ML063560396

From kanterella
Jump to navigation Jump to search
NPDES Monthly Report Forms for November 2006
ML063560396
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/14/2006
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency
References
PY-CEI/OEPA-0463L
Download: ML063560396 (10)


Text

FENOC FRst negyM.Ic (ear O Cperating Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 L. W. Pearce Vice President, Nuclear December 14, 2006 PY-CEI/OEPA-0463L Ohio Environmental Protection Agency Division of Water Pollution Control Enforcement Section, ES/MOR P.O. Box 1049 Columbus, Ohio 43216-1049 Ladies and Gentlemen:

Enclosed are the NPDES monthly report forms for the month of November 2006.

No violations occurred during this period.

440-280-5382 If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.

Sincerely Enclosures cc: NRC Region III NRC Resident Inspector NRC Project Manager NRC Document Control Desk (Docket No. 50-440)

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station Code:

Reported Date (Month Year)

Application:

12/612006 Perry Nuclear Power Plant 004 November 2006 3IBO0016*GD Perry Nuclear Power Plant 10 Center Rd.

Samplng Sescripton PerryOH44081

'Point Representative of Discharge in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:

Analyst:

in(2) - Enter frequency of sampling CCB125 Liz Ryan

(

3 3

3 3

1 31 (2)1 1

1 1

.999 1

999 1

1 T/

(50060)

(00400)

(01119)

(00011)

(34044)

(50050)

(78739)

Chlorine, Total pH Copper, Total Water Temperature Oxidants, Total Flow Rate

'.orination/Brominat:

Residual S.U.

Recoverable F

Residual tMGD Duration Day mg/l ug/l mg/l Minutes 01 AA 64 A

87.2 100 02 AA 66 AH 85.6 100 03 AA 8.24 62 AH 65.3' 50 04 AA 59 AH 71 100 05 AA 61 AH 97.5 100 06 AA 62 AH 103.1 1

100 07 A1A 8.48-0.7 64 AHt 106.3 1

100 08 AA 64 AH 100.6 100 09 AA 61

-AH-100.8-100 10 AA 8.36 65 AH 105.2 1

i00 11 AA 68 A_

98.2 100 12 A

64 AH 89.2 100 13 AA 62 AH 88.4 100

'14 AA 8.42 60 AH 74.9 100 AA 63 AH 93.3 100 16 AA 64 AH 96.8 100 17 AA 8.38 64 AH 95.2 100 18 AA 63 AH 91.9 100 19 AA 63 A

89.5 100 S---

100 20-AA 62 AH 88.5 j50 21 AA 8.51 61 AH 88.2 100


A--

A-- -

8.51..............................

6 A..

2 1

22 AA 61 AH 82.1 -

100 23 A

61 A-86.6 100 24 AA 8.43 61 AR 84.7 100 25 AA 63 AH 90.6 1

100 26 AA 64 AH 92.7 30 27 A-A 67 AR 85.1 AR 28 AA 8.76 68 AH 86.3 100 29 A-A 70 AH 84.4 100 30 AA 71 AH 82.7 100 31 TOTAL 0

67.58 10.7 1908 0

2691.9 2730 AVG 0

N/A 10.7 63.6 0

89.73 94.1379 MAX 0

8.76 10.7 71 0

106.3 100 MIN 0

8.24 10.7 59 0

65.3 30 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for subnring false information, including the possibility of fine and imprisonment Date Report Completed:

of R p rter:

Title of Reporter:

12/06/2006 f,,./,

Vice President, Nuclear 62A c"

(

Form No EPA 4500 (8-91)

(Generated by SWIMS)

Formerly EPA SURI

.Page I of 1

MONTHLY REPORT FORM Name, Address City, County, ZIP:

Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Rd.

Perry OH 44081 4500 Station Code:

004 Reported Date (Month Year):

November 2006 Application 31B00016*GD 1216/2006 Sampling Station Description :

Point Representative of Discharge Reporting Code Result Date Additional Remarks 34044 11/01/2006 No bromination events this date 34044 11/02/2006 No bromination events this date 34044 11/03/2006 No bromination events this date

......... 0--...

..{717 ioi-o1 -m i i~g liY=-i I-ii 34044 11/04/2006 No bromination events this date 34044 11/05/2006 No bromination events this date Mdl 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 34044 540060 540060 540060 540060 540060 34044 50060 50060 50060 50060 50060 50060 50060 50060 50060 11/06/2006 11/07/2006 11/08/2006

~......

