-Sensitive

R:\\REACTORS\\REPORTS\\CN2007301LT-SMG

SOE:OB

C:OB

SMGarchow/lmb

RLNease

/RA/

/RA/

12/28/06

12/28/06

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax