ML063490324
| ML063490324 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/04/2007 |
| From: | Martin R NRC/NRR/ADRO/DORL/LPLII-1 |
| To: | Grissette D Southern Nuclear Operating Co |
| Martin R, NRR/DORL, 415-1493 | |
| References | |
| GL-06-003, TAC MD1645, TAC MD1646 | |
| Download: ML063490324 (3) | |
Text
January 4, 2007 Mr. D. E. Grissette Vice President Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, AL 35201-1295
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, RECEIPT OF RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NOS. MD1645, MD1646)
Dear Mr. Grissette:
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response, dated June 9, 2006, to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, your response states that Vogtle Electric Generating Plant, Units 1 and 2, do not rely on the Hemyc and MT fire barrier systems. Under oath and affirmation, your response also states that other fire barrier systems that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. Based on your response, the basis for stating that these other fire barriers have been designed and installed in accordance with current NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please contact me at 301-415-1493 or rem@nrc.gov.
Sincerely,
/RA/
Robert E. Martin, Sr. Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425 cc: See next page
January 4, 2007 Mr. D. E. Grissette Vice President Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, AL 35201-1295
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, RECEIPT OF RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NOS. MD1645, MD1646)
Dear Mr. Grissette:
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response, dated June 9, 2006, to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, your response states that Vogtle Electric Generating Plant, Units 1 and 2, do not rely on the Hemyc and MT fire barrier systems. Under oath and affirmation, your response also states that other fire barrier systems that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. Based on your response, the basis for stating that these other fire barriers have been designed and installed in accordance with current NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please contact me at 301-415-1493 or rem@nrc.gov.
Sincerely,
/RA/
Robert E. Martin, Sr. Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425 cc: See next page DISTRIBUTION:
Public RidsAcrsAcnwMailCenter LPL2-1 R/F RidsNrrDraAfpb (CMoulton)
RidsNrrDorlL2-1 (EMarinos)
RidsRgn2MailCenter(KLandis)
RidsNrrDorlDpr RidsNrrPMRMartin (hard copy)
RidsNrrLAMOBrien (hard copy)
RidsOgcRp ADAMS No: ML063490324 OFFIC E
NRR/LPL2-1/PM NRR/LPL2-1/PM NRR/LPL2-1/LA AFPB/FPE NRR/LPL2-1/BC NAME RMartin BSingal MOBrien CMoulton EMarinos DATE 01/4/07 01/4/07 12/28/06 01/04/07 01/4/07 OFFICIAL RECORD COPY
Vogtle Electric Generating Plant, Units 1 & 2 cc:
Mr. D. E. Grissette, Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. T. E. Tynan, General Manager Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
7821 River Road Waynesboro, GA 30830 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Arthur H. Domby, Esquire Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216 Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA 30830 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830