11/09/2006 11/10/2006 11/11/2006 11/12/2006 11/14/2006 11/15/2006 11/16/2006 11/17/2006 11/18/2006 11/19/2 006 11/20/2006 11/231/2o0o06 11/224/2o006 11/23/2006 11/24/2006 11/27/2006 11/25/2006 11/27/2006 11/30/2006 11/01/2006 11/02/2006 11/03/2006 11/ý4/20oo6 i.11/0 6 /2 0-0

_6 11/07 /200 6 11/08/2006 10 11/09/2006 No No No bromination events bromination-events bromination events bromination events this date this date this date this date Io bromination events this date No bromination events this date No bromination events this date

--e vents this dat No bromination events this date

ý'o ýý-r-ogm-i--n-a-t-i-n--e-ve-ng-t-s----h i--sd--a-t- -------.

I-

b. iai en this d No bromination events this date

ýqo bromination events this date

-I No bromination events this date No No No No bromination events this date bromination events this date bromination events this date b.*.ina.tio*n s

-en s dae.

bromination events this date Io ror.ination Po bromination No bromination.

NI brominati..............

..n.

No bromination No bromination No bromination No bromination

,No bromination Less than MDL Less than MDL s.

Less than MDL Less than MDL Less than MDL Less than MDL Less than MDL Less than MDL

!Less than MDL event t

date-

{.-----ii'g events events events events events events events events this date this date this date this date this date this date this date this date this date

.05

.05

.05

..05

.05

.05

.05

.05

.05

.05

Reporting Code Result Date A&dditional Remarks Mdl 50060 11/10/2006 'Less than MDL

.05 50060 11/11/2006 Less than MDL

.05 50060 11/12/2006 Less than MDL

.05 50060 11/13/2006 6Less than MDL

.05 50060 11/14/2006 -Less than MDL

.05 50060 1/5

/2-0-06 Las's tha-n MD-L

.05-50060 11/16/2006 Less than MDL

.05 50060 ii/17/2006 Less than MDL

.05 50060 11/18/2006 Less than MDL

-.05 50060 11/19/2006 Less than MDL

..05 50060 11/20/2006 Less than MDL

.05 50060 11/21/2006 Less than MDL

.05 50060 11/22/2006 Less than MDL

.05 50060 11/23/2006 Less than MDL

.05 50060 11/24/2006 Less than MDL

.05 50060 11/25/2006 Less than MDL

.05


I-----

50060 11/26/2006 Less than MDL

.. 05 50060 11/27/2006 Less than MDL

ý.05 50060 11/28/2006 ;ess than MDL

.05 560

11/22/2006 *Less than MDL 05 50060
  • 11/23/2006 Less than MDL

!.05 78739 11/27/2006 o Chorination this date due to diving activities.

V.

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station. Code :

Reported Date (Month Year)

Application 12/6/2006 Perry Nuclear Power Plant 601.

November 2006 31B00016*GD Perry Nuclear Power Plant Sampling 10 CnterRd.SampingStation Description 10 center Rd.

PerryOH44081 Discharge from Regenerate Neutralization Pits in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:

Analyst:

in(2) - Enter frequency of sampling CCB125 Liz Ryan (1) 3 3

3 1

(2) 1 1

999 (00400)

(00530)

(00550)

(50050) pH Total Suspended Oil and Grease.

Flow Rate S.U.

Solids Total MGD Day mg/1 mg/1 01 AH 02 AR 03 AH 04 AH 05 7.85 19 AA 0.0176 06 AH 08 07 AH 09 --

t -

08 AH, 09 AH 10 AH 11 AH 12 7.56 29 AA

0. 0164 13 AH 14 AH' 15 AN 16

-A 17 AN 18

  • AN 19 AN 20

-AN 21

~-

AN--_

22 AN 23 AN 24 AN 25 AN 26 8.06 20 AA 0 0172 27

  • AN
28.

AH i

29 AN 30 AH 31 TOTAL 23.47 68 0

0.0512 0

0 AVG N/A 22.6667 0

0.0171 MAX 8.06 29 0

0.0176 MIN 7.56 19 0

0.0164 0

0 0

I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for su/"tting false information, including the possibility of fine and imprisonment.

DateReportCompleted:

t of eorter:

Title of Reporter:

12/06/2006

(/

1 J/

Vice President, Nuclear Form No EPA 4500 (8-91)

(Generated by SWIMS)

Formerly EPA SURI Page I of 1

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station Code:

Reported Date (Month Year)

Application:

12/6/2006 Perry Nuclear Power Plant 601 November 2006 31B00016*GD Perry Nuclear Power Plant 10 Center Rd.

Sampling Station Description Perry OH 44081 Discharge from Regenerate Neutralization Pits.

Reporting Code Result Date Additional Remarks Mdl 00550 11/05/2006 Less than MDL

.5.

00550 11/12/2006 'Less than MDL 5

00550 11/26/2006 Less than MDL 5.

50050 11/01/2006 No discharge performed on this date 50050 11102

./2-,0-.

