Withdrawal of Relief Request Regarding Inservice Inspection of Reactor Pressure vessel-retaining nozzle-to-vessel Welds and Inner Radii
ML063490120
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/27/2006
From: Thomas Wengert
Plant Licensing Branch III-2
To: Pearce L
FirstEnergy Nuclear Operating Co
Wengert, Thomas
References
TAC MD3038
Download: ML063490120 (4)


Text

December 27, 2006 Mr. L. W. Pearce Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - WITHDRAWAL OF RELIEF REQUEST REGARDING INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL-RETAINING NOZZLE-TO-VESSEL WELDS AND INNER RADII (TAC NO. MD3038)

Dear Mr. Pearce:

By letter dated September 5, 2006 (letter number PY-CEI/NRR-2983L), FirstEnergy Nuclear Operating Company (FENOC) submitted Relief Request IR-054 for Perry Nuclear Power Plant (Perry), Unit 1 from the inservice inspection requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, for reactor pressure vessel pressure-retaining nozzle-to-vessel welds and nozzle inner radii. Included in the submittal letter was acknowledgment that the approval of the request was contingent on the NRC staffs issuance of the final safety evaluation (SE) of the Electric Power Research Institute (EPRI) Technical Report 1003557, BWRVIP-108: BWR Vessel and Internals Project, Technical Basis for the Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii.

Since the issuance of the NRC staffs SE for EPRI Technical Report 1003557 is not anticipated in the near future, FENOC subsequently withdrew this relief request in a letter dated November 30, 2006.

The purpose of this letter is to advise that the above cited application is being treated as withdrawn. This completes the NRC staffs review of Relief Request IR-054 submittal under TAC No. MD3038.

Sincerely,

/RA/

Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440 cc: See next page

December 27, 2006 Mr. L. W. Pearce Site Vice President FirstEnergy Nuclear Operating Company P.O. Box 97, A290 10 Center Road Perry, Ohio 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - WITHDRAWAL OF RELIEF REQUEST REGARDING INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL-RETAINING NOZZLE-TO-VESSEL WELDS AND INNER RADII (TAC NO. MD3038)

Dear Mr. Pearce:

By letter dated September 5, 2006 (letter number PY-CEI/NRR-2983L), FirstEnergy Nuclear Operating Company (FENOC) submitted Relief Request IR-054 for Perry Nuclear Power Plant (Perry), Unit 1 from the inservice inspection requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, for reactor pressure vessel pressure-retaining nozzle-to-vessel welds and nozzle inner radii. Included in the submittal letter was acknowledgment that the approval of the request was contingent on the NRC staffs issuance of the final safety evaluation (SE) of the Electric Power Research Institute (EPRI) Technical Report 1003557, BWRVIP-108: BWR Vessel and Internals Project, Technical Basis for the Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii.

Since the issuance of the NRC staffs SE for EPRI Technical Report 1003557 is not anticipated in the near future, FENOC subsequently withdrew this relief request in a letter dated November 30, 2006.

The purpose of this letter is to advise that the above cited application is being treated as withdrawn. This completes the NRC staffs review of Relief Request IR-054 submittal under TAC No. MD3038.

Sincerely,

/RA/

Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440 cc: See next page DISTRIBUTION:

PUBLIC LPL3-2 R/F RidsNrrPMTWengert RidsNrrDciCvib RidsOgcRp RidsNrrLAEWhitt RidsRgn3MailCenter RidsNrrDorlLpl3-2 RidsAcrsAcnwMailCenter RidsNrrDciCpnb Adams accession no. ML063490120 NRR-106 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC (A)

NAME TWengert:mw EWhitt MMarshall DATE 12/20/06 12/20/06 12/27/06 OFFICIAL RECORD COPY

Perry Nuclear Power Plant, Unit 1 cc:

David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Resident Inspector's Office U.S. Nuclear Regulatory Commission P.O. Box 331 Perry, OH 44081-0331 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road Lisle, IL 60532-4531 Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, OH 44060 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A210 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Mayor, Village of North Perry North Perry Village Hall 4449 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-7150 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Zack A. Clayton DERR Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081 Daniel Z. Fisher Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH 43215-3793 Joseph J. Hagan Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GHE-315 395 Ghent Road Akron, OH 44333 Gary R. Leidich President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308

Perry Nuclear Power Plant, Unit 1 cc:

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-115 395 Ghent Road Akron, OH 44333 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308