0.6 No d..ischa-rgi.e. -per form.ed -o.n-. this d.a.t.e...

50050 11/03/2006 No discharge performed on this date 50050 11/04/2006 No discharge performed on this date 50050 11/06/2006 No discharge performed on this date 50050 11/07/2006 No discharge performed on this date 50050 11/07/2006 No discharge performed on this date 50050 11/08/2006 No discharge performed on this date 50050 11/09/2006 Oo discharge performed on this date 0

.0.5.

....p.m.e.d.................

o t his date-50050 11/10/2006 No discharge performed on this date 50050 11/11/2006 No discharge performed on this date 50050 11/13/2006 No discharge performed on this date 50050.11/19/2006 dichre.erome.o.hi.d*.................

50050 1 11/14/2006 No discharge performed on this date 50050 11/15/2006 No discharge performed on this date 50050 11/22/2006 No discharge performed on this date 50050 11/12/2006 No discharge performed on this date 50050 11/12/2006 No discharge performed on this date 50050 11/19/2006 No discharge performed on this date 50050 11/20/2006 No discharge performed on this date 50050 11/21/2006 No discharge performed on this date 50050 11/23/2006 No discharge performed on this date 50050 11/24/2006 No discharge performed on this date i

50050 11/25/2006 No discharge performed on this date 50050 11/27/2006 NO discharge performed on this date Iii 50050 11/29/2006 No discharge performed on this date i

Si 50050 11/30/2006 No discharge performed on this date S........... --.

g 3*7 -*

./-p g * -g"

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station Code Reported Date (Month Year)

Application:

12/13/2006 Perry Nuclear Power Plant 602 November 2006 31B00016*GD Perry Nuclear Power Plant 10 Center Rd.

SamplingStation Description PerryOH44081 Discharge from Chemical Cleaning Lagoon in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:

Analyst:

in(2) - Enter frequency of samhpling CCB12 5 Liz Ryan

() 2

-2 32 3

(2) 998 998 1

998 1999 (00980)

(01119)

(00400)

(00530)

(00550)

(50050)

Iron, Total Copper, Total pH Total Suspended Oil and Grease, Flow Rate Recoverable Recoverable S.U.

Solids Total MGD Day ug/l ug/l mg/l mg/l 02 04 05 O-66 07 08 10 12 13 14 15 16 19 20 20 21 22 23 26 27 28 29 30 31 TOTAL 0

0 0

0 0

0 0

AVG 0

N/A MAX 0

MIN 0

0 0

0 0

0 0

I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for subm g false information, including the possibility of fine and imprisonment.

Date Report Completed:

re of R0 'gfter:

Title of Reporter:

12/06/2006 l

tm c

Vice President, Nuclear Form No EPA 4500 (8-91)

(Generated by SWIMS)

Formerly EPA SURI Page I of 1

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Rd.

Perry OH 44081 Station Code:

602 Reported Date (Month Year):

November 2006 Application 31B00016*GD 12/13/2006 Sampling Station Description Discharge from Chemical Cleaning Lagoon Reporting Code Result Date Additional Remarks 00980 11/01/2006 No discharge performed this month Mdl

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station Code:

Reported Date (Month Year)

Application 12/612006 Perry Nuclear Power Plant 800 November 2006 31B00016*GD Perry Nuclear Power Plant 10 Center Rd.

Sampling Station Description PerryOH44081 Intake Water from Lake Erie in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab Analyst:

in(2) - Enter frequency of sampling CCB125 Liz Ryan

-(1)

3 m

(2)1 1

999 (01119)

(00011)

Copper, Total Water Temperature I

Recoverable F

Day ug/li 02 49 03 48 I

04 46 05 49 i

07 2.9 47 08 47..-i 09 48 10 50 11 51 12 49 I

13 48I 14I2_

47 16 48i 17 49i

-18 48 19 48 21

-46 22 45I 23 45 24 46 256 4

26 46 26 -

. ~ ~ -------

~

~

. ~.....

L..

..L....

27 47

~-----

28 47 29 47 30 48 31 TOTAL 2.9 1427 0

0 0

00 AVG 2.9 47.5667 MAX 2.9 51 MIN 2.9 45 0

0 0

0 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submittingfae information, including the possibility of fine and imprisonment.

Date Report Completed:

Sii fl~epoirr/

Title of Reporter:

12/06/2006 e

U/--.

I("d'..e i

Vice President, Nuclear Form No EPA 4500 (8-91)

(Generated by SWIMS)

Formerly EPA SURI Page 1 of 1

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Rd.

Perry OH 44081 Station Code:

800 Reported Date (Month Year):

November 2006 Application 31B00016*GD 12/6/2006 Sampling Station

Description:

Intake Water from Lake Erie